Driving Through Time - The Digital Blue Ridge Parkway
About this Image
| Title | #4 Bridge Construction |
| Date | October 5, 1936 |
| Description | Photograph shows stone abutments and bridge with wooden framework under construction, with construction equipment visible on top of bridge, in section 2A of the Blue Ridge Parkway. |
| Commentary | "Ahead at left wing #1 abutment along left side of partly completed bridge #4." |
| Location |
Location Name: Section 2A Parkway Milepost: None |
| Creator Individual | W.D. Stanton |
| Tags |
Abutments
Bridge construction Bridges Construction Construction equipment Machinery Photographs Rocks Stone carving Stonemasonry |
| Credit | Courtesy of the North Carolina State Archives |




