Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Bridge
September 18, year unknown - 2.
Building the end wall
1930s - 3.
Road construction
1930s - 4.
Stone Masons
1935 - 5.
Special Headwall, 10' x 7' R.C. Box
May 25, 1935 - 6.
Special headwall 10' x 7' R.C. box
May 25, 1935 - 7.
Before grading. Gullies and cave-ins. Slope too steep.
July 25, 1935 - 8.
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935 - 9.
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935 - 10.
Before grading. Showing objectionable effect of uniform slopes and insufficient rounding
July 25, 1935 - See All Results
Refine Your Search
Types (3)
Photographs (265) Newspaper Articles (2) Maps (1)Locations (38)
Section 2A (69) Section 2C (39) Doughton Park (16) Milepost 238 (13) Milepost 225 (12) Cumberland Knob (9) Brinegar Cabin (8) Milepost 224 (8) Air Bellows Gap (7) Milepost 226 (7) See All ResultsSections (3)
2A (149) 2C (101) 2B (16)Counties (1)
Alleghany (268)



