Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
View of road
1930s - 2.
View of road
1930s - 3.
Guard wall
1930s - 4.
Rocky Ledge
1930s - 5.
Hillside
1930s - 6.
School Near Head of Glade Creek
1930s - 7.
Guard wall
1930s - 8.
Bank Sloping
1930s - 9.
View of road and gutter
1930s - 10.
NP 21 before planting
1930s - 11.
Guard wall
1930s - 12.
Ice Rock
1930s - 13.
View on parkway
1930s - 14.
Pine Creek Bridge #3
1930s - 15.
Trees loaded on trailer
1930s - 16.
Log Cabin
1930s - 17.
Before bank sloping
1930s - 18.
Opposite Woodruff's
1930s - 19.
Guard wall
1930s - 20.
Ringstone and Corner detail
1930s - 21.
Cliff along roadside
1930s - 22.
Parking overlook
1930s - 23.
#10 Bridge over Little Glade Creek
1930s - 24.
Stream
1930s - 25.
Fox Hunter's Paradise
1930s - 26.
Layout plan Picnic Shelter
1930s - 27.
Road construction
1930s - 28.
View of road
1930s - 29.
View from Station 295
1930s - 30.
View of road
1930s - 31.
View of road
1930s - 32.
Layout plan, Concession Gas Station Bluff Park
1930s - 33.
Building fire place, picnic area #1
1930s - 34.
Before seeding and planting
1930s - 35.
View of road
1930s - 36.
Before seeding and planting
1930s - 37.
George Holly in Timber
1930s - 38.
Station 566
1930s - 39.
Hare Mill Pond
1930s - 40.
Moving trees - CCC
1930s - 41.
Moving trees - CCC
1930s - 42.
Trees on trailer
1930s - 43.
Trees on trailer
1930s - 44.
Hare Mill Pond with hillside and buildings
1930s - 45.
End of Section A
1930s - 46.
Just West of the Bluff
1930s - 47.
Clump maple
1930s - 48.
Fireplace
1930s - 49.
Building the end wall
1930s - 50.
Farmland and road
1930s - 51.
Cumberland Knob Park Entrance
1930s - 52.
Stone Masons
1935 - 53.
Location Plan for Overpass at North Carolina St. H'way #26
1935 - 54.
Regional Sketch Map
1935 - 55.
Special Headwall, 10' x 7' R.C. Box
May 25, 1935 - 56.
Special headwall 10' x 7' R.C. box
May 25, 1935 - 57.
Bull Head Mountain and Deep Gap panorama
May 31, 1935 - 58.
Bull Head Mountain taken from Rte#26
May 31, 1935 - 59.
Devils Garden Showing Steep Rocky Slopes
May 31, 1935 - 60.
Panorama of Green Mountain
May 31, 1935 - 61.
Overpass near Mulberry Gap (from NC #18 on west)
June 20, 1935 - 62.
Overpass (NC #18) near Mulberry Gap Back
June 20, 1935 - 63.
Before grading. Deep gullies in erosive soil. Need flattening and rounding. Contour ditches required above.
July 25, 1935 - 64.
Before grading. Gullies and cave-ins. Slope too steep.
July 25, 1935 - 65.
Before grading. Showing objectionable effect of uniform slopes and insufficient rounding
July 25, 1935 - 66.
Before grading. 1:1 cut gullying badly; too steep to grass; flatten and round for grass
July 25, 1935 - 67.
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935 - 68.
Before grading. Soft gullying material above rock. Flatten expose hard rock. Wide rounding.
July 25, 1935 - 69.
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935 - 70.
Before grading. Detail showing depth of gullies in erosive soil. Rock decomposed into sand.
July 25, 1935 - 71.
First Gradeing Contract
September 1935 - 72.
First Grading Contract
September 1935 - 73.
First Grading Contract
September 1935 - 74.
First Gradeing Contract
September 1935 - 75.
Roaring Gap Detail of stone entrance gate post
September 17, 1935 - 76.
New New River Bridge, Detail of Chimney of Old House
September 17, 1935 - 77.
Stone quarry for Roaring Gap Hotel
September 18, 1935 - 78.
Roaring Gap Hotel Detail Stone Work on the North Wing
September 18, 1935 - 79.
Detail of wall just below quarry.
September 18, 1935 - 80.
Stone work of Graystone Inn
September 18, 1935 - 81.
Stone quarry for Roaring Gap Hotel
September 18, 1935 - 82.
Early Construction
November 1, 1935 - 83.
Roaring Gap Hotel. General view of Graystone Inn
November 12, 1935 - 84.
Face of Sample Wall, Showing Raked Joints and Over 'Dressed Stone,' Giving a Hard, Formal Appearance
November 12, 1935 - 85.
Back of sample wall, showing same stone laid in a more informal treatment, etc
November 13, 1935 - 86.
Stripped area and top soil storage pile
November 26, 1935 - 87.
Box culvert 8' x 6', 15° skew
November 26, 1935 - 88.
Box culvert, 8' x 6', 15° skew
November 26, 1935 - 89.
Rock filled tiled drain left of center line
November 26, 1935 - 90.
Top soil stripping operations
November 26, 1935 - 91.
General view construction through low area
November 26, 1935 - 92.
General view of construction rough grading
November 26, 1935 - 93.
Bluff Park Bridle Trail, looking toward Bluff
January 5, 1936 - 94.
Bluff Park Culvert Grassy Gap Road
January 5, 1936 - 95.
The Bluffs, Sec 2C Rhododendron Valley from Inn site (Doughton Park)
August 2, 1936 - 96.
Chimney, clay-mortar stone. Holloway place
February 13, 1936 - 97.
Chimney, clay mortar stone, Holloway place. Chimney details showing stone generally found along parkway, Sec 1P through 2F.
February 14, 1936 - 98.
Chimney, clay-mortar stone, Holloway place
February 14, 1936 - 99.
Chimney dry-laid stone. D.F. Wagoner Place
February 14, 1936 - 100.
Chimney, clay-mortar stone Holloway place
February 14, 1936 - 101.
Chimney, dry-laid stone. D.F. Wagoner place.
February 14, 1936 - 102.
Holloway Place
February 14, 1936 - 103.
Chimney, clay-mortar stone, Holloway place.
February 14, 1936 - 104.
Stone work detail Class B masonry retaining wall See neg# 5951
February 15, 1936 - 105.
Retaining wall, class B masonry
February 15, 1936 - 106.
Retaining wall, Class B, masonry. See neg# 5951
February 15, 1936 - 107.
Retaining wall class B masonry See #5951
February 15, 1936 - 108.
Inlet headwall-pipe culvert
February 19, 1936 - 109.
Dry Masonry Stone Foundation, slaty schist.
February 19, 1936 - 110.
Vertical View of Ice Rock
February 26, 1936 - 111.
Overpass at Meadow Fork
March 4, 1936 - 112.
Arch + cut stone - double box culvert
April 16, 1936 - 113.
Arch-cut Stone, Double Box Culvert
April 16, 1936 - 114.
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936 - 115.
Type #3 headwall, single
April 16, 1936 - 116.
Type #1 headwall, single
April 16, 1936 - 117.
General ground conditions, showing erosion
April 16, 1936 - 118.
General Ground Conditions Showing Stream Conditions
April 16, 1936 - 119.
Type #1 Headwall, Single
April 16, 1936 - 120.
General ground conditions showing stream conditions
April 16, 1936 - 121.
Early Construction
April 17, 1936 - 122.
The Bluff, View of Basin Cedar Ridge
April 20, 1936 - 123.
Picnic area before clearing
April 21, 1936 - 124.
Road construction
April 27, 1936 - 125.
Cumberland Knob Picnic Area
April 28, 1936 - 126.
Cumberland Knob Picnic Area
April 28, 1936 - 127.
Masonry in retaining wall Class B
April 29, 1936 - 128.
View of Wagon Drill
May 2, 1936 - 129.
Drilling Operations
May 2, 1936 - 130.
Bridge Tunnel
May 15, 1936 - 131.
Bridge Construction
May 23, 1936 - 132.
Masonry Wall
May 23, 1936 - 133.
Bridge Tunnel
May 23, 1936 - 134.
Parkway Road
May 23, 1936 - 135.
Parkway Road
May 23, 1936 - 136.
Parkway Road
May 23, 1936 - 137.
Heavy Machinery and Construction
May 23, 1936 - 138.
Bridge Tunnel
May 23, 1936 - 139.
Parkway Road
May 23, 1936 - 140.
Parkway Road
May 23, 1936 - 141.
Log Cribbing and Check Dams for Erosion Control
May 25, 1936 - 142.
Special headwall, Type #1 10' x 7' Box
May 25, 1936 - 143.
Cribbing check dams with brush back-fill
May 25, 1936 - 144.
Log cribbing and check dams for erosion control
May 26, 1936 - 145.
Log Cribbing and Check Dams for Erosion Control
May 26, 1936 - 146.
Log cribbing and check for erosion control
May 26, 1936 - 147.
Switchback on trail from Cumberland Knob, picnic area to gulley. Creek showing ramps.
May 30, 1936 - 148.
Open grassy area on Knob, looking west
May 30, 1936 - 149.
Clearing below Knob, Looking toward Spur
May 30, 1936 - 150.
Construction of Crib-Work for Trail
June 2, 1936 - 151.
Completed Trail, Indian Grave Trail
June 15, 1936 - 152.
Trail Route, Before Construction "Indian Grave Trail"
June 15, 1936 - 153.
Cribbing of trail, almost complete "Spur Trail"
June 15, 1936 - 154.
Completed Cribbing "Spur Trail"
June 15, 1936 - 155.
Completed Shuttle Trail, Looking Ahead
June 15, 1936 - 156.
Channel Change at Bridge Site #10 (Section 2A)
June 23, 1936 - 157.
Early Road Cut in Section 2A
June 23, 1936 - 158.
Pre-Asphalt Road in Section 2A
June 23, 1936 - 159.
Unique Culvert Near Station 262
June 23, 1936 - 160.
Bridge #6 During Construction (Section 2A)
June 23, 1936 - 161.
Detail View of Bridge #1 Construction
June 23, 1936 - 162.
Bridge Site #10 Prior to Construction
June 23, 1936 - 163.
Coarse Stone Road in Section 2A
June 23, 1936 - 164.
Detailed View of Bridge Abutment
June 23, 1936 - 165.
Culvert at Station 517
June 23, 1936 - 166.
Detail View of Bridge Site #6
June 23, 1936 - 167.
Early Construction in section 2C
June 26, 1936 - 168.
Early Construction
June 26, 1936 - 169.
Baffles
June 30, 1936 - 170.
Cement Masonry
June 30, 1936 - 171.
Right Hand Beam
July 13, 1936 - 172.
Section of Trail Under Construction - Gully Creek
July 14, 1936 - 173.
4th switch and rest bench site
July 14, 1936 - 174.
A Step Detail in Indian Grave Trail
July 14, 1936 - 175.
Bridge #1 left-handed beam
July 14, 1936 - 176.
View of Machined-Flattened Parkway
July 22, 1936 - 177.
First Parkway Crossing of NC 18, Near Sparta, NC
July 22, 1936 - 178.
Early Construction
July 22, 1936 - 179.
River/Trench
July 22, 1936 - 180.
Car on winding road
July 22, 1936 - 181.
Pre-Asphalt Parkway Near Virginia Border
July 22, 1936 - 182.
Vehicle Tracks
July 22, 1936 - 183.
Side view Bridge Construction in Section 2A
July 22, 1936 - 184.
Early Construction of Bridge in Section 2A
July 22, 1936 - 185.
Bridge Construction Site in Section 2A
July 22, 1936 - 186.
Partially Completed Overlook
July 22, 1936 - 187.
Bridge Construction in Section 2A
July 22, 1936 - 188.
"Bridge 3" Construction in Section 2A
July 22, 1936 - 189.
Part of #2 Abutment Face
July 23, 1936 - 190.
Bridge site #1 east side looking north
July 23, 1936 - 191.
Paths
July 23, 1936 - 192.
Cement Rock Wall
July 23, 1936 - 193.
Shovel loading
July 23, 1936 - 194.
Early Construction
July 23, 1936 - 195.
Road Between Hills
July 23, 1936 - 196.
Cumberland Knob
July 23, 1936 - 197.
Wall 611
July 23, 1936 - 198.
#9 Bridge
July 23, 1936 - 199.
Line Guides
July 23, 1936 - 200.
Bridge site east side looking south
July 23, 1936 - 201.
Unpaved Road #1
July 23, 1936 - 202.
Drilling
July 23, 1936 - 203.
Cumberland Knob #1
July 23, 1936 - 204.
Culvert Head Wall
July 23, 1936 - 205.
Valley
July 23, 1936 - 206.
Bridge 2
July 23, 1936 - 207.
Under Drain
July 23, 1936 - 208.
Path North over Proposed Bridge
July 23, 1936 - 209.
steep side hill
July 28, 1936 - 210.
Completed Rough Grade
July 28, 1936 - 211.
mixer
July 28, 1936 - 212.
Doughton Park #1
July 28, 1936 - 213.
Clearing operations
July 29, 1936 - 214.
Roadway
July 29, 1936 - 215.
Early Construction
July 29, 1936 - 216.
Fern Covered Rock along Trail
August 1936 - 217.
View of small waterfall. Camera at intersection of trail and stream
August 1936 - 218.
View from Highest Point in Cumberland Knob
August 1936 - 219.
Meadow Fork - View looking south from edge of parkway
August 1936 - 220.
View from Top Looking Direction of Fishers Peak
August 1936 - 221.
Cumberland Knob
August 1936 - 222.
Wright property. View showing small pine trees cut by the owner
August 1936 - 223.
Wright Property, View Showing Small Pine Trees Cut by the Owner
August 1936 - 224.
Cumberland Knob waterfall
August 1936 - 225.
View from Cumberland Knob
August 1936 - 226.
Bench along trail at a point 100 yards from picnic area.
August 1936 - 227.
View looking south along parkway
August 1936 - 228.
Small waterfall, Camera placed at intersection of trail and stream
August 1936 - 229.
Waterfall Cumberland Knob
August 1936 - 230.
View showing small pine trees cut by the owner, Wright property
August 1936 - 231.
Bridge site #6 Southwest wing wall
August 3, 1936 - 232.
The Bluffs Sec 2C Wildcat Rocks, Inn site (Doughton Park)
August 3, 1936 - 233.
Wildcat Rocks
August 3, 1936 - 234.
Bridge Site #6, Southwest Wing Wall, Pine Creek Bridge No. 6
August 4, 1936 - 235.
Southeast wing wall
August 4, 1936 - 236.
Northwest wing wall. Bush Creek Bridge.
August 4, 1936 - 237.
Southwest wing wall
August 4, 1936 - 238.
Bridge #6 Northwest wing wall
August 4, 1936 - 239.
Willow planted along channel change, 10 days after planting
August 13, 1936 - 240.
Buck Creek Gap
August 14, 1936 - 241.
Mountain slope and construction
August 20, 1936 - 242.
Hand-placed rock wall
August 20, 1936 - 243.
Early Construction
August 21, 1936 - 244.
Bridge and Abutment Construction
August 22, 1936 - 245.
Bridge and Abutment Construction
August 22, 1936 - 246.
Bridge and Abutment Construction
August 22, 1936 - 247.
Bridge and Abutment
August 22, 1936 - 248.
Bridge 4, excavation site
August 22, 1936 - 249.
Ahead at site of excavation for bridge #4.
August 22, 1936 - 250.
Bridge Construction
August 22, 1936 - 251.
Hare Mill Pond, scenic view
August 22, 1936 - 252.
Curved Head Wall
August 22, 1936 - 253.
Road View
August 22, 1936 - 254.
Road View
August 22, 1936 - 255.
View of Parkway
August 22, 1936 - 256.
Early Construction
August 22, 1936 - 257.
Bridge and Abutment Construction
August 22, 1936 - 258.
Bridge Construction
August 22, 1936 - 259.
Bridge and Abutment Construction
August 22, 1936 - 260.
Hare Mill Pond, scenic view
August 22, 1936 - 261.
Bridge and Abutment Construction
August 22, 1936 - 262.
Retaining Wall
August 22, 1936 - 263.
Rock wall on side of road
August 23, 1936 - 264.
Bridge 10, site of construction
August 23, 1936 - 265.
Excavation for tree well
August 23, 1936 - 266.
Stone masonry wall
August 23, 1936 - 267.
Bridge 10, site of construction
August 23, 1936 - 268.
View of Head Wall
August 24, 1936 - 269.
Rock slope in woods
August 24, 1936 - 270.
Road construction
August 24, 1936 - 271.
Road construction
August 24, 1936 - 272.
Early Construction
August 24, 1936 - 273.
Bridge 10, site of construction
August 25, 1936 - 274.
South abutment
August 26, 1936 - 275.
Stone detail
August 26, 1936 - 276.
After stream improvement
August 26, 1936 - 277.
Plant group left of parkway
August 27, 1936 - 278.
Plant group left of parkway
August 27, 1936 - 279.
Close-up of plant group left of parkway
August 27, 1936 - 280.
View of Trail Leading to Cumberland Knob from the Parking Area
August 31, 1936 - 281.
Bluffs Park, view from Wild Cat to Basin Creek
September 1936 - 282.
Cabin within 100' right-of-way, looking north
September 1936 - 283.
Side view from parkway near Ice Rocks
September 1936 - 284.
View of small water fall and stream which crosses the trail at the point where the camera is placed
September 1936 - 285.
View from edge of parkway, 1 looking north along alignment towad Cumberland Knob Park Area
September 1936 - 286.
View of Rock cut looking south
September 1936 - 287.
Latest wagon drill in action. View looking south from point toward Bluffs
September 1936 - 288.
View from parkway looking east down small revine south of Knob
September 1936 - 289.
Construction of New Blue Ridge Parkway Means Much To Our County
September 3, 1936 - 290.
Bridge Site #6, Southwest Wing Wall Under Construction
September 4, 1936 - 291.
Bridge site #6 Southeast wing wall under construction
September 4, 1936 - 292.
Looking east toward Pilot Mountain which is shown very faintly in middle center of picture
September 8, 1936 - 293.
View looking south along parkway
September 8, 1936 - 294.
View of Fishers Peak from Trail
September 8, 1936 - 295.
View from Highest Point Looking Northeast
September 8, 1936 - 296.
Intersection of North Carolina 18 and parkway View of parkway looking north
September 9, 1936 - 297.
View of parkway, looking north through wooded area. One of the few places where trees meet overhead.
September 9, 1936 - 298.
View looking south along Ice Rock section of parkway
September 11, 1936 - 299.
Falls in Basin Creek Bluff Park
September 11, 1936 - 300.
View of the Bluffs from Basin Creek Valley near Alligator Back.
September 11, 1936 - 301.
View of falls on Basin Creek
September 11, 1936 - 302.
View looking north along cut through Ice Rock section of Parkway near Bluffs Park area
September 11, 1936 - 303.
View of wide, open area on top of the Bluffs. Looking north
September 11, 1936 - 304.
Valley farm land. This is near but not within sight of the parkway
September 11, 1936 - 305.
The Bluffs from point 200 feet from the parkway south of the Bluffs
September 12, 1936 - 306.
Bridge #8 Pier
September 16, 1936 - 307.
Brush Creek Bridge #8, Pier from south
September 16, 1936 - 308.
Brush Creek Bridge #8 Pier
September 16, 1936 - 309.
Roaring Gap Hotel. South wing of hotel
September 18, 1936 - 310.
A view from the hillside opposite of the entrance to Cumberland Knob Park, looking across the Parkway to the park area
October 1936 - 311.
Access Road Construction
October 2, 1936 - 312.
Proposed Route 18 Crossing
October 4, 1936 - 313.
Construction of prop. wall
October 4, 1936 - 314.
Road Grade near NC Route 18
October 4, 1936 - 315.
Mountain Valley and Barn
October 4, 1936 - 316.
Back from Station 5
October 4, 1936 - 317.
Stone Cement Gutter
October 5, 1936 - 318.
Stone Cement Gutter
October 5, 1936 - 319.
Construction at Bridge #4
October 5, 1936 - 320.
Floor and Side Forms of Bridge #8
October 5, 1936 - 321.
#3 Bridge Construction
October 5, 1936 - 322.
Construction on Bridge #8
October 5, 1936 - 323.
Stone Cement Gutter Construction
October 5, 1936 - 324.
#4 Bridge Construction
October 5, 1936 - 325.
View of Bridge 4 Abutment
October 5, 1936 - 326.
Wood and Stone Bridge
October 5, 1936 - 327.
Top of #4 Bridge
October 5, 1936 - 328.
Top of #4 Bridge
October 5, 1936 - 329.
Left Wing of Bridge #4
October 5, 1936 - 330.
Cement Pouring at Bridge #10
October 5, 1936 - 331.
Looking north along parkway showing rock outcropping
October 11, 1936 - 332.
View looking south from wooded area into open meadow area.
October 12, 1936 - 333.
View looking south on parkway
October 12, 1936 - 334.
Parkway alignment, looking north
October 12, 1936 - 335.
View Looking South
October 12, 1936 - 336.
View across parkway looking east into escarpment one-half mile south of Cumberland Knob
October 12, 1936 - 337.
View looking north along parkway
October 12, 1936 - 338.
View looking south along Parkway (Proposed cabin-gas road entrance at far end of cut on left).
October 13, 1936 - 339.
Rubble gutter treatment at intersection of secondary road
October 13, 1936 - 340.
Simple arch culvert on west side of parkway
October 13, 1936 - 341.
View of culvert
October 13, 1936 - 342.
Gutter under construction
October 13, 1936 - 343.
Detail of rubble gutter and tile underdrain emerging
October 13, 1936 - 344.
Road alignment looking back
October 13, 1936 - 345.
Road alignment through wooded section
October 13, 1936 - 346.
View looking north on parkway
October 13, 1936 - 347.
Crushed stone base for rubble gutter
October 13, 1936 - 348.
Rubble gutter completed
October 13, 1936 - 349.
View looking south along parkway
October 13, 1936 - 350.
Detail of rubble gutter - completed
October 13, 1936 - 351.
General view of road and gutter
October 13, 1936 - 352.
Bridge #4 Stone detail on east side (Note scale stick)
October 13, 1936 - 353.
Gutter termination at pipe headwall
October 13, 1936 - 354.
Looking north along parkway one-half mile south of Cumberland Knob Park entrance
October 13, 1936 - 355.
View of alignment looking north near beginning of section
October 13, 1936 - 356.
View looking north toward Pine Spur
October 13, 1936 - 357.
View of alignment looking north near beginning of the section.
October 13, 1936 - 358.
View looking north along Parkway
October 14, 1936 - 359.
Looking North Along Parkway
October 14, 1936 - 360.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 361.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 362.
View of Alligator Back from point down the hill on the east side of the parkway
October 20, 1936 - 363.
300 feet from beginning of the section, view looking north along parkway
October 21, 1936 - 364.
Picnic Table
October 21, 1936 - 365.
Fireplace used in picnic area
October 21, 1936 - 366.
Bridge #4 Detail of stone work; view of left side
October 22, 1936 - 367.
View of left side, looking south, showing detail of stone work
October 22, 1936 - 368.
Near Saddle Mountain church. View of right side of two-arch culvert.
October 22, 1936 - 369.
View of table rock formation in valley to the east of parkway
October 22, 1936 - 370.
Bridge #1 View of left side (looking south). Looking down stream
October 22, 1936 - 371.
Cut Ditch and Bank
October 28, 1936 - 372.
Work Across Intersection from 39-20
October 28, 1936 - 373.
Work on Culvert
October 28, 1936 - 374.
Drop Inlet Station 29
October 28, 1936 - 375.
Partly Completed Parking
October 28, 1936 - 376.
Right Head Wall 289
October 28, 1936 - 377.
Dressed Slopes and Road Intersection
October 29, 1936 - 378.
Bridge #6 Construction
October 29, 1936 - 379.
Bridge #9 Abutment
October 29, 1936 - 380.
Icy Rock Cut (4)
October 31, 1936 - 381.
Icy Rock Cut (2)
October 31, 1936 - 382.
Icy Rock Curve (3)
October 31, 1936 - 383.
Rough Grade Work
October 31, 1936 - 384.
Across Icy Rock Curve
October 31, 1936 - 385.
Icy Rock Curve (2)
October 31, 1936 - 386.
Icy Rock Curve
October 31, 1936 - 387.
Left Head Wall 437
October 31, 1936 - 388.
Icy Rock Cut (3)
October 31, 1936 - 389.
Front Head Wall 437
October 31, 1936 - 390.
Icy Rock Cut
October 31, 1936 - 391.
Right Head Wall 437
October 31, 1936 - 392.
Hare Mill Pond and road after clean-up
November 10, 1936 - 393.
Hare Mill Pond and secondary road
November 10, 1936 - 394.
Parkway at Hare Mill Pond
November 10, 1936 - 395.
Parkway road and parking area
November 11, 1936 - 396.
View of wide, open area on top of the Bluffs, looking north from point near Wild Cat Rocks
November 11, 1936 - 397.
Unmaintained county road parallel to parkway
November 11, 1936 - 398.
View looking south across Ice Rock toward hand-laid rock embankmen
November 11, 1936 - 399.
View looking north across Ice Rock area
November 11, 1936 - 400.
View from the Bluff looking west along line of Parkway
November 11, 1936 - 401.
View on top of the Bluff looking east
November 11, 1936 - 402.
Hand-laid rock embankment
November 11, 1936 - 403.
Hand-placed rock embankment
November 11, 1936 - 404.
Hand-placed rock embankment
November 11, 1936 - 405.
Cut, before grading
November 14, 1936 - 406.
Drop Inlet and Cement Stone Masonry Apron
November 17, 1936 - 407.
Bridge #6 Bridge from east side.
November 19, 1936 - 408.
Brush Creek Bridge #8
November 19, 1936 - 409.
Hand laid rock embankment showing small stone
November 19, 1936 - 410.
Culvert at upper end of pond mill side.
November 19, 1936 - 411.
Close-up of hand-laid rock embankment
November 19, 1936 - 412.
View looking across parkway from east side of bridge
November 19, 1936 - 413.
Station 258 Sec 2B Hand-laid rock embankment
November 19, 1936 - 414.
Station 258. Sec 2B Hand-laid rock embankment and rock fill being placed.
November 19, 1936 - 415.
Station 258, Sec 2B Rock fill adjacent to hand-laid rock embankment
November 19, 1936 - 416.
Station 258, Sec 2B Rock spilled down mountain side
November 19, 1936 - 417.
General view showing machinery making fill through low wet area
November 25, 1936 - 418.
Bridge Construction
December 1, 1936 - 419.
Bridge Construction
December 1, 1936 - 420.
Arch of Bridge
December 1, 1936 - 421.
Pine Creek Bridge #4
December 1, 1936 - 422.
Roadway
December 1, 1936 - 423.
Bridge Construction
December 1, 1936 - 424.
Bridge Construction
December 1, 1936 - 425.
Bridge Construction
December 1, 1936 - 426.
Bridge Construction
December 1, 1936 - 427.
Rounded Roadway
December 1, 1936 - 428.
Bridge Frame
December 1, 1936 - 429.
Parking Overlook
December 1, 1936 - 430.
Bridge No. 4
December 2, 1936 - 431.
Retaining wall and bridge #2
December 2, 1936 - 432.
Close-up of Bridge #2
December 2, 1936 - 433.
Bridgeway #2 and Parkway
December 2, 1936 - 434.
Men at HPRE Wall
December 5, 1936 - 435.
Stone Wall
December 5, 1936 - 436.
Rock Cutting
December 5, 1936 - 437.
Road with Surface Stone
December 5, 1936 - 438.
Through Hills
December 5, 1936 - 439.
Prepared Road
December 5, 1936 - 440.
Rock Quarry
December 5, 1936 - 441.
Wood Pile
December 5, 1936 - 442.
HPRE Face
December 5, 1936 - 443.
Rock and Filling
December 7, 1936 - 444.
Station 386 Bridge #4
December 12, 1936 - 445.
Station 386 Bridge #4
December 12, 1936 - 446.
Land Acquisition Maps Section 2-B
1937 - 447.
Road and Parking Area
1937 - 448.
Building - razed
January 12, 1937 - 449.
Lakes-To-Florida Highway Is Being Improved In Co.
January 21, 1937 - 450.
Cumberland Knob Parking
February 2, 1937 - 451.
Car on Road
February 2, 1937 - 452.
Unsurfaced Road
February 2, 1937 - 453.
Route 18 Crossing
February 2, 1937 - 454.
Cumberland Knob Drive
February 2, 1937 - 455.
Finished Slopes
February 2, 1937 - 456.
Winding Road
February 2, 1937 - 457.
Drain Wall
February 2, 1937 - 458.
Completed Road
February 2, 1937 - 459.
Route 18 Intersection
February 2, 1937 - 460.
Curved Road
February 2, 1937 - 461.
Intersection Corner
February 2, 1937 - 462.
Men cleaning gutter
February 2, 1937 - 463.
Early construction
February 2, 1937 - 464.
Bridge Arch
February 3, 1937 - 465.
Bridge Construction
February 4, 1937 - 466.
Construction materials
February 4, 1937 - 467.
Bridge Abutment
February 4, 1937 - 468.
Rock embankment and stream
February 4, 1937 - 469.
Rock embankment and culvert
February 4, 1937 - 470.
Bridge #8
February 4, 1937 - 471.
Bridge Construction
February 4, 1937 - 472.
Bridge #9 construction
February 4, 1937 - 473.
Bridge at site #7 Steel construction
March 29, 1937 - 474.
Bridge at Site #7, Steel Construction
March 29, 1937 - 475.
East parapet wall south abutment
March 29, 1937 - 476.
Bridge at site #7 Steel construction, looking back from south abutment
March 29, 1937 - 477.
Bridge at site #7, Steel stringers
March 29, 1937 - 478.
North abutment and stringers
March 29, 1937 - 479.
Cutting for telephone line on right-of-way line
March 30, 1937 - 480.
Culvert headwall
April 1, 1937 - 481.
Underside of bridge
April 6, 1937 - 482.
Riveters working
April 6, 1937 - 483.
Landscape North to Bridge #6
April 10, 1937 - 484.
Detail of expansion dam
April 10, 1937 - 485.
View of bridge
April 10, 1937 - 486.
Detail of expansion dam
April 10, 1937 - 487.
Rail details
April 10, 1937 - 488.
Rail construction
April 10, 1937 - 489.
Bridge Construction
April 10, 1937 - 490.
Bridge #6
April 10, 1937 - 491.
View of road
April 10, 1937 - 492.
Detail Pier #2
April 10, 1937 - 493.
View of road
April 10, 1937 - 494.
View of bridge #4
April 10, 1937 - 495.
Unfinished road and bridge
April 10, 1937 - 496.
View of Junction of 2A and 2B
April 12, 1937 - 497.
Bridge #10 and Stream
April 12, 1937 - 498.
View near Junction of 2A/2B
April 12, 1937 - 499.
Landscape at Sections 2A and 2B
April 12, 1937 - 500.
Bridge #8
April 12, 1937 - 501.
View near Junction of 2A/2B
April 12, 1937 - 502.
Left End of Bridge #9
April 12, 1937 - 503.
Bridge Rock Detail
April 12, 1937 - 504.
Road fill along edge of rough road
April 13, 1937 - 505.
Rough Grade Rock Fill
April 14, 1937 - 506.
Loading Holes for Blasting
April 14, 1937 - 507.
Sharp Curve Construction
April 14, 1937 - 508.
South End of Quarry
April 14, 1937 - 509.
Preparing Sub-Grade
April 14, 1937 - 510.
Fire hazard reduction along trail. Belle Ridge
April 22, 1937 - 511.
Trail down Belle Ridge
April 22, 1937 - 512.
#9 Bridge, Down Stream, Cost $20,120
May 4, 1937 - 513.
Looking back over bridge #5
May 4, 1937 - 514.
No.4 Arch Bridge, cost $12,000
May 4, 1937 - 515.
Station 563 No 8 Bridge cost $34,053
May 4, 1937 - 516.
Guard rail, No.7 bridge
May 4, 1937 - 517.
No. 5 Bridge, Cost $17,520, Pine Creek Bridge #5
May 4, 1937 - 518.
No. 5 Bridge, cost $17,520
May 4, 1937 - 519.
No.6 bridge, cost $15,139
May 4, 1937 - 520.
Cumberland Knob Park Picnic Road
May 7, 1937 - 521.
Bridge #7 approximate cost $45,000
May 18, 1937 - 522.
Bridge no. 9, cost $20,120 24' span
May 18, 1937 - 523.
Bridge #5 42' span cost $17,520
May 18, 1937 - 524.
Underside of Viaduct
May 18, 1937 - 525.
Bridge No.2 49'10" span, cost $11,894
May 18, 1937 - 526.
Bridge #4
May 18, 1937 - 527.
Mailbox on parkway
May 18, 1937 - 528.
Bridge #7, approximate cost $45,000
May 18, 1937 - 529.
Bridge No. 3, 57' Span, Cost $19,462
May 18, 1937 - 530.
Bridge #7, guard rail and pier detail
May 18, 1937 - 531.
Hand Placed Rock
May 20, 1937 - 532.
Bridge #10
May 25, 1937 - 533.
Bridge #9
May 25, 1937 - 534.
Pine Creek Bridge #4
May 25, 1937 - 535.
Arch of Bridge #9
May 25, 1937 - 536.
Bridge #2
May 25, 1937 - 537.
Completed Bridge #8
May 25, 1937 - 538.
Pine Creek Bridge #5
May 25, 1937 - 539.
Pine Creek Bridge #6
May 25, 1937 - 540.
Pine Creek Bridge #3
May 25, 1937 - 541.
Pine Creek Bridge #7
May 25, 1937 - 542.
Cars crossing Pine Creek Bridge #7
May 25, 1937 - 543.
Road Construction
May 26, 1937 - 544.
Wagon Drills
May 26, 1937 - 545.
Icy Rock Curve
May 26, 1937 - 546.
Hand Placed Rock embankment
May 26, 1937 - 547.
Drilling and Construction
May 26, 1937 - 548.
Old state box culvert to be removed
June 1, 1937 - 549.
Mountainside of timber to be cut by A.V. Millsap
June 1, 1937 - 550.
Parkway box culvert
June 1, 1937 - 551.
Mountainside of timber to be cut by A. V. Millsap
June 1, 1937 - 552.
Rough headwall
June 8, 1937 - 553.
Mountain laurel in bloom by parkway
June 14, 1937 - 554.
Mountain Laurel
June 14, 1937 - 555.
Special drainage structure
June 22, 1937 - 556.
Special drainage structure
June 22, 1937 - 557.
Preparations for Cement Wall
July 28, 1937 - 558.
Dumping of Construction Material for replacing embankment
July 28, 1937 - 559.
Cement Stone Gutter
July 28, 1937 - 560.
Stone steps joining gutter
July 28, 1937 - 561.
Cement Stone Gutter Along Rock Bank
July 28, 1937 - 562.
Drilling and cleaning for stone wall at 255-35
July 28, 1937 - 563.
Head wall and Stone Cement Channel
July 28, 1937 - 564.
Ice Rock Wall
August 18, 1937 - 565.
Saddle Mountain Valley, Lake Site from station 277
August 20, 1937 - 566.
Unknown variety of plant 6 - 7' high, yellow flowers in bloom
August 20, 1937 - 567.
Saddle Mountain Valley. Lake site, looking up at valley, woods opposite
August 20, 1937 - 568.
Saddle Mountain Valley, Lake Site
August 20, 1937 - 569.
Cumberland Knob Shelter Bldg #89
September 1937 - 570.
View of road
September 3, 1937 - 571.
Retaining Wall along Icy Rock
September 4, 1937 - 572.
Icy Rock Curve
September 4, 1937 - 573.
Road Construction at Station 201-55
September 4, 1937 - 574.
Road Construction at Station 32
September 4, 1937 - 575.
Culvert Cement Stone Gutter at Station 122-30
September 4, 1937 - 576.
Icy Rock Retaining Wall with Crane
September 4, 1937 - 577.
Retaining Wall and unfinished slope of Icy Rock
September 4, 1937 - 578.
Gutter Work along Rock Face
September 4, 1937 - 579.
Construction of Gutter at Station 108-60
September 4, 1937 - 580.
Construction of Gutter at Inlet Towards Station 28
September 4, 1937 - 581.
Stone and iron culvert
September 4, 1937 - 582.
Stone masonry retaining wall
September 4, 1937 - 583.
Air Bellows Gap Underpass
September 21, 1937 - 584.
West wingwall Air Bellows Gap Underpass
September 23, 1937 - 585.
Fireplace in shelter on top of Cumberland Knob
October 1937 - 586.
Takeoff to campground area before construction
October 8, 1937 - 587.
Saddle in campground area looking west before construction
October 8, 1937 - 588.
Rough Grade Road
October 10, 1937 - 589.
Road through Cut
October 10, 1937 - 590.
Cement stone gutter
October 10, 1937 - 591.
Road and Bridge with Guard Stakes
October 10, 1937 - 592.
Winding Road
October 11, 1937 - 593.
Water Channel
October 11, 1937 - 594.
Rock Embankment
October 11, 1937 - 595.
Paving Gutters
October 11, 1937 - 596.
View of road
October 11, 1937 - 597.
Gutter Construction
October 11, 1937 - 598.
Stone Hillside Work
October 11, 1937 - 599.
Access Road to Route 18
October 11, 1937 - 600.
View of road
October 11, 1937 - 601.
Stone Gutter
October 11, 1937 - 602.
Stone culvert head wall
October 11, 1937 - 603.
Early Construction
October 11, 1937 - 604.
Surfaced Road
October 11, 1937 - 605.
Dirt Road
October 11, 1937 - 606.
Automobile on road
October 11, 1937 - 607.
Man and a Horse Team
October 12, 1937 - 608.
Team of Horses
October 12, 1937 - 609.
Dressed Road
October 12, 1937 - 610.
Unfinished Construction
October 12, 1937 - 611.
View of road
October 12, 1937 - 612.
Parkway just north of Air Bellows Gap
October 13, 1937 - 613.
Rock Cut - Devil's Garden
October 13, 1937 - 614.
Bull Head Mountain and Parkway
October 13, 1937 - 615.
Looking across Bluff Park toward Little Grandfather Mountain
October 13, 1937 - 616.
Looking through rock cut towards Ice Rock and Bluff
October 13, 1937 - 617.
Alligator Back and Meadow Fork Valley
October 15, 1937 - 618.
On top of Bluff. Parkway and Little Grandfather Mt.
October 15, 1937 - 619.
Alligator Back and Meadow Fork Valley
October 15, 1937 - 620.
Parkway alignment, Meadow Fork Valley
October 15, 1937 - 621.
Alligator Back
October 15, 1937 - 622.
Parkway and Meadow Fork Valley from Bluff
October 15, 1937 - 623.
Looking back at Alligator Back
October 15, 1937 - 624.
Back side of shelter
October 15, 1937 - 625.
Ice Formations
November 1937 - 626.
Ice Formations
November 1937 - 627.
Ice formations
November 1937 - 628.
Ice Formations
November 1937 - 629.
Ice formations
November 1937 - 630.
Ice Formations
November 1937 - 631.
Road to Lodge (under construction)
November 1937 - 632.
Road to Lodge (under construction)
November 1937 - 633.
Ice formations
November 1937 - 634.
Roadway near Ice Rock
November 20, 1937 - 635.
Ice Rock Channel and Drainage
November 20, 1937 - 636.
Parkway toward the Bluff
November 20, 1937 - 637.
Ice Rock
November 20, 1937 - 638.
Surfaced Road
November 20, 1937 - 639.
Ice Rock
November 20, 1937 - 640.
Fill
November 20, 1937 - 641.
Typical section in snow
November 20, 1937 - 642.
Icy Road
November 20, 1937 - 643.
Ice Rock
November 20, 1937 - 644.
Road Routes
November 22, 1937 - 645.
Land Acquisition Maps Section 2-C
1938 - 646.
L.F. Caudill
1938 - 647.
Shoulder construction, High Piney Ridge in background
1938 - 648.
Shoulder construction, High Piney Ridge in background
1938 - 649.
Rock cut at Devil's Garden
1938 - 650.
Land Acquisition Maps Section 2-A
1938 - 651.
NP 21 before planting
1938 - 652.
Cumberland Park Pump House
January 5, 1938 - 653.
Mahogany Rock Parking Overlook after grading
January 24, 1938 - 654.
Cumberland Knob Slope flattening at entrance
January 24, 1938 - 655.
Wildcat Rock and Lodge Parking area (proposed)
March 1938 - 656.
Sheep Hill Brand Lodge Site and proposed water storage
March 1938 - 657.
Spillage (smaller rock above) from excavation for north abutment of viaduct
March 8, 1938 - 658.
View of road
March 12, 1938 - 659.
The Bluff Crusher and Parkway
March 12, 1938 - 660.
Bridge - Grassy Gap Road
March 12, 1938 - 661.
Road construction to picnic area
March 12, 1938 - 662.
Picnic Table
March 12, 1938 - 663.
Road on Top of Hills
March 12, 1938 - 664.
Bridge - Grassy Gap Road
March 12, 1938 - 665.
Picnic Table
March 12, 1938 - 666.
Picnic Shelter Blueprints
April 11, 1938 - 667.
Taken to show log corner detail -- underexposed
April 21, 1938 - 668.
Devil's Garden Parking and Overlook after Grading
April 21, 1938 - 669.
Front of barn as it would be seen from the parkway.
April 21, 1938 - 670.
Barn proposed for acquisition. Note logs and shake roof.
April 21, 1938 - 671.
Shelter on Top of Cumberland Knob
April 27, 1938 - 672.
Looking West from One of the Parking Areas South of Cumberland Knob
April 27, 1938 - 673.
Forest Clearing
May 11, 1938 - 674.
CCC Camp just moving in
June 1938 - 675.
60ft cut at Devils Garden
June 14, 1938 - 676.
Big Cut at Devil's Garden
June 14, 1938 - 677.
Grade separation Class B masonry and concrete barrel
July 1, 1938 - 678.
Grade separation, south elevation
July 1938 - 679.
Signs near parking area
July 1, 1938 - 680.
Water Fountain
July 1938 - 681.
Dam site and watershed
July 11, 1938 - 682.
Face of Wall in Woods
July 11, 1938 - 683.
Return Cabin Loop to Camping Loop
July 11, 1938 - 684.
Inside of wall parking area
July 11, 1938 - 685.
Bluff Park from lodge site
July 12, 1938 - 686.
Retaining Wall Picnic Area
July 12, 1938 - 687.
West Abutment, Overpass US 21
July 12, 1938 - 688.
Slope on Parkway
July 16, 1938 - 689.
Before grading. A 3/4 to 1 slope with almost vertical overhang of soft rock
July 25, 1938 - 690.
Before grading. Tape used to show concave slope. Needs transition, overhand and wide rounding
July 25, 1938 - 691.
Unpaved roadway with erosion
July 25, 1938 - 692.
Before grading. Cave-in on 1:1 slope. Will continue to slide unless flattened. Needs rounding.
July 25, 1938 - 693.
Before grading. Cleared to connect slope line, with rock as excuse for steep slope. Ugly profile.
July 25, 1938 - 694.
Before grading. Rotten rock 1:1; ditch too narrow ugly profile.
July 25, 1938 - 695.
Before grading. Steep, rotten rock cuts, shoulder and ditch. 2 ft short
July 25, 1938 - 696.
Washout at headwall. Shows need of different type of structure.
August 1, 1938 - 697.
Water Storage Tank, Cabin Area
September 28, 1938 - 698.
Construction Unit Water Storage North End of Dam
September 28, 1938 - 699.
Clearing for Water Supply Reservoir
September 28, 1938 - 700.
Entrance road to lodge site
September 28, 1938 - 701.
Cut before grading
October 2, 1938 - 702.
Northwest elevation showing grading.
October 3, 1938 - 703.
Cut before grading
October 4, 1938 - 704.
Fill before grading
October 4, 1938 - 705.
Fill Before Grading
October 6, 1938 - 706.
Spandrel Wall - Rubble wing wall and concrete vault
October 18, 1938 - 707.
Before grading operation and clean-up, looking north
October 18, 1938 - 708.
Expansion joints at junction of spandrel and wing walls
October 18, 1938 - 709.
Cut before grading
October 21, 1938 - 710.
Cut before grading
October 21, 1938 - 711.
Cut before grading
October 21, 1938 - 712.
Cut before grading
October 21, 1938 - 713.
Cut, before grading
November 11, 1938 - 714.
Fill, before grading
November 7, 1938 - 715.
Fill, before grading
November 7, 1938 - 716.
Cut before grading, looking back
November 22, 1938 - 717.
Cut before grading, looking back
November 22, 1938 - 718.
Cut before grading, looking back
November 22, 1938 - 719.
Before grading
December 1938 - 720.
Before grading
December 1938 - 721.
Before grading
December 1938 - 722.
Before grading
December 1938 - 723.
Before Grading
December 1938 - 724.
Before grading. Looking back across Hare Mill Pond
December 15, 1938 - 725.
High cuts thru wooded area. During selective cutting.
December 15, 1938 - 726.
Fire Hazard Map
1939 - 727.
Radio tower installation
1939 - 728.
Shoulder construction, High Piney Ridge in background
1938 - 729.
Shoulder construction, High Piney Ridge in background
1938 - 730.
Radio tower installation
1939
Items in Query
County [Remove]
Starting Year [Remove]
Show All Results [Remove]
Ending Year [Remove]
Results: 730
Refine Your Search
Types (4)
Photographs (718) Maps (8) Drawings, Plans, and Projections (2) Newspaper Articles (2)Locations (52)
Section 2A (157) Section 2C (100) Cumberland Knob (53) Milepost 225 (31) Milepost 224 (28) Doughton Park (21) Milepost 242 (20) Milepost 217 (19) Milepost 237 (18) Milepost 218 (17) See All ResultsSections (3)
2A (429) 2C (235) 2B (59)Counties (1)
Alleghany (730)