Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Bridge
September 18, year unknown
-
Road construction
1930s
-
Before grading. 1:1 cut gullying badly; too steep to grass; flatten and round for grass
July 25, 1935
-
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935
-
First Grading Contract
September 1935
-
First Grading Contract
September 1935
-
First Gradeing Contract
September 1935
-
Early Construction
November 1, 1935
-
General view construction through low area
November 26, 1935
-
General view of construction rough grading
November 26, 1935
Items in Query
Results: 119
Refine Your Search
Types (2)
Photographs (118) Oral Histories (1)Locations (31)
Section 2C (39) Section 2A (22) Air Bellows Gap (5) Milepost 238 (5) Doughton Park (4) Milepost 218 (4) Milepost 225 (4) Milepost 227 (3) Milepost 232 (3) Milepost 240 (3) Milepost 217 (2) Milepost 221 (2) Milepost 228 (2) Milepost 231 (2) Milepost 241 (2) Milepost 247 (2) Alleghany County (1) Bluffs (1) Brinegar Cabin (1) Cumberland Knob (1) Devil's Garden (1) Junction of 2A/2B (1) Milepost 219 (1) Milepost 223 (1) Milepost 224 (1) Milepost 226 (1) Milepost 229 (1) Milepost 230 (1) Milepost 239 (1) Milepost 242 (1) Milepost 244 (1)Sections (3)
2C (60) 2A (46) 2B (12)Counties (1)
Alleghany (119)