Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Bridge
September 18, year unknown - 2.
Road construction
1930s - 3.
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935 - 4.
Before grading. 1:1 cut gullying badly; too steep to grass; flatten and round for grass
July 25, 1935 - 5.
First Gradeing Contract
September 1935 - 6.
First Grading Contract
September 1935 - 7.
First Gradeing Contract
September 1935 - 8.
Early Construction
November 1, 1935 - 9.
General view construction through low area
November 26, 1935 - 10.
General view of construction rough grading
November 26, 1935 - See All Results
Refine Your Search
Types (2)
Photographs (118) Oral Histories (1)Locations (31)
Section 2C (39) Section 2A (22) Air Bellows Gap (5) Milepost 238 (5) Doughton Park (4) Milepost 218 (4) Milepost 225 (4) Milepost 227 (3) Milepost 232 (3) Milepost 240 (3) See All ResultsSections (3)
2C (60) 2A (46) 2B (12)Counties (1)
Alleghany (119)