Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Crabtree Falls
20th Century - 2.
Tunnel
1930s - 3.
Post construction forces scaling tunnel
1930s - 4.
Shufford Log Barn, Bldg. #596
1930s - 5.
Buck Creek Falls
August 17, 1935 - 6.
General view from southeast
August 17, 1935 - 7.
Looking over mountain toward Table Rock
August 21, 1935 - 8.
Black Mountain Range
August 21, 1935 - 9.
Road construction
July 8, 1936 - 10.
NC #104 Relocation, Sec 2M Parkway Access Drive
July 25, 1936 - 11.
Road View
August 14, 1936 - 12.
Super Reliance Grader "Caterpillar"
August 14, 1936 - 13.
Road Construction
August 14, 1936 - 14.
Machinery and Hillside
August 14, 1936 - 15.
Tunnel Construction
August 14, 1936 - 16.
Road Construction
August 14, 1936 - 17.
East along 104 NC Station 415
August 14, 1936 - 18.
Road View
August 14, 1936 - 19.
Road Construction
August 14, 1936 - 20.
Toe Ditch
August 14, 1936 - 21.
Road Construction
August 14, 1936 - 22.
Road View
August 14, 1936 - 23.
Road Construction
August 14, 1936 - 24.
Pipeline
August 17, 1936 - 25.
Proposed Road Construction Site
August 17, 1936 - 26.
View of Mountains
August 17, 1936 - 27.
Construction Equipment
August 17, 1936 - 28.
Linn Truck
August 17, 1936 - 29.
Koehring "Dumptor"
August 17, 1936 - 30.
Toe Ditch
August 17, 1936 - 31.
Toe Ditch
August 17, 1936 - 32.
View of Parkway
August 17, 1936 - 33.
Road construction
August 24, 1936 - 34.
Road construction
August 24, 1936 - 35.
Road construction
September 24, 1936 - 36.
Narrow Mountain Road
September 25, 1936 - 37.
Bulldozers and Construction
September 25, 1936 - 38.
Road Grade and Chestnut Tree
September 25, 1936 - 39.
Rock face and Side Slope
September 25, 1936 - 40.
Mountain Slope Road
September 25, 1936 - 41.
Part Road Grade
September 25, 1936 - 42.
Rock Wall
September 25, 1936 - 43.
Road grading
September 25, 1936 - 44.
Near Entrance Tunnel #1
September 25, 1936 - 45.
Cleared Roadway
September 25, 1936 - 46.
Proposed Tunnel 1 End
September 25, 1936 - 47.
Mountain Slope
November 6, 1936 - 48.
Steep Mountain Slope
November 6, 1936 - 49.
Excavation for Masonry Wall
November 6, 1936 - 50.
Sample Wall
November 6, 1936 - 51.
Mountain Slope
November 6, 1936 - 52.
Retaining Wall Construction
November 6, 1936 - 53.
Cemented Rock Wall
November 9, 1936 - 54.
Road on Cliffside
November 9, 1936 - 55.
Road Construction
November 9, 1936 - 56.
Blacksmith Shop
November 9, 1936 - 57.
Road Through Rock
November 9, 1936 - 58.
Through Rough Rock
December 14, 1936 - 59.
Tunnel Entrance
December 14, 1936 - 60.
North Tunnel Portal
December 14, 1936 - 61.
Proposed Line
December 14, 1936 - 62.
South Tunnel Entrance
December 14, 1936 - 63.
Cleared Path
December 15, 1936 - 64.
Trail
December 15, 1936 - 65.
Construction Slope
December 15, 1936 - 66.
Excavation Cut
December 15, 1936 - 67.
Wagon Drill
December 15, 1936 - 68.
Rough Road
December 15, 1936 - 69.
Shovel and Tractor
December 15, 1936 - 70.
Rock cut and tunnel
February 8, 1937 - 71.
View of road
February 8, 1937 - 72.
Road and rock pile
February 8, 1937 - 73.
Retaining Wall
February 8, 1937 - 74.
View of road
February 8, 1937 - 75.
Road and tunnel
February 8, 1937 - 76.
Cleared ridge
February 10, 1937 - 77.
Cement stone wall
February 10, 1937 - 78.
Ahead along line
February 10, 1937 - 79.
Retaining Wall
February 10, 1937 - 80.
Completed Cement Retaining Wall
April 22, 1937 - 81.
Construction on Cement Retaining Wall
April 22, 1937 - 82.
Masonry Wall Building
April 22, 1937 - 83.
Retaining Wall Looking North
April 22, 1937 - 84.
Looking North Through Tunnel #2
April 22, 1937 - 85.
North Through Tunnel #1
April 22, 1937 - 86.
Loading Rock at Retaining Wall
April 22, 1937 - 87.
View of Road Above Tunnel #2
April 22, 1937 - 88.
Construction of Tunnel #2
April 22, 1937 - 89.
Tunnel Construction
April 22, 1937 - 90.
Portal To Tunnel #1
April 22, 1937 - 91.
Drill Operation
April 22, 1937 - 92.
Looking Through Tunnel #1
April 22, 1937 - 93.
Rock shot
April 23, 1937 - 94.
Rough grade cut
April 23, 1937 - 95.
View of Rock Cut
April 23, 1937 - 96.
wagon drilling
April 23, 1937 - 97.
Linn Tractor dumping
April 23, 1937 - 98.
Center line on Tunnel #1
April 27, 1937 - 99.
Facing North from Masonry Wall
May 29, 1937 - 100.
Detail of surrounding rocks
May 29, 1937 - 101.
Top View of Masonry Wall
May 29, 1937 - 102.
North Entrance of Tunnel 1
August 4, 1937 - 103.
South End of Tunnel 2
August 4, 1937 - 104.
South End of Tunnel 1
August 4, 1937 - 105.
North Along Rough Grade at 581-50
August 5, 1937 - 106.
Right of "North Along Rough Grade at 581-50"
August 5, 1937 - 107.
Rock Slide at 576
August 5, 1937 - 108.
Quarry Operation for Masonry Material
August 5, 1937 - 109.
Partially Built Retaining Wall at 537
August 5, 1937 - 110.
Fill Slide
September 9, 1937 - 111.
Crushing Plant
September 9, 1937 - 112.
Deep Rock Cut
September 9, 1937 - 113.
South Entrance Tunnel #1
September 9, 1937 - 114.
Rough grade road
September 9, 1937 - 115.
Hoist On A Fordson Tractor
September 9, 1937 - 116.
Tunnel #2
October 15, 1937 - 117.
Inside of a Tunnel
October 15, 1937 - 118.
Retaining Wall
October 15, 1937 - 119.
Partially Worked Gradient
October 15, 1937 - 120.
Tunnel entrance and culvert headwall
October 15, 1937 - 121.
Men Grading Slope
October 15, 1937 - 122.
Construction - Crusher
October 21, 1937 - 123.
Inside Tunnel #2
November 24, 1937 - 124.
Mountainside
November 24, 1937 - 125.
View of Route 104
November 24, 1937 - 126.
Private Residues in Forest Areas
1938 - 127.
Finish Grading
June 1938 - 128.
View of road grade
January 24, 1939 - 129.
Foundation for wall
February 27, 1939 - 130.
Cut at Station 277
February 27, 1939 - 131.
Cleared path
March 31, 1939 - 132.
Wall Site
March 31, 1939 - 133.
Cleared path
March 31, 1939 - 134.
New Cut slope
April 29, 1939 - 135.
Wall Excavation
May 3, 1939 - 136.
Road Construction
May 11, 1939 - 137.
Rock Drilling
May 24, 1939 - 138.
Workers and wall construction
May 24, 1939 - 139.
Rock Cut at Station 123-50
May 24, 1939 - 140.
View of road
August 3, 1939 - 141.
View of road
August 8, 1939 - 142.
Rock cut
August 8, 1939 - 143.
View of road
August 8, 1939 - 144.
Workers at landslide
November 7, 1939 - 145.
Grade Separation - N.C. Rte. 104 Part 1 of 3
June 1940 - 146.
Grade Separation - N.C. Rte. 104: Section and Details Part 3
June 1940 - 147.
Grade Separation - N.C. Rte. 104 Part 2
June 1940 - 148.
Gutter
June 12, 1940 - 149.
Washed Out Fill
August 16, 1940 - 150.
Overpass ringstones
November 18, 1940 - 151.
Overpass ringstones
November 18, 1940 - 152.
Overpass at Buck Creek Gap
January 21, 1941 - 153.
Overpass at Buck Creek Gap
February 18, 1941 - 154.
Rock Wall
February 18, 1941 - 155.
Rock Wall
February 18, 1941 - 156.
Rock Wall
February 18, 1941 - 157.
Trench
March 28, 1941 - 158.
Buck Creek Gap Overpass
January 1942 - 159.
Buck Creek Gap Overpass
January 1942 - 160.
Overpass Structure, Section 2M
January 1942 - 161.
Buck Creek Gap Overpass
January 1942 - 162.
Buck Creek Gap Overpass
January 1942 - 163.
Buck Creek Gap Overpass
January 1942 - 164.
Rock Embankment
April 10, 1942 - 165.
Rock Embankment
April 10, 1942 - 166.
Fill Slope where Slide Continues, Post Construction
May 6, 1942 - 167.
Spreading Calcium Chloride
July 7, 1942 - 168.
Removing Rock Slide
July 7, 1942 - 169.
Guard post placed by post construction
September 9, 1942 - 170.
Mt. Mitchell thru Buck Creek Cap Overpass
September 10, 1942 - 171.
Buck Creek Gap Overpass
September 10, 1942 - 172.
Buck Creek Gap Overpass
September 10, 1942 - 173.
Parkway crossing county road
October 22, 1942 - 174.
Tunnel Portal
January 6, 1943 - 175.
Rock slide before removal
February 28, 1945 - 176.
Proposed Line Change on Parkway
March 29, 1945 - 177.
Proposed Line Change on Parkway
March 29, 1945 - 178.
Shovel Working Construction
April 12, 1945 - 179.
Vista and Management Areas
1946 - 180.
Buck Creek Gap Overpass
June 1946 - 181.
Mount Mitchell from the Blue Ridge Parkway
June 1946 - 182.
Buck Creek Gap Overpass
June 1946 - 183.
Water bound base course
August 12, 1946 - 184.
Rolling and brooming water bound base stone and dust
August 27, 1946 - 185.
NC Route 80
October 24, 1946 - 186.
Parkway near Buck Creek Gap
October 24, 1946 - 187.
Rock Embankment
June 1947 - 188.
Parkway Service Sign
June 12, 1947 - 189.
Inside Tunnel
June 17, 1947 - 190.
NC-80 overpass at Buck Creek Gap
1950s - 191.
Rock Wall, Project 2M2
February 27, 1951 - 192.
Slide near Crabtree Meadows
November 1951 - 193.
Slide near Crabtree Meadows
November 1951 - 194.
Parkway Land Use Map Section 2-M
1953 - 195.
Wildacres Tunnel
April 11, 1957 - 196.
Singecat Ridge
May 5, 1957 - 197.
South Twin Tunnel
June 4, 1957 - 198.
Mount Mitchell
September 1958 - 199.
Singecat Ridge
October 1959 - 200.
Parkway and N.C. 80 at Buck Creek Gap
August 1971 - 201.
Overpass Over NC 80
August 1971 - 202.
Construction Work
September 18, 1973 - 203.
Construction Work
September 18, 1973 - 204.
Construction Work
September 18, 1973 - 205.
Construction Work
September 18, 1973 - 206.
Construction Signs
September 18, 1973 - 207.
Construction Signs
September 18, 1973 - 208.
Construction Work
September 18, 1973 - 209.
Construction Signs
September 18, 1973 - 210.
Construction Signs
September 18, 1973 - 211.
Bridge over N.C. State Route 80
October 21, 1973 - 212.
New Retaining Wall
November 28, 1973 - 213.
New Retaining Wall
November 28, 1973 - 214.
Rock Cut
March 1974 - 215.
New Wall by Laurel Mtn.
April 1974 - 216.
New Wall by Laurel Mtn.
April 1974 - 217.
New Wall by Laurel Mtn.
April 1974 - 218.
Rockslide
October 25, 1977 - 219.
Taping Road Barriers
October 25, 1977 - 220.
Road Sign Along Parkway
July 1978 - 221.
Tunnel
- 222.
Land Acquisition Maps Section 2-M
Refine Your Search
Types (3)
Photographs (215) Maps (4) Drawings, Plans, and Projections (3)Locations (6)
Section 2M (173) Buck Creek Gap (23) Milepost 345 (9) Milepost 344 (7) Milepost 346 (6) Milepost 339 (4)Sections (1)
2M (222)Counties (1)
Yancey (222)



