Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Hare Mill Pond with hillside and buildings
1930s - 2.
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936 - 3.
General ground conditions, showing erosion
April 16, 1936 - 4.
General ground conditions showing stream conditions
April 16, 1936 - 5.
Type #1 Headwall, Single
April 16, 1936 - 6.
Type #1 headwall, single
April 16, 1936 - 7.
General Ground Conditions Showing Stream Conditions
April 16, 1936 - 8.
Arch-cut Stone, Double Box Culvert
April 16, 1936 - 9.
Type #3 headwall, single
April 16, 1936 - 10.
Arch + cut stone - double box culvert
April 16, 1936 - 11.
Bridge Tunnel
May 15, 1936 - 12.
Bridge Tunnel
May 23, 1936 - 13.
Bridge Construction
May 23, 1936 - 14.
Valley
July 23, 1936 - 15.
Path North over Proposed Bridge
July 23, 1936 - 16.
Culvert Head Wall
July 23, 1936 - 17.
View of culvert
October 13, 1936 - 18.
Simple arch culvert on west side of parkway
October 13, 1936 - 19.
Bridge Construction
December 1, 1936 - 20.
Bridge Construction
February 4, 1937 - 21.
Bridge at site #7 Steel construction, looking back from south abutment
March 29, 1937 - 22.
East parapet wall south abutment
March 29, 1937 - 23.
Bridge at site #7 Steel construction
March 29, 1937 - 24.
North abutment and stringers
March 29, 1937 - 25.
Bridge Construction
April 10, 1937 - 26.
Detail of expansion dam
April 10, 1937 - 27.
Guard rail, No.7 bridge
May 4, 1937 - 28.
Bridge #7, approximate cost $45,000
May 18, 1937 - 29.
Bridge #7 approximate cost $45,000
May 18, 1937 - 30.
Bridge #7, guard rail and pier detail
May 18, 1937 - 31.
Underside of Viaduct
May 18, 1937 - 32.
Viaduct Bridge #7
1940
Refine Your Search
Types (1)
Photographs (32)Locations (1)
Milepost 225 (32)Sections (1)
2A (32)Counties (1)
Alleghany (32)



