Before grading. 1:1 cut gullying badly; too steep to grass; flatten and round for grass
July 25, 1935 - 2.
Before grading. Showing objectionable effect of uniform slopes and insufficient rounding
July 25, 1935 - 3.
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935 - 4.
Shovel loading
July 23, 1936 - 5.
Line Guides
July 23, 1936 - 6.
Hand-placed rock wall
August 20, 1936 - 7.
Rock wall on side of road
August 23, 1936 - 8.
Brush Creek Bridge #8, Pier from south
September 16, 1936 - 9.
Bridge #8 Pier
September 16, 1936 - 10.
Brush Creek Bridge #8 Pier
September 16, 1936 - See All Results