Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Excavation for principal footing retaining wall
1938 - 2.
Wall at Bear Den Parking Overlook
1938 - 3.
Construction Bear Den Parking Overlook
1938 - 4.
South wingwall of viaduct during construction
February 15, 1938 - 5.
Stonework on south wingwall of viaduct during construction
February 15, 1938 - 6.
Stonework on south wingwall of viaduct during construction
February 15, 1938 - 7.
Base of wing wall during construction
March 8, 1938 - 8.
North portal of #1 tunnel
April 19, 1938 - 9.
Looking Down the Back Side of thru Rock Cut
April 25, 1938 - 10.
Rock overcast at lower side through rock cut
April 25, 1938 - 11.
Rock Overcast on Lower Side thru Cut, Before Cleanup
April 25, 1938 - 12.
Wall construction Bear Den Parking Overlook
May 7, 1938 - 13.
Example of careless blasting from cut
May 7, 1938 - 14.
View from Bear Den parking overlook
May 7, 1938 - 15.
Looking back from tunnel
June 1938 - 16.
Tunnel #2 looking back
June 1938 - 17.
Excavation for Special Footings - CSM Wall
June 1938 - 18.
Excavating through rock for culvert
July 28, 1938 - 19.
Bear Den Cliff at proposed revision
August 16, 1938 - 20.
After clean-up of excessive overcast material
November 29, 1938 - 21.
After Cleanup of Excessive Overcast Material
November 29, 1938
Refine Your Search
Types (1)
Photographs (21)Locations (10)
Bear Den Campground (4) Big Laurel Mountain Viaduct (4) Milepost 353 (3) Milepost 323 (2) Milepost 325 (2) Milepost 352 (2) Milepost 349 (1) Section 2K (1) Twin Tunnel #1 (1) Twin Tunnel #2 (1)Sections (3)
2K (9) 2M (6) 2N (6)Counties (1)
McDowell (21)



