Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Frame dwelling front elevation
March 20, 1940 - 2.
Frame dwelling rear elevation
March 20, 1940 - 3.
Log dwelling end elevation
March 20, 1940 - 4.
Log dwelling front elevation
March 20, 1940 - 5.
Secondary road instruction Before selective cutting and grading
April 17, 1940 - 6.
Wheel shaft bearing blocks
June 1940 - 7.
Wheel shaft bearing blocks
June 1940 - 8.
Mabry Mill South Elevation
June 7, 1940 - 9.
Mabry Mill East elevation
June 7, 1940 - 10.
Mabry Mill East elevation of wheel
June 7, 1940 - See All Results
Refine Your Search
Types (1)
Photographs (12)Locations (4)
Mabry Mill (Va.) (6) Milepost 164 (3) Milepost 162 (2) Milepost 143 (1)Sections (3)
1T (6) 1R (5) 1P (1)Counties (1)
Floyd (12)



