Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Burnt car found on Sec 2E
July 19, 1940
-
Soil Erosion
1941
-
Back of wall. Sample section of guard wall
July 1, 1941
-
Top and inside of wall. Sample section of guard wall.
July 1, 1941
-
Gully control (after)
July 26, 1941
-
Gully control (after)
July 26, 1941
-
Gully control (after)
July 26, 1941
-
Gully control (afer)
July 26, 1941
-
Gully and sheet erosion (work started)
November 1941
-
Gully and sheet erosion (mulching with pine)
November 1941
Items in Query
Results: 36
Refine Your Search
Types (1)
Photographs (36)Locations (5)
Milepost 268 (12) Section 2E (11) Milepost 262 (6) Milepost 263 (5) Daniels Gap (2)Sections (1)
2E (36)Counties (1)
Ashe (36)