Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935
-
Before grading. Showing objectionable effect of uniform slopes and insufficient rounding
July 25, 1935
-
Shovel loading
July 23, 1936
-
Line Guides
July 23, 1936
-
Hand-placed rock wall
August 20, 1936
-
Bridge #8 Pier
September 16, 1936
-
Crushed stone base for rubble gutter
October 13, 1936
Page 1 of 1.
Items in Query
Results: 7
Refine Your Search
Types (1)
Photographs (7)Locations (1)
Milepost 227 (7)Sections (1)
2A (7)Counties (1)
Alleghany (7)