Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
NP 21 before planting
1938 - 2.
Land Acquisition Maps Section 2-C
1938 - 3.
Land Acquisition Maps Section 2-A
1938 - 4.
L.F. Caudill
1938 - 5.
Shoulder construction, High Piney Ridge in background
1938 - 6.
Rock cut at Devil's Garden
1938 - 7.
Cumberland Park Pump House
January 5, 1938 - 8.
Cumberland Knob Slope flattening at entrance
January 24, 1938 - 9.
Mahogany Rock Parking Overlook after grading
January 24, 1938 - 10.
Wildcat Rock and Lodge Parking area (proposed)
March 1938 - 11.
Sheep Hill Brand Lodge Site and proposed water storage
March 1938 - 12.
Spillage (smaller rock above) from excavation for north abutment of viaduct
March 8, 1938 - 13.
View of road
March 12, 1938 - 14.
The Bluff Crusher and Parkway
March 12, 1938 - 15.
Picnic Table
March 12, 1938 - 16.
Bridge - Grassy Gap Road
March 12, 1938 - 17.
Road on Top of Hills
March 12, 1938 - 18.
Picnic Table
March 12, 1938 - 19.
Road construction to picnic area
March 12, 1938 - 20.
Bridge - Grassy Gap Road
March 12, 1938 - 21.
Picnic Shelter Blueprints
April 11, 1938 - 22.
Taken to show log corner detail -- underexposed
April 21, 1938 - 23.
Barn proposed for acquisition. Note logs and shake roof.
April 21, 1938 - 24.
Devil's Garden Parking and Overlook after Grading
April 21, 1938 - 25.
Front of barn as it would be seen from the parkway.
April 21, 1938 - 26.
Shelter on Top of Cumberland Knob
April 27, 1938 - 27.
Looking West from One of the Parking Areas South of Cumberland Knob
April 27, 1938 - 28.
Forest Clearing
May 11, 1938 - 29.
CCC Camp just moving in
June 1938 - 30.
Big Cut at Devil's Garden
June 14, 1938 - 31.
60ft cut at Devils Garden
June 14, 1938 - 32.
Signs near parking area
July 1, 1938 - 33.
Grade separation Class B masonry and concrete barrel
July 1, 1938 - 34.
Grade separation, south elevation
July 1938 - 35.
Water Fountain
July 1938 - 36.
Inside of wall parking area
July 11, 1938 - 37.
Face of Wall in Woods
July 11, 1938 - 38.
Return Cabin Loop to Camping Loop
July 11, 1938 - 39.
Dam site and watershed
July 11, 1938 - 40.
Bluff Park from lodge site
July 12, 1938 - 41.
Retaining Wall Picnic Area
July 12, 1938 - 42.
West Abutment, Overpass US 21
July 12, 1938 - 43.
Slope on Parkway
July 16, 1938 - 44.
Unpaved roadway with erosion
July 25, 1938 - 45.
Before grading. Rotten rock 1:1; ditch too narrow ugly profile.
July 25, 1938 - 46.
Before grading. Cave-in on 1:1 slope. Will continue to slide unless flattened. Needs rounding.
July 25, 1938 - 47.
Before grading. Steep, rotten rock cuts, shoulder and ditch. 2 ft short
July 25, 1938 - 48.
Before grading. Tape used to show concave slope. Needs transition, overhand and wide rounding
July 25, 1938 - 49.
Before grading. A 3/4 to 1 slope with almost vertical overhang of soft rock
July 25, 1938 - 50.
Before grading. Cleared to connect slope line, with rock as excuse for steep slope. Ugly profile.
July 25, 1938 - 51.
Washout at headwall. Shows need of different type of structure.
August 1, 1938 - 52.
Water Storage Tank, Cabin Area
September 28, 1938 - 53.
Entrance road to lodge site
September 28, 1938 - 54.
Clearing for Water Supply Reservoir
September 28, 1938 - 55.
Construction Unit Water Storage North End of Dam
September 28, 1938 - 56.
Cut before grading
October 2, 1938 - 57.
Northwest elevation showing grading.
October 3, 1938 - 58.
Cut before grading
October 4, 1938 - 59.
Fill before grading
October 4, 1938 - 60.
Fill Before Grading
October 6, 1938 - 61.
Spandrel Wall - Rubble wing wall and concrete vault
October 18, 1938 - 62.
Before grading operation and clean-up, looking north
October 18, 1938 - 63.
Expansion joints at junction of spandrel and wing walls
October 18, 1938 - 64.
Cut before grading
October 21, 1938 - 65.
Cut before grading
October 21, 1938 - 66.
Cut before grading
October 21, 1938 - 67.
Cut before grading
October 21, 1938 - 68.
Cut, before grading
November 11, 1938 - 69.
Fill, before grading
November 7, 1938 - 70.
Fill, before grading
November 7, 1938 - 71.
Cut before grading, looking back
November 22, 1938 - 72.
Cut before grading, looking back
November 22, 1938 - 73.
Cut before grading, looking back
November 22, 1938 - 74.
Before grading
December 1938 - 75.
Before grading
December 1938 - 76.
Before grading
December 1938 - 77.
Before Grading
December 1938 - 78.
Before grading
December 1938 - 79.
Before grading. Looking back across Hare Mill Pond
December 15, 1938 - 80.
High cuts thru wooded area. During selective cutting.
December 15, 1938
Refine Your Search
Types (3)
Photographs (76) Maps (3) Drawings, Plans, and Projections (1)Locations (25)
Doughton Park (10) Section 2A (9) Milepost 239 (8) Cumberland Knob (5) Milepost 230 (5) Milepost 241 (5) Devil's Garden (4) Milepost 224 (4) Section 2C (4) Bluff Park (3) See All ResultsSections (3)
2C (40) 2A (32) 2B (8)Counties (1)
Alleghany (80)



