Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Toe Wall
1930s - 2.
Overpass structure 2b-3 North Elevation Bridge over US 221 Roaring Gap
September 8, 1938 - 3.
Heavy Fill
1940 - 4.
Retaining Wall
1940 - 5.
Culvert Headwall
1940 - 6.
Heavy Fill
1940 - 7.
Heavy Slide
1940 - 8.
Grading
1940 - 9.
View from Blowing Rock Town Dump
July 27, 1940 - 10.
Showing Location of Blowing Rock town dump
July 27, 1940 - See All Results
Refine Your Search
Types (1)
Photographs (44)Locations (15)
Section 2F (10) Milepost 290 (6) Intersection of Blue Ridge Parkway at U.S. Route 221 (near Blowing Rock, N.C.) (5) Milepost 276 (4) Milepost 292 (4) Blowing Rock (3) Milepost 283 (2) Milepost 285 (2) Milepost 288 (2) Aho Station (1) See All ResultsSections (4)
2F (34) 2E (5) 2H (4) 2G (1)Counties (1)
Watauga (44)



