Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
View of road and gutter
1930s
-
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935
-
Box culvert, 8' x 6', 15° skew
November 26, 1935
-
Box culvert 8' x 6', 15° skew
November 26, 1935
-
Rock filled tiled drain left of center line
November 26, 1935
-
Bluff Park Culvert Grassy Gap Road
January 5, 1936
-
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936
-
Under Drain
July 23, 1936
-
Stone Cement Gutter
October 5, 1936
-
Stone Cement Gutter Construction
October 5, 1936
Items in Query
Results: 53
Refine Your Search
Types (1)
Photographs (53)Locations (14)
Section 2A (13) Section 2C (13) Milepost 221 (4) Doughton Park (3) Milepost 224 (3) Milepost 225 (3) Milepost 227 (3) Milepost 240 (3) Milepost 228 (2) Milepost 247 (2) Bluff Park (1) Milepost 226 (1) Milepost 232 (1) Milepost 237 (1)Sections (3)
2A (29) 2C (23) 2B (1)Counties (1)
Alleghany (53)