Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Early Construction
November 1, 1935
-
Face of Sample Wall, Showing Raked Joints and Over 'Dressed Stone,' Giving a Hard, Formal Appearance
November 12, 1935
-
Back of sample wall, showing same stone laid in a more informal treatment, etc
November 13, 1935
-
Rock filled tiled drain left of center line
November 26, 1935
-
General view of construction rough grading
November 26, 1935
-
General view construction through low area
November 26, 1935
-
Box culvert 8' x 6', 15° skew
November 26, 1935
-
Top soil stripping operations
November 26, 1935
-
Stripped area and top soil storage pile
November 26, 1935
-
Box culvert, 8' x 6', 15° skew
November 26, 1935
Items in Query
Results: 601
Refine Your Search
Types (4)
Photographs (589) Maps (7) Drawings, Plans, and Projections (3) Newspaper Articles (2)Locations (24)
Section 2A (175) Cumberland Knob (102) Milepost 229 (34) Milepost 224 (33) Milepost 217 (32) Milepost 225 (31) Cumberland Knob Park (27) Milepost 221 (22) Milepost 227 (18) Milepost 228 (18) Milepost 218 (17) Fox Hunters Paradise (14) Milepost 226 (13) Milepost 222 (11) Devil's Garden (9) Hare Mill Pond (9) Milepost 220 (8) Milepost 223 (7) Milepost 219 (6) Pine Creek Bridge #4 (6) Intersection of Blue Ridge Parkway at North Carolina State Route 18 (near Ennice, N.C.) (3) R.L. Martin Tract (3) Fishers Peak (2) NC State Line (1)Sections (1)
2A (601)Counties (2)
Alleghany (574) Surry (27)