Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Grass bay and open forest site before clean-up
October 15, 1937
-
Before selective cutting
October 15, 1937
-
Before cleanup
October 15, 1937
-
Before clean-up
January 10, 1938
-
Shrub bay site before clean-up
January 10, 1938
-
Before grading. Rotten rock 1:1; ditch too narrow ugly profile.
July 25, 1938
-
Before grading. Steep, rotten rock cuts, shoulder and ditch. 2 ft short
July 25, 1938
-
Before grading. A 3/4 to 1 slope with almost vertical overhang of soft rock
July 25, 1938
-
Before grading. Cleared to connect slope line, with rock as excuse for steep slope. Ugly profile.
July 25, 1938
-
Before grading. Cave-in on 1:1 slope. Will continue to slide unless flattened. Needs rounding.
July 25, 1938
Items in Query
Results: 69
Refine Your Search
Types (2)
Photographs (67) Maps (2)Locations (27)
Milepost 145 (8) Section 2A (7) Milepost 224 (4) Milepost 226 (4) Milepost 227 (4) Milepost 229 (4) Milepost 155 (3) Milepost 164 (3) Milepost 168 (3) Milepost 170 (3) Milepost 232 (3) Milepost 163 (2) Milepost 167 (2) Milepost 218 (2) Milepost 222 (2) Milepost 223 (2) Milepost 264 (2) Blue Ridge Quarry (1) Hare Mill Pond (1) Milepost 152 (1) Milepost 219 (1) Milepost 228 (1) Milepost 236 (1) Milepost 268 (1) Milepost 275 (1) Milepost 276 (1) Section 2B (1)Sections (7)
2A (32) 1Q (12) 1S (8) 1R (5) 2B (5) 2E (5) 1L (1)Counties (8)
Alleghany (36) Franklin (12) Floyd (11) Wilkes (3) Patrick (2) Watauga (2) Ashe (1) Bedford (1)