Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Bridge at site #7 Steel construction
March 29, 1937
-
Bridge at site #7 Steel construction, looking back from south abutment
March 29, 1937
-
East parapet wall south abutment
March 29, 1937
-
Bridge at Site #7, Steel Construction
March 29, 1937
-
Cutting for telephone line on right-of-way line
March 30, 1937
Items in Query
Results: 95
Refine Your Search
Types (2)
Photographs (94) Maps (1)Locations (20)
Cumberland Knob (18) Milepost 225 (13) Milepost 232 (9) Section 2A (8) Milepost 221 (6) Milepost 226 (6) Milepost 217 (5) Milepost 234 (4) Hare Mill Pond (3) Milepost 227 (3) Milepost 228 (3) Milepost 235 (3) Cumberland Knob Park (2) Milepost 218 (2) Milepost 222 (2) Milepost 224 (2) Milepost 231 (2) Milepost 236 (2) D.F. Wagoner Place (1) Milepost 233 (1)Sections (2)
2A (73) 2B (22)Counties (3)
Alleghany (87) Wilkes (5) Surry (2)