Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Before grading. 1:1 cut gullying badly; too steep to grass; flatten and round for grass
July 25, 1935 -
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935 -
Before grading. Showing objectionable effect of uniform slopes and insufficient rounding
July 25, 1935 -
Shovel loading
July 23, 1936 -
Line Guides
July 23, 1936 -
Hand-placed rock wall
August 20, 1936 -
Rock wall on side of road
August 23, 1936 -
Brush Creek Bridge #8 Pier
September 16, 1936 -
Bridge #8 Pier
September 16, 1936 -
Brush Creek Bridge #8, Pier from south
September 16, 1936
Items in Query
Results: 16
Refine Your Search
Types (1)
Photographs (16)Locations (1)
Milepost 227 (16)Sections (1)
2A (16)Counties (1)
Alleghany (16)



