Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Hare Mill Pond with hillside and buildings
1930s - 2.
General ground conditions showing stream conditions
April 16, 1936 - 3.
General ground conditions, showing erosion
April 16, 1936 - 4.
Type #3 headwall, single
April 16, 1936 - 5.
General Ground Conditions Showing Stream Conditions
April 16, 1936 - 6.
Type #1 headwall, single
April 16, 1936 - 7.
Bridge Tunnel
May 15, 1936 - 8.
Bridge Construction
May 23, 1936 - 9.
Valley
July 23, 1936 - 10.
Culvert Head Wall
July 23, 1936 - See All Results
Refine Your Search
Types (1)
Photographs (11)Locations (1)
Milepost 225 (11)Sections (1)
2A (11)Counties (1)
Alleghany (11)



