Before grading operation and clean-up, looking north
October 18, 1938
-
Expansion joints at junction of spandrel and wing walls
October 18, 1938
-
Pouring Concrete
March 25, 1939
-
8x10 box culvert outlet end
December 22, 1947
-
Culvert construction. Covering top slab for protection against weather.
January 9, 1948
-
Culvlert construction. Concrete mixing setup.
January 9, 1948
-
Culvert construction. Masked inlet to prevent circulation of cold air.
January 9, 1948
-
Culvert const. [construction] top slab completed.
January 9, 1948
-
Culvert construction. Pouring top slab
January 9, 1948
-
Culvert construction - Concrete mixing crew and runway to top slab
January 9, 1948
Items in Query
Results: 41
Refine Your Search
Types (1)
Photographs (41)Locations (15)
Virginia State Route 43 at Little Stony Creek (13) Section 2G (5) Milepost 230 (4) Milepost 296 (4) Section 2A (4) Flat Top Mountain (N.C.) (2) Beacon Heights (1) Grandfather Mountain (1) Linn Cove Viaduct (1) Milepost 225 (1) Milepost 240 (1) Milepost 241 (1) Milepost 294 (1) Milepost 295 (1) Section 2M (1)Sections (8)
1K (13) 2G (13) 2A (5) 2B (4) 2C (2) 2H (2) 2J (1) 2M (1)Counties (5)
Bedford (13) Watauga (13) Alleghany (11) Avery (3) Yancey (1)