Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Special Headwall, 10' x 7' R.C. Box
May 25, 1935
-
Special headwall 10' x 7' R.C. box
May 25, 1935
-
Back of sample wall, showing same stone laid in a more informal treatment, etc
November 13, 1935
-
General view construction through low area
November 26, 1935
-
Top soil stripping operations
November 26, 1935
-
Box culvert 8' x 6', 15° skew
November 26, 1935
-
General view of construction rough grading
November 26, 1935
-
Box culvert, 8' x 6', 15° skew
November 26, 1935
-
Stripped area and top soil storage pile
November 26, 1935
-
Rock filled tiled drain left of center line
November 26, 1935
Items in Query
Results: 86
Refine Your Search
Types (1)
Photographs (86)Locations (16)
Cumberland Knob (18) Milepost 225 (13) Milepost 232 (9) Section 2A (7) Milepost 221 (6) Milepost 226 (6) Milepost 217 (5) Milepost 234 (4) Hare Mill Pond (3) Milepost 227 (3) Milepost 228 (3) Milepost 218 (2) Milepost 222 (2) Milepost 224 (2) Milepost 231 (2) Milepost 233 (1)Sections (2)
2A (70) 2B (16)Counties (1)
Alleghany (86)