Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Dam
November, year unknown - 2.
Bridge Construction
1930s - 3.
Bridge Construction
1930s - 4.
Construction of Pier #3
1930s - 5.
Work on Pier #3
1930s - 6.
Road Construction
June 3, 1955 - 7.
Between Grandfather Mt and Blowing Rock, Present Road on Crest of Ridge-Proposed Parkway Location of Ridge Towards the North
June 19, 1935 - 8.
Lake basin
June 2, 1936 - 9.
Gwyn's rhododendron. Heavily wooded and rocky mountain stream
June 2, 1936 - 10.
Proposed Location of 2-G
November 27, 1941 - See All Results
Refine Your Search
Types (3)
Photographs (27) Maps (2) Drawings, Plans, and Projections (1)Locations (1)
Section 2G (30)Sections (1)
2G (30)Counties (1)
Watauga (30)



