Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
View from top of cut looking across corner of parking area toward the east.
July 1936 - 2.
Early Construction
July 13, 1936 - 3.
View from top of cut opposite parking area looking north along line of parkway
August 1936 - 4.
Side view from Parkway showing prevalent type of fence and condition of all standing chestnut trees
August 1936 - 5.
Sweet Annie Hollow underpass under construction
August 4, 1936 - 6.
Sweet Annie Hollow underpass after rough grading
August 25, 1936 - 7.
Overpass structure, Sweet Annie Hollow
December 1, 1936 - 8.
Wood cutting A.C. Nolen
March 10, 1937 - 9.
Wood cutting on Cannaday property
March 10, 1937 - 10.
Wood cutting A.C. Nolen
March 10, 1937 - 11.
Culvert headwall on culvert for access road
May 19, 1937 - 12.
Parkway looking towards the Haycocks
June 9, 1937 - 13.
Rocky Knob; laurel in bloom in foreground
June 9, 1937 - 14.
Rock cut back of parking overlook
October 11, 1937 - 15.
Mabry Mill
October 11, 1937 - 16.
Parkway and Mabry Mill
October 11, 1937 - 17.
Parkway alignment
October 11, 1937 - 18.
Water wheel on Mabry Mill
October 11, 1937 - 19.
Slope before grading. Showing steep over-burden and talus concealing rock. Ledges before grading.
October 1938 - 20.
Slope during L.D. grading
December 12, 1938 - 21.
Slope before L.D. grading
December 12, 1938 - 22.
Before selective cutting
1939 - 23.
Log Barn Mabry Mill Group RAZED
March 5, 1939 - 24.
Log Barn Mabry Group RAZED
March 6, 1939 - 25.
Log Barn Mabry Group RAZED
March 6, 1939 - 26.
Log Barn Mabry Mill RAZED
March 6, 1939 - 27.
Log Barn Mabry Group RAZED Detail shot log construction
March 6, 1939 - 28.
Log Barn Mabry Group RAZED
March 6, 1939 - 29.
Barn of recent construction
March 28, 1939 - 30.
Old barn from Parkway
March 28, 1939 - 31.
Old barn from Parkway
March 28, 1939 - 32.
Old barn from Parkway
March 28, 1939 - 33.
Barn new construction
March 28, 1939 - 34.
Barn
October 1939 - 35.
Log dwelling front elevation
March 20, 1940 - 36.
Frame dwelling rear elevation
March 20, 1940 - 37.
Log dwelling end elevation
March 20, 1940 - 38.
Frame dwelling front elevation
March 20, 1940 - 39.
Secondary road instruction Before selective cutting and grading
April 17, 1940 - 40.
Wheel shaft bearing blocks
June 1940 - 41.
Wheel shaft bearing blocks
June 1940 - 42.
Mabry Mill West Elevation
June 7, 1940 - 43.
Mabry Mill East elevation
June 7, 1940 - 44.
Mabry Mill East elevation of wheel
June 7, 1940 - 45.
Mabry Mill South Elevation
June 7, 1940 - 46.
Pine Spur Park
September 28, 1940 - 47.
Mabry Mill before restoration
1941 - 48.
Mabry Mill before restoration
1941 - 49.
Mabry Mill before restoration
1941 - 50.
Mabry Mill before restoration
1941 - 51.
Dodds Creek before sloping
February 1941 - 52.
Dodds Creek before sloping
February 1941 - 53.
Mabry Mill site
September 1941 - 54.
Covered bridge near Floyd, VA Underfloor
1942 - 55.
Covered bride near Floyd, VA Latice [Lattice], 3 1/4 x 12" pine; Ledges 3 1/4 x 14" pine; dowels 2" dia oak
1942 - 56.
Covered bridge near Floyd, VA Abutment failure
1942 - 57.
near Rakes Mill Pond
May 30, 1942 - 58.
Devil's Backbone parking overlook
May 30, 1942 - 59.
Rail fences
May 30, 1942 - 60.
Rail fences
May 30, 1942 - 61.
Mabry Mill Mill Pond Site Old wheel removed
June 1942 - 62.
Water-wheel shaft
June 1942 - 63.
Water-wheel construction
June 1942 - 64.
Water-wheel shaft in place
June 1942 - 65.
Clearing-Mill Pond Site
June 1942 - 66.
Clearing-Mill Pond Site
June 1942 - 67.
Water-wheel shaft
June 1942 - 68.
Water-wheel shaft
June 1942 - 69.
Water-wheel shaft
June 1942 - 70.
Blacksmith Shop
June 1942 - 71.
Blacksmith Shop
June 1942 - 72.
Blacksmith Shop
June 1942 - 73.
Blacksmith Shop
June 1942 - 74.
Flume construction-main branch
June 1942 - 75.
Flume construction-main branch
June 1942 - 76.
Flume construction-main branch
June 1942 - 77.
Flume construction-main branch
June 1942 - 78.
Blacksmith Shop (Making shakes)
June 1942 - 79.
Flume construction-main branch
June 1942 - 80.
Clearing-Mill Pond Site
June 1942 - 81.
Water-wheel construction
June 1942 - 82.
Water-wheel shaft
June 1942 - 83.
30" timber for water-wheel shaft
June 1942 - 84.
Mabry Mill - Residence to be removed
June 1942 - 85.
Water-wheel construction
July 1942 - 86.
Water-wheel construction
July 1942 - 87.
Water-wheel construction
July 1942 - 88.
Water-wheel construction
July 1942 - 89.
Water-wheel construction
July 1942 - 90.
Flume construction
July 1942 - 91.
Flume construction-main branch
July 1942 - 92.
Water-wheel construction
July 1942 - 93.
Water-wheel construction
July 1942 - 94.
Blacksmith Shop
July 1942 - 95.
Water-wheel construction
July 1942 - 96.
Water-wheel construction
July 1942 - 97.
Water-wheel construction
July 1942 - 98.
Water-wheel construction
July 1942 - 99.
Flume construction
August 1942 - 100.
Mabry Mill Pictures of tourists taking pictures
August 1942 - 101.
Sorghum Mill
August 1942 - 102.
Lumber Stacks
August 1942 - 103.
Farming
October 1942 - 104.
Soil Erosion Before Erosion Control Work
November 1942 - 105.
Roof "boards" ricked for drying
November 1942 - 106.
Riving "boards" from "bolt"
November 1942 - 107.
Stile over flume
November 1942 - 108.
Soil Erosion Before Erosion Control Work
November 1942 - 109.
Tire heating, fitting and quenching trough
November 1942 - 110.
Wheelwright shop setup
November 1942 - 111.
Tire bending rack
November 1942 - 112.
Footbridge and path loop to waterwheel
November 1942
Items in Query
County [Remove]
Starting Year [Remove]
Show All Results [Remove]
Ending Year [Remove]
Results: 112
Refine Your Search
Types (1)
Photographs (112)Locations (12)
Mabry Mill (Va.) (69) Milepost 159 (7) Milepost 162 (7) Milepost 164 (7) Milepost 158 (6) Milepost 163 (6) Milepost 138 (3) Milepost 143 (2) Shortts Knob Overlook (2) Milepost 157 (1) See All ResultsSections (3)
1T (70) 1R (37) 1P (5)Counties (1)
Floyd (112)