Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Log dwelling front elevation
March 20, 1940 - 2.
Frame dwelling front elevation
March 20, 1940 - 3.
Frame dwelling rear elevation
March 20, 1940 - 4.
Log dwelling end elevation
March 20, 1940 - 5.
Secondary road instruction Before selective cutting and grading
April 17, 1940 - 6.
Wheel shaft bearing blocks
June 1940 - 7.
Wheel shaft bearing blocks
June 1940 - 8.
Mabry Mill East elevation
June 7, 1940 - 9.
Mabry Mill East elevation of wheel
June 7, 1940 - 10.
Mabry Mill West Elevation
June 7, 1940 - 11.
Mabry Mill South Elevation
June 7, 1940 - 12.
Pine Spur Park
September 28, 1940 - 13.
Mabry Mill before restoration
1941 - 14.
Mabry Mill before restoration
1941 - 15.
Mabry Mill before restoration
1941 - 16.
Mabry Mill before restoration
1941 - 17.
Dodds Creek before sloping
February 1941 - 18.
Dodds Creek before sloping
February 1941 - 19.
Mabry Mill site
September 1941 - 20.
Covered bride near Floyd, VA Latice [Lattice], 3 1/4 x 12" pine; Ledges 3 1/4 x 14" pine; dowels 2" dia oak
1942 - 21.
Covered bridge near Floyd, VA Abutment failure
1942 - 22.
Covered bridge near Floyd, VA Underfloor
1942 - 23.
Rail fences
May 30, 1942 - 24.
near Rakes Mill Pond
May 30, 1942 - 25.
Devil's Backbone parking overlook
May 30, 1942 - 26.
Rail fences
May 30, 1942 - 27.
Flume construction-main branch
June 1942 - 28.
Water-wheel shaft
June 1942 - 29.
Water-wheel construction
June 1942 - 30.
Water-wheel shaft in place
June 1942 - 31.
Clearing-Mill Pond Site
June 1942 - 32.
Clearing-Mill Pond Site
June 1942 - 33.
Water-wheel shaft
June 1942 - 34.
Water-wheel shaft
June 1942 - 35.
Water-wheel shaft
June 1942 - 36.
Blacksmith Shop
June 1942 - 37.
Blacksmith Shop
June 1942 - 38.
Blacksmith Shop
June 1942 - 39.
Blacksmith Shop
June 1942 - 40.
Flume construction-main branch
June 1942 - 41.
Flume construction-main branch
June 1942 - 42.
Flume construction-main branch
June 1942 - 43.
Blacksmith Shop (Making shakes)
June 1942 - 44.
Flume construction-main branch
June 1942 - 45.
Clearing-Mill Pond Site
June 1942 - 46.
Water-wheel construction
June 1942 - 47.
Water-wheel shaft
June 1942 - 48.
Mabry Mill Mill Pond Site Old wheel removed
June 1942 - 49.
30" timber for water-wheel shaft
June 1942 - 50.
Mabry Mill - Residence to be removed
June 1942 - 51.
Water-wheel construction
July 1942 - 52.
Water-wheel construction
July 1942 - 53.
Water-wheel construction
July 1942 - 54.
Water-wheel construction
July 1942 - 55.
Blacksmith Shop
July 1942 - 56.
Water-wheel construction
July 1942 - 57.
Water-wheel construction
July 1942 - 58.
Flume construction-main branch
July 1942 - 59.
Flume construction
July 1942 - 60.
Water-wheel construction
July 1942 - 61.
Water-wheel construction
July 1942 - 62.
Water-wheel construction
July 1942 - 63.
Water-wheel construction
July 1942 - 64.
Water-wheel construction
July 1942 - 65.
Sorghum Mill
August 1942 - 66.
Mabry Mill Pictures of tourists taking pictures
August 1942 - 67.
Flume construction
August 1942 - 68.
Lumber Stacks
August 1942 - 69.
Farming
October 1942 - 70.
Soil Erosion Before Erosion Control Work
November 1942 - 71.
Soil Erosion Before Erosion Control Work
November 1942 - 72.
Roof "boards" ricked for drying
November 1942 - 73.
Riving "boards" from "bolt"
November 1942 - 74.
Stile over flume
November 1942 - 75.
Footbridge and path loop to waterwheel
November 1942 - 76.
Tire heating, fitting and quenching trough
November 1942 - 77.
Tire bending rack
November 1942 - 78.
Wheelwright shop setup
November 1942 - 79.
Contour disking of run down pasture
May 13, 1943 - 80.
Hay baling
May 13, 1943 - 81.
Broken sod in a run down pasture
May 13, 1943 - 82.
Utilization of brush (provided from selective cutting) to control erosion
May 13, 1943 - 83.
After view of field cleared of brush
October 1944 - 84.
After view of field cleared of brush
October 1944 - 85.
Interp. Sign. Chicken Coop (currently located at Puckett Cabin) Frame Granary in background (razed).
1947 - 86.
Rakes Mill Pond sign
March 1947 - 87.
The "Mabry Mill" sign
March 1947 - 88.
Interpretive sign and environs
April 1947 - 89.
Milepost marker
December 30, 1947 - 90.
Milepost marker
December 30, 1947 - 91.
Milepost 142 with car
December 30, 1947
Items in Query
County [Remove]
Starting Year [Remove]
Show All Results [Remove]
Ending Year [Remove]
Results: 91
Refine Your Search
Types (1)
Photographs (91)Locations (11)
Mabry Mill (Va.) (62) Milepost 162 (5) Milepost 163 (5) Milepost 158 (4) Milepost 159 (3) Milepost 164 (3) Milepost 142 (2) Milepost 143 (2) Milepost 157 (2) Rakes Mill Pond (2) See All ResultsSections (3)
1T (62) 1R (25) 1P (4)Counties (1)
Floyd (91)



