Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Hillside
1930s - 2.
View of road
1930s - 3.
Top soil stripping operations
November 26, 1935 - 4.
Bridge 10, site of construction
August 25, 1936 - 5.
Before grading. Tape used to show concave slope. Needs transition, overhand and wide rounding
July 25, 1938
Refine Your Search
Types (1)
Photographs (5)Locations (1)
Section 2A (5)Sections (1)
2A (5)Counties (1)
Alleghany (5)



