Driving Through Time - The Digital Blue Ridge Parkway
About this Image
| Title | Grandfather Mtn. Road/Bridge Construction |
| Date | October 2, 1981 |
| Description | Two workers at a construction site inspecting boulder stabilization work on Project 2H-7 near Pier no. 4 at milepost 305, section 2H of the Blue Ridge Parkway. Taken by C.E. Westveer, Bob Hope, and Robert G. Bruce on October 2, 1981. |
| Location |
Location Name: Grandfather Mountain Parkway Milepost: None Latitude: 36.111239 Longitude: -81.8114991 |
| Creator Individuals |
Robert G. Bruce
Robert Hope C.E. Westveer |
| Tags |
Avery County (N.C.)
Bridge construction Construction Grandfather Mountain (N.C.) People Photographs Rocks Workers |
| Credit | Courtesy National Park Service, Blue Ridge Parkway |




