Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
CCC Group near Truck Shelter
1940 - 2.
Road and Parking Area - Brinegar Cabin
1941 - 3.
Sign Types and Location
1941 - 4.
Mabry Mill before restoration
1941 - 5.
Radio sub-station and tower
1941 - 6.
Mabry Mill before restoration
1941 - 7.
Mabry Mill before restoration
1941 - 8.
Mabry Mill before restoration
1941 - 9.
CCC Park Service Personnel Quarters, NP Camp 21
1940 - 10.
Office and Tool Storage Building (construction)
1941 - 11.
CCC Bulldozer and Truck
1940 - 12.
Park warden's pick-up showing fire tools
1941 - 13.
Park Wardens pick-up
1941 - 14.
Office and tool storage building and radio tower
1941 - 15.
Hose pack in use
1941 - 16.
Hose pack for Pacific Marina Pump
1941 - 17.
Fire Tool Box
1941 - 18.
Fire Presuppression Unit in Camping and Picnic Areas
1941 - 19.
Comfort station Trailer are
1941 - 20.
Completed Comfort Station and Trail Shelter
1941 - 21.
Soil Erosion
1941 - 22.
Bluff Park Blacksmith and Repair Garage
1941 - 23.
Seeding and staked mulch (in Bluff Park)
1941 - 24.
Seeding and staked mulch (in Bluff Park)
1941 - 25.
Blacksmith and Repair Garage (construction)
1941 - 26.
Jesse Brown Log Spring House Bldg #295
1941 - 27.
Land Acquisition Maps Section 2-F
1941 - 28.
Office and Tool Storage Building
1941 - 29.
Cool Springs Baptist Church, Bldg #296
1940s - 30.
Cool Springs Baptist Church, Bldg #296
1940s - 31.
Overpass at Buck Creek Gap
January 21, 1941 - 32.
Dodds Creek before sloping
February 1941 - 33.
Dodds Creek before sloping
February 1941 - 34.
Rock Wall
February 18, 1941 - 35.
Rock Wall
February 18, 1941 - 36.
Rock Wall
February 18, 1941 - 37.
Rock Wall
February 18, 1941 - 38.
Overpass at Buck Creek Gap
February 18, 1941 - 39.
Shows pile of rocks and stumps into which car dove and car at rest after plunge
February 22, 1941 - 40.
Shows road alignment. Figure stands at point of departure
February 22, 1941 - 41.
Shows road alignment, looking back in direction from which car approached. Figure at point of departure
February 22, 1941 - 42.
The wrecked car.
February 22, 1941 - 43.
Shows road alignment. Figure stands at point of departure
February 22, 1941 - 44.
Figure at point wheels left road. Two stakes in foreground point of departure from shoulder
February 22, 1941 - 45.
Point of departure marked by figure; angle of slope, wrecked car at rest
February 22, 1941 - 46.
Damage to vehicle. Note points of contrast
February 23, 1941 - 47.
The wrecked car.
February 23, 1941 - 48.
Alignment of road. Far figure, wheel of R side; middle figure, start of plunge; near figure, directly above wreck.
February 23, 1941 - 49.
Show slope. Figure at top to figure holding white paper, Extreme lower left, marks course
February 23, 1941 - 50.
The wreck, left front view
February 23, 1941 - 51.
The wreck, right front view
February 23, 1941 - 52.
R. Foster
February 23, 1941 - 53.
R. Foster
February 23, 1941 - 54.
$746,925 Parkway Project Started Monday at Soco Gap
March 27, 1941 - 55.
Trench
March 28, 1941 - 56.
Carloads of Heavy Machinery Unloaded for Parkway Project
April 3, 1941 - 57.
Completed Parkway Wall
April 10, 1941 - 58.
Wall Construction
April 10, 1941 - 59.
Parkway Wall
April 10, 1941 - 60.
Gray Fox Cub
May 1941 - 61.
Gray Fox Cub
May 1941 - 62.
Over Million Dollars In Road Work Under Construction
May 15, 1941 - 63.
Parkway Opened at Many Points
May 22, 1941 - 64.
Guard Wall Stones
May 22, 1941 - 65.
Guard Wall
May 22, 1941 - 66.
Guard Wall
May 22, 1941 - 67.
Grade Separation, South Abutment
June 30, 1941 - 68.
Steps - Pedestrian Over look at Falls
June 30, 1941 - 69.
South Abutment, Grade Separation
June 30, 1941 - 70.
Wall and steps - Pedestrian overlook at Falls
June 30, 1941 - 71.
Top and inside of wall. Sample section of guard wall.
July 1, 1941 - 72.
Back of wall. Sample section of guard wall
July 1, 1941 - 73.
Pasture Restoration (after) Beng, N.C.
July 26, 1941 - 74.
Sheet erosion control (after)
July 26, 1941 - 75.
Gully control (after)
July 26, 1941 - 76.
Gully Control (after) Beng, N.C.
July 26, 1941 - 77.
Gully control (after)
July 26, 1941 - 78.
Gully control (after)
July 26, 1941 - 79.
Pasture Restoration (after) Watson's land Beng, N.C.
July 26, 1941 - 80.
Alligator Back Sheet erosion control (after)
July 26, 1941 - 81.
Gully control (afer)
July 26, 1941 - 82.
Pasture Restoration (After)
July 26, 1941 - 83.
Guard wall (sample section)
August 1941 - 84.
Guard wall (sample sec.) Show rear elevation of wall and rear batter.
August 1941 - 85.
Severe sheet and some gully erosion (before)
August 1941 - 86.
Guard Wall (sample section) to show alignment on coping
August 1941 - 87.
Gully and sheet erosion work completed
August 1941 - 88.
Guard wall (sample section) To show alignment on coping
August 1941 - 89.
Guard wall (sample sec.) Show Parkway elevation of wall
August 1941 - 90.
Landscaping Work Along Parkway Is Being Halted
August 12, 1941 - 91.
Mabry Mill site
September 1941 - 92.
Martin Brinegar Cabin
September 1941 - 93.
Martin Brinegar Cabin
September 1, 1941 - 94.
Meadow Fork Overpass
September 22, 1941 - 95.
Parkway Meadowfork Valley Showing streamside location
September 22, 1941 - 96.
Parkway Meadowfork Valley
September 22, 1941 - 97.
Parkway - Meadowfork Valley
September 22, 1941 - 98.
Parkway - Meadowfork Valley
September 22, 1941 - 99.
Grandfather Mountain from Beacon Heights
September 24, 1941 - 100.
Grandfather Mountain
September 28, 1941 - 101.
Grandfather Mountain
September 28, 1941 - 102.
Portal Devils Courthouse
September 29, 1941 - 103.
Old "Silver Mine"
September 29, 1941 - 104.
Tunnel Lining Devils Court House
September 29, 1941 - 105.
Incinerator Construction
October 1941 - 106.
Incinerator Construction
October 1941 - 107.
Incinerator Construction
October 1941 - 108.
Incinerator Construction
October 1941 - 109.
Severe sheet and some gully erosion (after) see neg# 5436
November 1941 - 110.
Incinerator, door details
November 1941 - 111.
Incinerator Ratchet door
November 1941 - 112.
Gully and sheet erosion (work started)
November 1941 - 113.
Incinerator Construction progress
November 1941 - 114.
Brinegar Cabin east elevation
November 1941 - 115.
Gully and sheet erosion (mulching with pine)
November 1941 - 116.
Brinegar cabin, east elevation chimney detail
November 1941 - 117.
Brinegar cabin, Bluff Park East elevation chimney detail
November 1941 - 118.
Brinegar ?Cabin Hewing north sill
November 1941 - 119.
Brinegar Cabin Hewing log for north sill WPA labor
November 1941 - 120.
Brinegar Cabin Interior, fireplace detail
November 1941 - 121.
Shows active gully and sheet erosion (before)
November 1941 - 122.
Brinegar Cabin west elevation footing detail
November 1941 - 123.
Brinegar Cabin, Bluff Park, East elevation chimney detail
November 1941 - 124.
Wheel Gate
November 1941 - 125.
Wheel Gate
November 1941 - 126.
Incinerator Construction progress
November 1941 - 127.
Brinegar Cabin South elevation - storehouse
November 1941 - 128.
Brinegar Cabin, Front Elevation
November 1941 - 129.
Brinegar cabin east elevation - storehouse footing detail
November 1941 - 130.
Brinegar cabin east elevation footing detail
November 1941 - 131.
Brinegar cabin east elevation footing detail
November 1941 - 132.
Brinegar cabin west elevation footing detail
November 1941 - 133.
Brinegar cabin west elevation footing detail
November 1941 - 134.
Brinegar cabin east elevation footing detail
November 1941 - 135.
Brinegan cabin East elevation - storehouse
November 1941 - 136.
Brinegar Cabin, Rear Elevation Details
November 1941 - 137.
Brinegar Cabin, Interior - North Sill Replaced
November 1941 - 138.
Brinegar Cabin, Interior - North Sill Replaced
November 1941 - 139.
Brinegar Cabin before restoration
November 1941 - 140.
Gully control (after) Beng, N.C.
November 1941 - 141.
Proposed Location of Project 2-G near Blowing Rock
November 27, 1941 - 142.
Proposed Location of Project 2-G near Blowing Rock
November 27, 1941 - 143.
Proposed Location of 2-G
November 27, 1941 - 144.
Brinegar Cabin, Timber Walls Exposed and Window Detail
December 1941 - 145.
Brinegar Cabin - Parking Area Retaining wall - inside
December 1941 - 146.
Brinegar Cabin Old roof Northeast corner
December 1941 - 147.
Brinegar Cabin Lean-to exposed West elevation
December 1941 - 148.
Brinegar Cabin Parking area Retaining wall outside
December 1941 - 149.
Brinegar Cabin Lean-to framing exposed
December 1941 - 150.
Brinegar Cabin Framing Detail, Lean-to
December 1941 - 151.
Brinegar Cabin Southwest Corner
December 1941 - 152.
Brinegar Cabin window detail on west wall
December 1941 - 153.
Brinegar Cabin Southwest Elevation lean-to framing
December 1941 - 154.
Brinegar Cabin Framing Detail, Lean-to
December 1941 - 155.
Brinegar Cabin timber wall and exposed window details
December 1941 - 156.
Brinegar Cabin, Window Detail on West Wall
December 1941 - 157.
Line "A" near Ridge at Grandfather Mountain
December 8, 1941 - 158.
Line "A" near Ridge at Grandfather Mountain
December 8, 1941 - 159.
Proposed "A" Line of Section 2-G near Blowing Rock
December 9, 1941 - 160.
Proposed Location of Project 2-G near Blowing Rock
December 9, 1941 - 161.
Proposed "A" Line of Section 2-G near Blowing Rock
December 9, 1941 - 162.
Proposed "A" Line of Section 2-G near Blowing Rock
December 9, 1941
Refine Your Search
Types (3)
Photographs (154) Newspaper Articles (5) Maps (3)Locations (36)
Brinegar Cabin (33) Milepost 251 (13) Doughton Park (10) Bluff Park (8) Milepost 238 (8) Milepost 268 (8) Milepost 237 (6) Section 2C (6) Section 2M (6) Blowing Rock (5) See All ResultsSections (15)
2C (85) 2E (23) 2D (13) 2F (8) 2M (6) 1T (5) 2G (4) 2V (3) 1R (2) 1V (2) See All ResultsCounties (12)
Alleghany (85) Ashe (24) Watauga (12) Wilkes (12) Floyd (7) Yancey (6) Avery (3) Transylvania (3) Buncombe (2) Carroll (2) Jackson (2) Haywood (1)



