Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Access A
September 18, 1942
-
Rte 609 [610] Access before L.D.
September 18, 1942
-
Fill after grading and seeding
November 6, 1942
-
Rail yard and sample fence
January 1943
-
Wood flume and box to take surface water from shoulder berms
July 15, 1943
-
Flume emptying into inlet, at junction of Parkway and Route 609 [610]
July 15, 1943
-
Flume inlet detail
July 15, 1943
-
Slope for experiments 2 and 4 before work was done
July 23, 1943
-
Slope for Experiments 1 and 3 during scaling operations
July 23, 1943
-
Experiment 2 after holes were silled with sawdust and earth. Note earth being lost on slope from rounding
July 26, 1943
Items in Query
Results: 164
Refine Your Search
Types (1)
Photographs (164)Locations (15)
Humpback Rocks Visitor Center and Mountain Farm (57) Rockfish Gap (28) Rockfish Gap Overpass (28) Milepost 0 (13) Section 1C (8) Milepost 7 (6) Shenandoah Valley Parking Overlook (6) Section 1B (4) Milepost 6 (3) Ravens Roost Overlook (3) Milepost 10 (2) Milepost 15 (2) Sherando Lake Recreation Area (2) Greenstone Overlook (1) Milepost 9 (1)Sections (2)
1B (136) 1C (28)Counties (1)
Augusta (164)