Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Building the end wall
1930s
-
Special headwall 10' x 7' R.C. box
May 25, 1935
-
Special Headwall, 10' x 7' R.C. Box
May 25, 1935
-
Before grading. Soft gullying material above rock. Flatten expose hard rock. Wide rounding.
July 25, 1935
-
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935
-
First Grading Contract
September 1935
-
First Grading Contract
September 1935
-
Top soil stripping operations
November 26, 1935
-
Drilling Operations
May 2, 1936
-
Heavy Machinery and Construction
May 23, 1936
Items in Query
Results: 53
Refine Your Search
Types (1)
Photographs (53)Locations (15)
Section 2C (18) Section 2A (11) Milepost 226 (5) Cumberland Knob (4) Milepost 228 (3) Milepost 224 (2) Milepost 241 (2) Bluff Park (1) Milepost 218 (1) Milepost 219 (1) Milepost 225 (1) Milepost 234 (1) Milepost 240 (1) Milepost 244 (1) Section 2B (1)Sections (3)
2A (28) 2C (23) 2B (2)Counties (1)
Alleghany (53)