Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Gully control (after)
July 26, 1941 - 2.
Gully control (after)
July 26, 1941 - 3.
Gully control (after)
July 26, 1941 - 4.
Gully control (afer)
July 26, 1941 - 5.
Gully and sheet erosion (work started)
November 1941 - 6.
Gully and sheet erosion (mulching with pine)
November 1941 - 7.
Gully control (after) Beng, N.C.
November 1941 - 8.
Shows active gully and sheet erosion (before)
November 1941 - 9.
Gully and Sheet Erosion
July 1, 1942 - 10.
Gully and sheet erosion, large pasture with active sheet erosion.
September 1942 - See All Results
Refine Your Search
Types (1)
Photographs (12)Locations (4)
Milepost 268 (8) Section 2E (2) Daniels Gap (1) Milepost 261 (1)Sections (2)
2E (11) 2D (1)Counties (1)
Ashe (12)



