Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Rock Overcast - Cleared and Obliterated
1938 - 2.
Shovel working on top of 100' cut
August 16, 1938 - 3.
Shovel working on top of 100' cut
August 16, 1938 - 4.
Example of good alignment without layout but with good inspection parapet wall
August 31, 1939 - 5.
Example of good alignment without layout but with good inspection
August 31, 1939 - 6.
Gutter, Shoulder, and Part of Road Washed Out
August 16, 1940 - 7.
Logs and Debris Washed from Mountain
August 16, 1940 - 8.
Looking up Parkway, water action left to right (R to L Parkway designation)
August 16, 1940 - 9.
Parkway Flood Damage
August 16, 1940 - 10.
Road completely blocked by slide
August 16, 1940 - See All Results
Refine Your Search
Types (1)
Photographs (16)Locations (1)
Milepost 319 (16)Sections (1)
2K (16)Counties (1)
Avery (16)



