- 1.
Bluff Park Bridle Trail, looking toward Bluff
January 5, 1936 - 2.
Bluff Park Culvert Grassy Gap Road
January 5, 1936 - 3.
The Bluffs, Sec 2C Rhododendron Valley from Inn site (Doughton Park)
August 2, 1936 - 4.
Chimney, clay-mortar stone. Holloway place
February 13, 1936 - 5.
Chimney, clay mortar stone, Holloway place. Chimney details showing stone generally found along parkway, Sec 1P through 2F.
February 14, 1936 - 6.
Chimney, clay-mortar stone, Holloway place.
February 14, 1936 - 7.
Chimney, clay-mortar stone Holloway place
February 14, 1936 - 8.
Chimney, clay-mortar stone, Holloway place
February 14, 1936 - 9.
Chimney dry-laid stone. D.F. Wagoner Place
February 14, 1936 - 10.
Chimney, dry-laid stone. D.F. Wagoner place.
February 14, 1936 - 11.
Holloway Place
February 14, 1936 - 12.
Stone work detail Class B masonry retaining wall See neg# 5951
February 15, 1936 - 13.
Retaining wall, class B masonry
February 15, 1936 - 14.
Retaining wall class B masonry See #5951
February 15, 1936 - 15.
Retaining wall, Class B, masonry. See neg# 5951
February 15, 1936 - 16.
Dry Masonry Stone Foundation, slaty schist.
February 19, 1936 - 17.
Inlet headwall-pipe culvert
February 19, 1936 - 18.
Vertical View of Ice Rock
February 26, 1936 - 19.
Overpass at Meadow Fork
March 4, 1936 - 20.
General ground conditions, showing erosion
April 16, 1936 - 21.
Type #3 headwall, single
April 16, 1936 - 22.
Type #1 Headwall, Single
April 16, 1936 - 23.
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936 - 24.
Arch-cut Stone, Double Box Culvert
April 16, 1936 - 25.
General Ground Conditions Showing Stream Conditions
April 16, 1936 - 26.
Arch + cut stone - double box culvert
April 16, 1936 - 27.
General ground conditions showing stream conditions
April 16, 1936 - 28.
Type #1 headwall, single
April 16, 1936 - 29.
Early Construction
April 17, 1936 - 30.
The Bluff, View of Basin Cedar Ridge
April 20, 1936 - 31.
Picnic area before clearing
April 21, 1936 - 32.
Road construction
April 27, 1936 - 33.
Cumberland Knob Picnic Area
April 28, 1936 - 34.
Cumberland Knob Picnic Area
April 28, 1936 - 35.
Masonry in retaining wall Class B
April 29, 1936 - 36.
Drilling Operations
May 2, 1936 - 37.
View of Wagon Drill
May 2, 1936 - 38.
Bridge Tunnel
May 15, 1936 - 39.
Parkway Road
May 23, 1936 - 40.
Bridge Tunnel
May 23, 1936 - 41.
Heavy Machinery and Construction
May 23, 1936 - 42.
Masonry Wall
May 23, 1936 - 43.
Bridge Construction
May 23, 1936 - 44.
Bridge Tunnel
May 23, 1936 - 45.
Parkway Road
May 23, 1936 - 46.
Parkway Road
May 23, 1936 - 47.
Parkway Road
May 23, 1936 - 48.
Parkway Road
May 23, 1936 - 49.
Special headwall, Type #1 10' x 7' Box
May 25, 1936 - 50.
Cribbing check dams with brush back-fill
May 25, 1936 - 51.
Log Cribbing and Check Dams for Erosion Control
May 25, 1936 - 52.
Log cribbing and check for erosion control
May 26, 1936 - 53.
Log cribbing and check dams for erosion control
May 26, 1936 - 54.
Log Cribbing and Check Dams for Erosion Control
May 26, 1936 - 55.
Switchback on trail from Cumberland Knob, picnic area to gulley. Creek showing ramps.
May 30, 1936 - 56.
Clearing below Knob, Looking toward Spur
May 30, 1936 - 57.
Open grassy area on Knob, looking west
May 30, 1936 - 58.
Construction of Crib-Work for Trail
June 2, 1936 - 59.
Completed Cribbing "Spur Trail"
June 15, 1936 - 60.
Cribbing of trail, almost complete "Spur Trail"
June 15, 1936 - 61.
Completed Shuttle Trail, Looking Ahead
June 15, 1936 - 62.
Trail Route, Before Construction "Indian Grave Trail"
June 15, 1936 - 63.
Completed Trail, Indian Grave Trail
June 15, 1936 - 64.
Channel Change at Bridge Site #10 (Section 2A)
June 23, 1936 - 65.
Pre-Asphalt Road in Section 2A
June 23, 1936 - 66.
Detail View of Bridge #1 Construction
June 23, 1936 - 67.
Early Road Cut in Section 2A
June 23, 1936 - 68.
Coarse Stone Road in Section 2A
June 23, 1936 - 69.
Bridge Site #10 Prior to Construction
June 23, 1936 - 70.
Culvert at Station 517
June 23, 1936 - 71.
Detailed View of Bridge Abutment
June 23, 1936 - 72.
Bridge #6 During Construction (Section 2A)
June 23, 1936 - 73.
Unique Culvert Near Station 262
June 23, 1936 - 74.
Detail View of Bridge Site #6
June 23, 1936 - 75.
Early Construction
June 26, 1936 - 76.
Early Construction in section 2C
June 26, 1936 - 77.
Baffles
June 30, 1936 - 78.
Cement Masonry
June 30, 1936 - 79.
Right Hand Beam
July 13, 1936 - 80.
4th switch and rest bench site
July 14, 1936 - 81.
Section of Trail Under Construction - Gully Creek
July 14, 1936 - 82.
Bridge #1 left-handed beam
July 14, 1936 - 83.
A Step Detail in Indian Grave Trail
July 14, 1936 - 84.
Pre-Asphalt Parkway Near Virginia Border
July 22, 1936 - 85.
Partially Completed Overlook
July 22, 1936 - 86.
Early Construction
July 22, 1936 - 87.
View of Machined-Flattened Parkway
July 22, 1936 - 88.
Early Construction of Bridge in Section 2A
July 22, 1936 - 89.
River/Trench
July 22, 1936 - 90.
Car on winding road
July 22, 1936 - 91.
Vehicle Tracks
July 22, 1936 - 92.
Bridge Construction Site in Section 2A
July 22, 1936 - 93.
"Bridge 3" Construction in Section 2A
July 22, 1936 - 94.
Bridge Construction in Section 2A
July 22, 1936 - 95.
Side view Bridge Construction in Section 2A
July 22, 1936 - 96.
First Parkway Crossing of NC 18, Near Sparta, NC
July 22, 1936 - 97.
Bridge site east side looking south
July 23, 1936 - 98.
Cement Rock Wall
July 23, 1936 - 99.
Shovel loading
July 23, 1936 - 100.
Road Between Hills
July 23, 1936 - 101.
Path North over Proposed Bridge
July 23, 1936 - 102.
Early Construction
July 23, 1936 - 103.
Under Drain
July 23, 1936 - 104.
Bridge 2
July 23, 1936 - 105.
Part of #2 Abutment Face
July 23, 1936 - 106.
Culvert Head Wall
July 23, 1936 - 107.
Cumberland Knob #1
July 23, 1936 - 108.
Drilling
July 23, 1936 - 109.
Unpaved Road #1
July 23, 1936 - 110.
Cumberland Knob
July 23, 1936 - 111.
Wall 611
July 23, 1936 - 112.
Bridge site #1 east side looking north
July 23, 1936 - 113.
Line Guides
July 23, 1936 - 114.
Valley
July 23, 1936 - 115.
#9 Bridge
July 23, 1936 - 116.
Paths
July 23, 1936 - 117.
Completed Rough Grade
July 28, 1936 - 118.
Doughton Park #1
July 28, 1936 - 119.
steep side hill
July 28, 1936 - 120.
mixer
July 28, 1936 - 121.
Early Construction
July 29, 1936 - 122.
Roadway
July 29, 1936 - 123.
Clearing operations
July 29, 1936 - 124.
Wright property. View showing small pine trees cut by the owner
August 1936 - 125.
Meadow Fork - View looking south from edge of parkway
August 1936 - 126.
Waterfall Cumberland Knob
August 1936 - 127.
View from Top Looking Direction of Fishers Peak
August 1936 - 128.
Cumberland Knob
August 1936 - 129.
Wright Property, View Showing Small Pine Trees Cut by the Owner
August 1936 - 130.
View from Highest Point in Cumberland Knob
August 1936 - 131.
Fern Covered Rock along Trail
August 1936 - 132.
View showing small pine trees cut by the owner, Wright property
August 1936 - 133.
View of small waterfall. Camera at intersection of trail and stream
August 1936 - 134.
View looking south along parkway
August 1936 - 135.
Bench along trail at a point 100 yards from picnic area.
August 1936 - 136.
View from Cumberland Knob
August 1936 - 137.
Cumberland Knob waterfall
August 1936 - 138.
Small waterfall, Camera placed at intersection of trail and stream
August 1936 - 139.
Bridge site #6 Southwest wing wall
August 3, 1936 - 140.
The Bluffs Sec 2C Wildcat Rocks, Inn site (Doughton Park)
August 3, 1936 - 141.
Wildcat Rocks
August 3, 1936 - 142.
Southwest wing wall
August 4, 1936 - 143.
Bridge #6 Northwest wing wall
August 4, 1936 - 144.
Northwest wing wall. Bush Creek Bridge.
August 4, 1936 - 145.
Bridge Site #6, Southwest Wing Wall, Pine Creek Bridge No. 6
August 4, 1936 - 146.
Southeast wing wall
August 4, 1936 - 147.
Willow planted along channel change, 10 days after planting
August 13, 1936 - 148.
Buck Creek Gap
August 14, 1936 - 149.
Mountain slope and construction
August 20, 1936 - 150.
Hand-placed rock wall
August 20, 1936 - 151.
Early Construction
August 21, 1936 - 152.
Bridge and Abutment Construction
August 22, 1936 - 153.
Hare Mill Pond, scenic view
August 22, 1936 - 154.
Road View
August 22, 1936 - 155.
Bridge and Abutment Construction
August 22, 1936 - 156.
Bridge and Abutment Construction
August 22, 1936 - 157.
Bridge Construction
August 22, 1936 - 158.
Early Construction
August 22, 1936 - 159.
Curved Head Wall
August 22, 1936 - 160.
Bridge Construction
August 22, 1936 - 161.
Bridge and Abutment Construction
August 22, 1936 - 162.
Bridge and Abutment Construction
August 22, 1936 - 163.
View of Parkway
August 22, 1936 - 164.
Ahead at site of excavation for bridge #4.
August 22, 1936 - 165.
Hare Mill Pond, scenic view
August 22, 1936 - 166.
Bridge 4, excavation site
August 22, 1936 - 167.
Bridge and Abutment
August 22, 1936 - 168.
Bridge and Abutment Construction
August 22, 1936 - 169.
Retaining Wall
August 22, 1936 - 170.
Road View
August 22, 1936 - 171.
Bridge 10, site of construction
August 23, 1936 - 172.
Stone masonry wall
August 23, 1936 - 173.
Rock wall on side of road
August 23, 1936 - 174.
Excavation for tree well
August 23, 1936 - 175.
Bridge 10, site of construction
August 23, 1936 - 176.
Road construction
August 24, 1936 - 177.
View of Head Wall
August 24, 1936 - 178.
Early Construction
August 24, 1936 - 179.
Road construction
August 24, 1936 - 180.
Rock slope in woods
August 24, 1936 - 181.
Bridge 10, site of construction
August 25, 1936 - 182.
South abutment
August 26, 1936 - 183.
Stone detail
August 26, 1936 - 184.
After stream improvement
August 26, 1936 - 185.
Plant group left of parkway
August 27, 1936 - 186.
Close-up of plant group left of parkway
August 27, 1936 - 187.
Plant group left of parkway
August 27, 1936 - 188.
View of Trail Leading to Cumberland Knob from the Parking Area
August 31, 1936 - 189.
View of Rock cut looking south
September 1936 - 190.
Bluffs Park, view from Wild Cat to Basin Creek
September 1936 - 191.
View from parkway looking east down small revine south of Knob
September 1936 - 192.
View from edge of parkway, 1 looking north along alignment towad Cumberland Knob Park Area
September 1936 - 193.
View of small water fall and stream which crosses the trail at the point where the camera is placed
September 1936 - 194.
Cabin within 100' right-of-way, looking north
September 1936 - 195.
Latest wagon drill in action. View looking south from point toward Bluffs
September 1936 - 196.
Side view from parkway near Ice Rocks
September 1936 - 197.
Construction of New Blue Ridge Parkway Means Much To Our County
September 3, 1936 - 198.
Bridge Site #6, Southwest Wing Wall Under Construction
September 4, 1936 - 199.
Bridge site #6 Southeast wing wall under construction
September 4, 1936 - 200.
View from Highest Point Looking Northeast
September 8, 1936 - 201.
Looking east toward Pilot Mountain which is shown very faintly in middle center of picture
September 8, 1936 - 202.
View looking south along parkway
September 8, 1936 - 203.
View of Fishers Peak from Trail
September 8, 1936 - 204.
Intersection of North Carolina 18 and parkway View of parkway looking north
September 9, 1936 - 205.
View of parkway, looking north through wooded area. One of the few places where trees meet overhead.
September 9, 1936 - 206.
Valley farm land. This is near but not within sight of the parkway
September 11, 1936 - 207.
Falls in Basin Creek Bluff Park
September 11, 1936 - 208.
View of falls on Basin Creek
September 11, 1936 - 209.
View looking north along cut through Ice Rock section of Parkway near Bluffs Park area
September 11, 1936 - 210.
View of the Bluffs from Basin Creek Valley near Alligator Back.
September 11, 1936 - 211.
View of wide, open area on top of the Bluffs. Looking north
September 11, 1936 - 212.
View looking south along Ice Rock section of parkway
September 11, 1936 - 213.
The Bluffs from point 200 feet from the parkway south of the Bluffs
September 12, 1936 - 214.
Brush Creek Bridge #8, Pier from south
September 16, 1936 - 215.
Bridge #8 Pier
September 16, 1936 - 216.
Brush Creek Bridge #8 Pier
September 16, 1936 - 217.
Roaring Gap Hotel. South wing of hotel
September 18, 1936 - 218.
A view from the hillside opposite of the entrance to Cumberland Knob Park, looking across the Parkway to the park area
October 1936 - 219.
Access Road Construction
October 2, 1936 - 220.
Road Grade near NC Route 18
October 4, 1936 - 221.
Proposed Route 18 Crossing
October 4, 1936 - 222.
Mountain Valley and Barn
October 4, 1936 - 223.
Construction of prop. wall
October 4, 1936 - 224.
Back from Station 5
October 4, 1936 - 225.
Stone Cement Gutter
October 5, 1936 - 226.
Construction on Bridge #8
October 5, 1936 - 227.
Construction at Bridge #4
October 5, 1936 - 228.
Cement Pouring at Bridge #10
October 5, 1936 - 229.
#4 Bridge Construction
October 5, 1936 - 230.
Top of #4 Bridge
October 5, 1936 - 231.
Top of #4 Bridge
October 5, 1936 - 232.
View of Bridge 4 Abutment
October 5, 1936 - 233.
Stone Cement Gutter Construction
October 5, 1936 - 234.
Left Wing of Bridge #4
October 5, 1936 - 235.
Wood and Stone Bridge
October 5, 1936 - 236.
#3 Bridge Construction
October 5, 1936 - 237.
Floor and Side Forms of Bridge #8
October 5, 1936 - 238.
Stone Cement Gutter
October 5, 1936 - 239.
Looking north along parkway showing rock outcropping
October 11, 1936 - 240.
View looking south on parkway
October 12, 1936 - 241.
View looking north along parkway
October 12, 1936 - 242.
View across parkway looking east into escarpment one-half mile south of Cumberland Knob
October 12, 1936 - 243.
View Looking South
October 12, 1936 - 244.
Parkway alignment, looking north
October 12, 1936 - 245.
View looking south from wooded area into open meadow area.
October 12, 1936 - 246.
View of alignment looking north near beginning of section
October 13, 1936 - 247.
View of alignment looking north near beginning of the section.
October 13, 1936 - 248.
Rubble gutter completed
October 13, 1936 - 249.
View looking south along Parkway (Proposed cabin-gas road entrance at far end of cut on left).
October 13, 1936 - 250.
View looking south along parkway
October 13, 1936 - 251.
Gutter termination at pipe headwall
October 13, 1936 - 252.
Bridge #4 Stone detail on east side (Note scale stick)
October 13, 1936 - 253.
General view of road and gutter
October 13, 1936 - 254.
Crushed stone base for rubble gutter
October 13, 1936 - 255.
View looking north on parkway
October 13, 1936 - 256.
View of culvert
October 13, 1936 - 257.
Simple arch culvert on west side of parkway
October 13, 1936 - 258.
Rubble gutter treatment at intersection of secondary road
October 13, 1936 - 259.
Gutter under construction
October 13, 1936 - 260.
Detail of rubble gutter and tile underdrain emerging
October 13, 1936 - 261.
Road alignment looking back
October 13, 1936 - 262.
Road alignment through wooded section
October 13, 1936 - 263.
Detail of rubble gutter - completed
October 13, 1936 - 264.
Looking north along parkway one-half mile south of Cumberland Knob Park entrance
October 13, 1936 - 265.
View looking north toward Pine Spur
October 13, 1936 - 266.
View looking north along Parkway
October 14, 1936 - 267.
Looking North Along Parkway
October 14, 1936 - 268.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 269.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 270.
View of Alligator Back from point down the hill on the east side of the parkway
October 20, 1936 - 271.
Fireplace used in picnic area
October 21, 1936 - 272.
300 feet from beginning of the section, view looking north along parkway
October 21, 1936 - 273.
Picnic Table
October 21, 1936 - 274.
Near Saddle Mountain church. View of right side of two-arch culvert.
October 22, 1936 - 275.
View of left side, looking south, showing detail of stone work
October 22, 1936 - 276.
Bridge #4 Detail of stone work; view of left side
October 22, 1936 - 277.
View of table rock formation in valley to the east of parkway
October 22, 1936 - 278.
Bridge #1 View of left side (looking south). Looking down stream
October 22, 1936 - 279.
Work on Culvert
October 28, 1936 - 280.
Work Across Intersection from 39-20
October 28, 1936 - 281.
Right Head Wall 289
October 28, 1936 - 282.
Cut Ditch and Bank
October 28, 1936 - 283.
Partly Completed Parking
October 28, 1936 - 284.
Drop Inlet Station 29
October 28, 1936 - 285.
Bridge #9 Abutment
October 29, 1936 - 286.
Dressed Slopes and Road Intersection
October 29, 1936 - 287.
Bridge #6 Construction
October 29, 1936 - 288.
Icy Rock Cut (2)
October 31, 1936 - 289.
Rough Grade Work
October 31, 1936 - 290.
Left Head Wall 437
October 31, 1936 - 291.
Icy Rock Cut (3)
October 31, 1936 - 292.
Across Icy Rock Curve
October 31, 1936 - 293.
Front Head Wall 437
October 31, 1936 - 294.
Icy Rock Curve
October 31, 1936 - 295.
Icy Rock Curve (3)
October 31, 1936 - 296.
Right Head Wall 437
October 31, 1936 - 297.
Icy Rock Curve (2)
October 31, 1936 - 298.
Icy Rock Cut (4)
October 31, 1936 - 299.
Icy Rock Cut
October 31, 1936 - 300.
Hare Mill Pond and secondary road
November 10, 1936 - 301.
Hare Mill Pond and road after clean-up
November 10, 1936 - 302.
Parkway at Hare Mill Pond
November 10, 1936 - 303.
Unmaintained county road parallel to parkway
November 11, 1936 - 304.
View on top of the Bluff looking east
November 11, 1936 - 305.
Parkway road and parking area
November 11, 1936 - 306.
View of wide, open area on top of the Bluffs, looking north from point near Wild Cat Rocks
November 11, 1936 - 307.
View from the Bluff looking west along line of Parkway
November 11, 1936 - 308.
Hand-placed rock embankment
November 11, 1936 - 309.
Hand-placed rock embankment
November 11, 1936 - 310.
View looking north across Ice Rock area
November 11, 1936 - 311.
Hand-laid rock embankment
November 11, 1936 - 312.
View looking south across Ice Rock toward hand-laid rock embankmen
November 11, 1936 - 313.
Cut, before grading
November 14, 1936 - 314.
Drop Inlet and Cement Stone Masonry Apron
November 17, 1936 - 315.
Close-up of hand-laid rock embankment
November 19, 1936 - 316.
Station 258, Sec 2B Rock spilled down mountain side
November 19, 1936 - 317.
Culvert at upper end of pond mill side.
November 19, 1936 - 318.
View looking across parkway from east side of bridge
November 19, 1936 - 319.
Hand laid rock embankment showing small stone
November 19, 1936 - 320.
Station 258 Sec 2B Hand-laid rock embankment
November 19, 1936 - 321.
Brush Creek Bridge #8
November 19, 1936 - 322.
Bridge #6 Bridge from east side.
November 19, 1936 - 323.
Station 258, Sec 2B Rock fill adjacent to hand-laid rock embankment
November 19, 1936 - 324.
Station 258. Sec 2B Hand-laid rock embankment and rock fill being placed.
November 19, 1936 - 325.
General view showing machinery making fill through low wet area
November 25, 1936 - 326.
Bridge Construction
December 1, 1936 - 327.
Bridge Construction
December 1, 1936 - 328.
Bridge Frame
December 1, 1936 - 329.
Arch of Bridge
December 1, 1936 - 330.
Pine Creek Bridge #4
December 1, 1936 - 331.
Bridge Construction
December 1, 1936 - 332.
Bridge Construction
December 1, 1936 - 333.
Bridge Construction
December 1, 1936 - 334.
Roadway
December 1, 1936 - 335.
Parking Overlook
December 1, 1936 - 336.
Rounded Roadway
December 1, 1936 - 337.
Bridge Construction
December 1, 1936 - 338.
Bridgeway #2 and Parkway
December 2, 1936 - 339.
Bridge No. 4
December 2, 1936 - 340.
Retaining wall and bridge #2
December 2, 1936 - 341.
Close-up of Bridge #2
December 2, 1936 - 342.
Wood Pile
December 5, 1936 - 343.
Men at HPRE Wall
December 5, 1936 - 344.
Stone Wall
December 5, 1936 - 345.
Through Hills
December 5, 1936 - 346.
Rock Quarry
December 5, 1936 - 347.
Rock Cutting
December 5, 1936 - 348.
HPRE Face
December 5, 1936 - 349.
Prepared Road
December 5, 1936 - 350.
Road with Surface Stone
December 5, 1936 - 351.
Rock and Filling
December 7, 1936 - 352.
Station 386 Bridge #4
December 12, 1936 - 353.
Station 386 Bridge #4
December 12, 1936
Refine Your Search
Types (2)
Photographs (352) Newspaper Articles (1)Locations (42)
Section 2A (82) Section 2C (41) Cumberland Knob (40) Milepost 225 (18) Milepost 224 (17) Milepost 217 (13) Milepost 227 (11) Milepost 218 (10) Milepost 228 (10) Milepost 232 (9) See All ResultsSections (3)
2A (244) 2C (79) 2B (30)Counties (1)
Alleghany (353)