Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Stonework on south wingwall of viaduct during construction
February 15, 1938 - 2.
Stonework on south wingwall of viaduct during construction
February 15, 1938 - 3.
Base of wing wall during construction
March 8, 1938 - 4.
Rock Overcast on Lower Side thru Cut, Before Cleanup
April 25, 1938 - 5.
Rock overcast at lower side through rock cut
April 25, 1938 - 6.
Looking Down the Back Side of thru Rock Cut
April 25, 1938 - 7.
After Cleanup of Excessive Overcast Material
November 29, 1938 - 8.
After clean-up of excessive overcast material
November 29, 1938
Refine Your Search
Types (1)
Photographs (8)Locations (3)
Big Laurel Mountain Viaduct (3) Milepost 353 (3) Milepost 352 (2)Sections (2)
2N (5) 2M (3)Counties (1)
McDowell (8)



