Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Regional Sketch Map
1935 - 2.
Stone Masons
1935 - 3.
Location Plan for Overpass at North Carolina St. H'way #26
1935 - 4.
Special headwall 10' x 7' R.C. box
May 25, 1935 - 5.
Special Headwall, 10' x 7' R.C. Box
May 25, 1935 - 6.
Panorama of Green Mountain
May 31, 1935 - 7.
Bull Head Mountain taken from Rte#26
May 31, 1935 - 8.
Devils Garden Showing Steep Rocky Slopes
May 31, 1935 - 9.
Bull Head Mountain and Deep Gap panorama
May 31, 1935 - 10.
Overpass (NC #18) near Mulberry Gap Back
June 20, 1935 - 11.
Overpass near Mulberry Gap (from NC #18 on west)
June 20, 1935 - 12.
Before grading. Detail showing depth of gullies in erosive soil. Rock decomposed into sand.
July 25, 1935 - 13.
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935 - 14.
Before grading. 1:1 cut gullying badly; too steep to grass; flatten and round for grass
July 25, 1935 - 15.
Before grading. Gullies and cave-ins. Slope too steep.
July 25, 1935 - 16.
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935 - 17.
Before grading. Showing objectionable effect of uniform slopes and insufficient rounding
July 25, 1935 - 18.
Before grading. Soft gullying material above rock. Flatten expose hard rock. Wide rounding.
July 25, 1935 - 19.
Before grading. Deep gullies in erosive soil. Need flattening and rounding. Contour ditches required above.
July 25, 1935 - 20.
First Gradeing Contract
September 1935 - 21.
First Grading Contract
September 1935 - 22.
First Grading Contract
September 1935 - 23.
First Gradeing Contract
September 1935 - 24.
Roaring Gap Detail of stone entrance gate post
September 17, 1935 - 25.
New New River Bridge, Detail of Chimney of Old House
September 17, 1935 - 26.
Stone work of Graystone Inn
September 18, 1935 - 27.
Detail of wall just below quarry.
September 18, 1935 - 28.
Stone quarry for Roaring Gap Hotel
September 18, 1935 - 29.
Roaring Gap Hotel Detail Stone Work on the North Wing
September 18, 1935 - 30.
Stone quarry for Roaring Gap Hotel
September 18, 1935 - 31.
Early Construction
November 1, 1935 - 32.
Roaring Gap Hotel. General view of Graystone Inn
November 12, 1935 - 33.
Face of Sample Wall, Showing Raked Joints and Over 'Dressed Stone,' Giving a Hard, Formal Appearance
November 12, 1935 - 34.
Back of sample wall, showing same stone laid in a more informal treatment, etc
November 13, 1935 - 35.
Box culvert, 8' x 6', 15° skew
November 26, 1935 - 36.
Stripped area and top soil storage pile
November 26, 1935 - 37.
General view construction through low area
November 26, 1935 - 38.
General view of construction rough grading
November 26, 1935 - 39.
Top soil stripping operations
November 26, 1935 - 40.
Rock filled tiled drain left of center line
November 26, 1935 - 41.
Box culvert 8' x 6', 15° skew
November 26, 1935
Refine Your Search
Types (2)
Photographs (39) Maps (2)Locations (16)
Milepost 221 (6) Milepost 226 (5) Milepost 218 (4) Section 2A (4) Junction of 2A/2B (3) Milepost 227 (3) Bull Head Mountain (2) Intersection of Blue Ridge Parkway and North Carolina State Route 18 (near Laurel Springs, N.C.) (2) Milepost 217 (2) Milepost 228 (2) See All ResultsSections (3)
2A (30) 2B (6) 2C (2)Counties (1)
Alleghany (41)



