Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Log Barn Mabry Mill Group RAZED
March 5, 1939
-
Log Barn Mabry Group RAZED Detail shot log construction
March 6, 1939
-
Log Barn Mabry Mill RAZED
March 6, 1939
-
Log Barn Mabry Group RAZED
March 6, 1939
-
Log Barn Mabry Group RAZED
March 6, 1939
-
Log Barn Mabry Group RAZED
March 6, 1939
-
Maximum Limit Buses on Parkway - Temporary Checking Station
July 25, 1939
-
Rock slide and scaling operations
July 25, 1939
-
Puckett Cabin House recommended retained as is.
July 25, 1939
-
Rock slide, partially cleared
July 25, 1939
Items in Query
Results: 39
Refine Your Search
Types (1)
Photographs (39)Locations (10)
Milepost 251 (13) Mabry Mill (Va.) (6) Section 2J (6) Waynesville (6) Milepost 305 (2) Section 2P (2) Little Switzerland (1) Milepost 368 (1) Puckett Cabin Parking Area (1) Section 2H (1)Sections (8)
2D (13) 1T (6) 2J (6) 2W (6) 2H (3) 2P (3) 1U (1) 2L (1)Counties (7)
Ashe (13) Avery (9) Floyd (6) Haywood (6) Buncombe (3) Carroll (1) Mitchell (1)