Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Location Plan for Overpass at North Carolina St. H'way #26
1935 - 2.
Stone Masons
1935 - 3.
Regional Sketch Map
1935 - 4.
Special Headwall, 10' x 7' R.C. Box
May 25, 1935 - 5.
Special headwall 10' x 7' R.C. box
May 25, 1935 - 6.
Bull Head Mountain and Deep Gap panorama
May 31, 1935 - 7.
Panorama of Green Mountain
May 31, 1935 - 8.
Devils Garden Showing Steep Rocky Slopes
May 31, 1935 - 9.
Bull Head Mountain taken from Rte#26
May 31, 1935 - 10.
Overpass (NC #18) near Mulberry Gap Back
June 20, 1935 - 11.
Overpass near Mulberry Gap (from NC #18 on west)
June 20, 1935 - 12.
Before grading. Detail showing depth of gullies in erosive soil. Rock decomposed into sand.
July 25, 1935 - 13.
Before grading. 1:1 cut gullying badly; too steep to grass; flatten and round for grass
July 25, 1935 - 14.
Before grading. Gullies and cave-ins. Slope too steep.
July 25, 1935 - 15.
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935 - 16.
Before grading. Showing objectionable effect of uniform slopes and insufficient rounding
July 25, 1935 - 17.
Before grading. Deep gullies in erosive soil. Need flattening and rounding. Contour ditches required above.
July 25, 1935 - 18.
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935 - 19.
Before grading. Soft gullying material above rock. Flatten expose hard rock. Wide rounding.
July 25, 1935 - 20.
First Gradeing Contract
September 1935 - 21.
First Grading Contract
September 1935 - 22.
First Gradeing Contract
September 1935 - 23.
First Grading Contract
September 1935 - 24.
Roaring Gap Detail of stone entrance gate post
September 17, 1935 - 25.
New New River Bridge, Detail of Chimney of Old House
September 17, 1935 - 26.
Detail of wall just below quarry.
September 18, 1935 - 27.
Roaring Gap Hotel Detail Stone Work on the North Wing
September 18, 1935 - 28.
Stone work of Graystone Inn
September 18, 1935 - 29.
Stone quarry for Roaring Gap Hotel
September 18, 1935 - 30.
Stone quarry for Roaring Gap Hotel
September 18, 1935 - 31.
Early Construction
November 1, 1935 - 32.
Roaring Gap Hotel. General view of Graystone Inn
November 12, 1935 - 33.
Face of Sample Wall, Showing Raked Joints and Over 'Dressed Stone,' Giving a Hard, Formal Appearance
November 12, 1935 - 34.
Back of sample wall, showing same stone laid in a more informal treatment, etc
November 13, 1935 - 35.
Stripped area and top soil storage pile
November 26, 1935 - 36.
Box culvert 8' x 6', 15° skew
November 26, 1935 - 37.
Box culvert, 8' x 6', 15° skew
November 26, 1935 - 38.
General view of construction rough grading
November 26, 1935 - 39.
Top soil stripping operations
November 26, 1935 - 40.
General view construction through low area
November 26, 1935 - 41.
Rock filled tiled drain left of center line
November 26, 1935 - 42.
Bluff Park Culvert Grassy Gap Road
January 5, 1936 - 43.
Bluff Park Bridle Trail, looking toward Bluff
January 5, 1936 - 44.
The Bluffs, Sec 2C Rhododendron Valley from Inn site (Doughton Park)
August 2, 1936 - 45.
Chimney, clay-mortar stone. Holloway place
February 13, 1936 - 46.
Chimney, clay mortar stone, Holloway place. Chimney details showing stone generally found along parkway, Sec 1P through 2F.
February 14, 1936 - 47.
Chimney, clay-mortar stone Holloway place
February 14, 1936 - 48.
Chimney dry-laid stone. D.F. Wagoner Place
February 14, 1936 - 49.
Chimney, clay-mortar stone, Holloway place
February 14, 1936 - 50.
Chimney, dry-laid stone. D.F. Wagoner place.
February 14, 1936 - 51.
Chimney, clay-mortar stone, Holloway place.
February 14, 1936 - 52.
Holloway Place
February 14, 1936 - 53.
Retaining wall class B masonry See #5951
February 15, 1936 - 54.
Retaining wall, class B masonry
February 15, 1936 - 55.
Stone work detail Class B masonry retaining wall See neg# 5951
February 15, 1936 - 56.
Retaining wall, Class B, masonry. See neg# 5951
February 15, 1936 - 57.
Inlet headwall-pipe culvert
February 19, 1936 - 58.
Dry Masonry Stone Foundation, slaty schist.
February 19, 1936 - 59.
Vertical View of Ice Rock
February 26, 1936 - 60.
Overpass at Meadow Fork
March 4, 1936 - 61.
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936 - 62.
Type #3 headwall, single
April 16, 1936 - 63.
Type #1 Headwall, Single
April 16, 1936 - 64.
Arch-cut Stone, Double Box Culvert
April 16, 1936 - 65.
General ground conditions, showing erosion
April 16, 1936 - 66.
Type #1 headwall, single
April 16, 1936 - 67.
General ground conditions showing stream conditions
April 16, 1936 - 68.
General Ground Conditions Showing Stream Conditions
April 16, 1936 - 69.
Arch + cut stone - double box culvert
April 16, 1936 - 70.
Early Construction
April 17, 1936 - 71.
The Bluff, View of Basin Cedar Ridge
April 20, 1936 - 72.
Picnic area before clearing
April 21, 1936 - 73.
Road construction
April 27, 1936 - 74.
Cumberland Knob Picnic Area
April 28, 1936 - 75.
Cumberland Knob Picnic Area
April 28, 1936 - 76.
Masonry in retaining wall Class B
April 29, 1936 - 77.
View of Wagon Drill
May 2, 1936 - 78.
Drilling Operations
May 2, 1936 - 79.
Bridge Tunnel
May 15, 1936 - 80.
Parkway Road
May 23, 1936 - 81.
Parkway Road
May 23, 1936 - 82.
Parkway Road
May 23, 1936 - 83.
Parkway Road
May 23, 1936 - 84.
Bridge Tunnel
May 23, 1936 - 85.
Bridge Tunnel
May 23, 1936 - 86.
Bridge Construction
May 23, 1936 - 87.
Masonry Wall
May 23, 1936 - 88.
Parkway Road
May 23, 1936 - 89.
Heavy Machinery and Construction
May 23, 1936 - 90.
Special headwall, Type #1 10' x 7' Box
May 25, 1936 - 91.
Cribbing check dams with brush back-fill
May 25, 1936 - 92.
Log Cribbing and Check Dams for Erosion Control
May 25, 1936 - 93.
Log cribbing and check for erosion control
May 26, 1936 - 94.
Log cribbing and check dams for erosion control
May 26, 1936 - 95.
Log Cribbing and Check Dams for Erosion Control
May 26, 1936 - 96.
Switchback on trail from Cumberland Knob, picnic area to gulley. Creek showing ramps.
May 30, 1936 - 97.
Open grassy area on Knob, looking west
May 30, 1936 - 98.
Clearing below Knob, Looking toward Spur
May 30, 1936 - 99.
Construction of Crib-Work for Trail
June 2, 1936 - 100.
Completed Trail, Indian Grave Trail
June 15, 1936 - 101.
Trail Route, Before Construction "Indian Grave Trail"
June 15, 1936 - 102.
Completed Cribbing "Spur Trail"
June 15, 1936 - 103.
Cribbing of trail, almost complete "Spur Trail"
June 15, 1936 - 104.
Completed Shuttle Trail, Looking Ahead
June 15, 1936 - 105.
Culvert at Station 517
June 23, 1936 - 106.
Detailed View of Bridge Abutment
June 23, 1936 - 107.
Bridge Site #10 Prior to Construction
June 23, 1936 - 108.
Detail View of Bridge Site #6
June 23, 1936 - 109.
Bridge #6 During Construction (Section 2A)
June 23, 1936 - 110.
Unique Culvert Near Station 262
June 23, 1936 - 111.
Pre-Asphalt Road in Section 2A
June 23, 1936 - 112.
Coarse Stone Road in Section 2A
June 23, 1936 - 113.
Early Road Cut in Section 2A
June 23, 1936 - 114.
Channel Change at Bridge Site #10 (Section 2A)
June 23, 1936 - 115.
Detail View of Bridge #1 Construction
June 23, 1936 - 116.
Early Construction in section 2C
June 26, 1936 - 117.
Early Construction
June 26, 1936 - 118.
Cement Masonry
June 30, 1936 - 119.
Baffles
June 30, 1936 - 120.
Right Hand Beam
July 13, 1936 - 121.
A Step Detail in Indian Grave Trail
July 14, 1936 - 122.
Section of Trail Under Construction - Gully Creek
July 14, 1936 - 123.
Bridge #1 left-handed beam
July 14, 1936 - 124.
4th switch and rest bench site
July 14, 1936 - 125.
Partially Completed Overlook
July 22, 1936 - 126.
"Bridge 3" Construction in Section 2A
July 22, 1936 - 127.
Bridge Construction Site in Section 2A
July 22, 1936 - 128.
Side view Bridge Construction in Section 2A
July 22, 1936 - 129.
Car on winding road
July 22, 1936 - 130.
Bridge Construction in Section 2A
July 22, 1936 - 131.
Early Construction
July 22, 1936 - 132.
Early Construction of Bridge in Section 2A
July 22, 1936 - 133.
River/Trench
July 22, 1936 - 134.
First Parkway Crossing of NC 18, Near Sparta, NC
July 22, 1936 - 135.
View of Machined-Flattened Parkway
July 22, 1936 - 136.
Pre-Asphalt Parkway Near Virginia Border
July 22, 1936 - 137.
Vehicle Tracks
July 22, 1936 - 138.
Wall 611
July 23, 1936 - 139.
Valley
July 23, 1936 - 140.
Cumberland Knob
July 23, 1936 - 141.
Line Guides
July 23, 1936 - 142.
Road Between Hills
July 23, 1936 - 143.
Bridge site east side looking south
July 23, 1936 - 144.
#9 Bridge
July 23, 1936 - 145.
Bridge site #1 east side looking north
July 23, 1936 - 146.
Unpaved Road #1
July 23, 1936 - 147.
Under Drain
July 23, 1936 - 148.
Drilling
July 23, 1936 - 149.
Cumberland Knob #1
July 23, 1936 - 150.
Culvert Head Wall
July 23, 1936 - 151.
Bridge 2
July 23, 1936 - 152.
Paths
July 23, 1936 - 153.
Path North over Proposed Bridge
July 23, 1936 - 154.
Part of #2 Abutment Face
July 23, 1936 - 155.
Shovel loading
July 23, 1936 - 156.
Early Construction
July 23, 1936 - 157.
Cement Rock Wall
July 23, 1936 - 158.
mixer
July 28, 1936 - 159.
Completed Rough Grade
July 28, 1936 - 160.
steep side hill
July 28, 1936 - 161.
Doughton Park #1
July 28, 1936 - 162.
Clearing operations
July 29, 1936 - 163.
Early Construction
July 29, 1936 - 164.
Roadway
July 29, 1936 - 165.
View from Cumberland Knob
August 1936 - 166.
View showing small pine trees cut by the owner, Wright property
August 1936 - 167.
Wright property. View showing small pine trees cut by the owner
August 1936 - 168.
View of small waterfall. Camera at intersection of trail and stream
August 1936 - 169.
Meadow Fork - View looking south from edge of parkway
August 1936 - 170.
Wright Property, View Showing Small Pine Trees Cut by the Owner
August 1936 - 171.
Waterfall Cumberland Knob
August 1936 - 172.
Cumberland Knob waterfall
August 1936 - 173.
Bench along trail at a point 100 yards from picnic area.
August 1936 - 174.
Cumberland Knob
August 1936 - 175.
Small waterfall, Camera placed at intersection of trail and stream
August 1936 - 176.
View from Top Looking Direction of Fishers Peak
August 1936 - 177.
View from Highest Point in Cumberland Knob
August 1936 - 178.
Fern Covered Rock along Trail
August 1936 - 179.
View looking south along parkway
August 1936 - 180.
The Bluffs Sec 2C Wildcat Rocks, Inn site (Doughton Park)
August 3, 1936 - 181.
Bridge site #6 Southwest wing wall
August 3, 1936 - 182.
Wildcat Rocks
August 3, 1936 - 183.
Northwest wing wall. Bush Creek Bridge.
August 4, 1936 - 184.
Southwest wing wall
August 4, 1936 - 185.
Southeast wing wall
August 4, 1936 - 186.
Bridge Site #6, Southwest Wing Wall, Pine Creek Bridge No. 6
August 4, 1936 - 187.
Bridge #6 Northwest wing wall
August 4, 1936 - 188.
Willow planted along channel change, 10 days after planting
August 13, 1936 - 189.
Buck Creek Gap
August 14, 1936 - 190.
Mountain slope and construction
August 20, 1936 - 191.
Hand-placed rock wall
August 20, 1936 - 192.
Early Construction
August 21, 1936 - 193.
View of Parkway
August 22, 1936 - 194.
Bridge and Abutment Construction
August 22, 1936 - 195.
Bridge Construction
August 22, 1936 - 196.
Bridge and Abutment Construction
August 22, 1936 - 197.
Bridge and Abutment Construction
August 22, 1936 - 198.
Bridge and Abutment Construction
August 22, 1936 - 199.
Curved Head Wall
August 22, 1936 - 200.
Retaining Wall
August 22, 1936 - 201.
Bridge 4, excavation site
August 22, 1936 - 202.
Ahead at site of excavation for bridge #4.
August 22, 1936 - 203.
Road View
August 22, 1936 - 204.
Hare Mill Pond, scenic view
August 22, 1936 - 205.
Bridge and Abutment Construction
August 22, 1936 - 206.
Hare Mill Pond, scenic view
August 22, 1936 - 207.
Road View
August 22, 1936 - 208.
Bridge Construction
August 22, 1936 - 209.
Bridge and Abutment
August 22, 1936 - 210.
Early Construction
August 22, 1936 - 211.
Bridge and Abutment Construction
August 22, 1936 - 212.
Bridge 10, site of construction
August 23, 1936 - 213.
Stone masonry wall
August 23, 1936 - 214.
Excavation for tree well
August 23, 1936 - 215.
Bridge 10, site of construction
August 23, 1936 - 216.
Rock wall on side of road
August 23, 1936 - 217.
Road construction
August 24, 1936 - 218.
Rock slope in woods
August 24, 1936 - 219.
Early Construction
August 24, 1936 - 220.
View of Head Wall
August 24, 1936 - 221.
Road construction
August 24, 1936 - 222.
Bridge 10, site of construction
August 25, 1936 - 223.
South abutment
August 26, 1936 - 224.
Stone detail
August 26, 1936 - 225.
After stream improvement
August 26, 1936 - 226.
Close-up of plant group left of parkway
August 27, 1936 - 227.
Plant group left of parkway
August 27, 1936 - 228.
Plant group left of parkway
August 27, 1936 - 229.
View of Trail Leading to Cumberland Knob from the Parking Area
August 31, 1936 - 230.
View from parkway looking east down small revine south of Knob
September 1936 - 231.
View from edge of parkway, 1 looking north along alignment towad Cumberland Knob Park Area
September 1936 - 232.
View of small water fall and stream which crosses the trail at the point where the camera is placed
September 1936 - 233.
Side view from parkway near Ice Rocks
September 1936 - 234.
Cabin within 100' right-of-way, looking north
September 1936 - 235.
Bluffs Park, view from Wild Cat to Basin Creek
September 1936 - 236.
Latest wagon drill in action. View looking south from point toward Bluffs
September 1936 - 237.
View of Rock cut looking south
September 1936 - 238.
Construction of New Blue Ridge Parkway Means Much To Our County
September 3, 1936 - 239.
Bridge Site #6, Southwest Wing Wall Under Construction
September 4, 1936 - 240.
Bridge site #6 Southeast wing wall under construction
September 4, 1936 - 241.
View looking south along parkway
September 8, 1936 - 242.
View of Fishers Peak from Trail
September 8, 1936 - 243.
View from Highest Point Looking Northeast
September 8, 1936 - 244.
Looking east toward Pilot Mountain which is shown very faintly in middle center of picture
September 8, 1936 - 245.
Intersection of North Carolina 18 and parkway View of parkway looking north
September 9, 1936 - 246.
View of parkway, looking north through wooded area. One of the few places where trees meet overhead.
September 9, 1936 - 247.
Valley farm land. This is near but not within sight of the parkway
September 11, 1936 - 248.
View looking south along Ice Rock section of parkway
September 11, 1936 - 249.
Falls in Basin Creek Bluff Park
September 11, 1936 - 250.
View of wide, open area on top of the Bluffs. Looking north
September 11, 1936 - 251.
View looking north along cut through Ice Rock section of Parkway near Bluffs Park area
September 11, 1936 - 252.
View of the Bluffs from Basin Creek Valley near Alligator Back.
September 11, 1936 - 253.
View of falls on Basin Creek
September 11, 1936 - 254.
The Bluffs from point 200 feet from the parkway south of the Bluffs
September 12, 1936 - 255.
Bridge #8 Pier
September 16, 1936 - 256.
Brush Creek Bridge #8, Pier from south
September 16, 1936 - 257.
Brush Creek Bridge #8 Pier
September 16, 1936 - 258.
Roaring Gap Hotel. South wing of hotel
September 18, 1936 - 259.
A view from the hillside opposite of the entrance to Cumberland Knob Park, looking across the Parkway to the park area
October 1936 - 260.
Access Road Construction
October 2, 1936 - 261.
Construction of prop. wall
October 4, 1936 - 262.
Road Grade near NC Route 18
October 4, 1936 - 263.
Back from Station 5
October 4, 1936 - 264.
Proposed Route 18 Crossing
October 4, 1936 - 265.
Mountain Valley and Barn
October 4, 1936 - 266.
Stone Cement Gutter Construction
October 5, 1936 - 267.
#4 Bridge Construction
October 5, 1936 - 268.
Floor and Side Forms of Bridge #8
October 5, 1936 - 269.
Stone Cement Gutter
October 5, 1936 - 270.
Top of #4 Bridge
October 5, 1936 - 271.
Left Wing of Bridge #4
October 5, 1936 - 272.
#3 Bridge Construction
October 5, 1936 - 273.
Stone Cement Gutter
October 5, 1936 - 274.
Construction at Bridge #4
October 5, 1936 - 275.
Wood and Stone Bridge
October 5, 1936 - 276.
View of Bridge 4 Abutment
October 5, 1936 - 277.
Construction on Bridge #8
October 5, 1936 - 278.
Top of #4 Bridge
October 5, 1936 - 279.
Cement Pouring at Bridge #10
October 5, 1936 - 280.
Looking north along parkway showing rock outcropping
October 11, 1936 - 281.
View looking south on parkway
October 12, 1936 - 282.
View looking south from wooded area into open meadow area.
October 12, 1936 - 283.
View looking north along parkway
October 12, 1936 - 284.
View Looking South
October 12, 1936 - 285.
View across parkway looking east into escarpment one-half mile south of Cumberland Knob
October 12, 1936 - 286.
Parkway alignment, looking north
October 12, 1936 - 287.
View looking south along Parkway (Proposed cabin-gas road entrance at far end of cut on left).
October 13, 1936 - 288.
View of alignment looking north near beginning of section
October 13, 1936 - 289.
Simple arch culvert on west side of parkway
October 13, 1936 - 290.
View of culvert
October 13, 1936 - 291.
Gutter under construction
October 13, 1936 - 292.
Rubble gutter treatment at intersection of secondary road
October 13, 1936 - 293.
Detail of rubble gutter - completed
October 13, 1936 - 294.
View of alignment looking north near beginning of the section.
October 13, 1936 - 295.
Detail of rubble gutter and tile underdrain emerging
October 13, 1936 - 296.
Road alignment looking back
October 13, 1936 - 297.
General view of road and gutter
October 13, 1936 - 298.
View looking north on parkway
October 13, 1936 - 299.
Bridge #4 Stone detail on east side (Note scale stick)
October 13, 1936 - 300.
Rubble gutter completed
October 13, 1936 - 301.
View looking south along parkway
October 13, 1936 - 302.
Gutter termination at pipe headwall
October 13, 1936 - 303.
View looking north toward Pine Spur
October 13, 1936 - 304.
Crushed stone base for rubble gutter
October 13, 1936 - 305.
Looking north along parkway one-half mile south of Cumberland Knob Park entrance
October 13, 1936 - 306.
Road alignment through wooded section
October 13, 1936 - 307.
Looking North Along Parkway
October 14, 1936 - 308.
View looking north along Parkway
October 14, 1936 - 309.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 310.
View of Alligator Back from point down the hill on the east side of the parkway
October 20, 1936 - 311.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 312.
Picnic Table
October 21, 1936 - 313.
Fireplace used in picnic area
October 21, 1936 - 314.
300 feet from beginning of the section, view looking north along parkway
October 21, 1936 - 315.
View of left side, looking south, showing detail of stone work
October 22, 1936 - 316.
Bridge #1 View of left side (looking south). Looking down stream
October 22, 1936 - 317.
Near Saddle Mountain church. View of right side of two-arch culvert.
October 22, 1936 - 318.
View of table rock formation in valley to the east of parkway
October 22, 1936 - 319.
Bridge #4 Detail of stone work; view of left side
October 22, 1936 - 320.
Drop Inlet Station 29
October 28, 1936 - 321.
Work Across Intersection from 39-20
October 28, 1936 - 322.
Right Head Wall 289
October 28, 1936 - 323.
Partly Completed Parking
October 28, 1936 - 324.
Work on Culvert
October 28, 1936 - 325.
Cut Ditch and Bank
October 28, 1936 - 326.
Dressed Slopes and Road Intersection
October 29, 1936 - 327.
Bridge #6 Construction
October 29, 1936 - 328.
Bridge #9 Abutment
October 29, 1936 - 329.
Icy Rock Cut (2)
October 31, 1936 - 330.
Left Head Wall 437
October 31, 1936 - 331.
Icy Rock Curve (3)
October 31, 1936 - 332.
Rough Grade Work
October 31, 1936 - 333.
Across Icy Rock Curve
October 31, 1936 - 334.
Icy Rock Curve
October 31, 1936 - 335.
Icy Rock Curve (2)
October 31, 1936 - 336.
Icy Rock Cut
October 31, 1936 - 337.
Icy Rock Cut (3)
October 31, 1936 - 338.
Icy Rock Cut (4)
October 31, 1936 - 339.
Front Head Wall 437
October 31, 1936 - 340.
Right Head Wall 437
October 31, 1936 - 341.
Hare Mill Pond and secondary road
November 10, 1936 - 342.
Hare Mill Pond and road after clean-up
November 10, 1936 - 343.
Parkway at Hare Mill Pond
November 10, 1936 - 344.
View from the Bluff looking west along line of Parkway
November 11, 1936 - 345.
Hand-placed rock embankment
November 11, 1936 - 346.
View on top of the Bluff looking east
November 11, 1936 - 347.
Parkway road and parking area
November 11, 1936 - 348.
Hand-laid rock embankment
November 11, 1936 - 349.
Unmaintained county road parallel to parkway
November 11, 1936 - 350.
View looking south across Ice Rock toward hand-laid rock embankmen
November 11, 1936 - 351.
View of wide, open area on top of the Bluffs, looking north from point near Wild Cat Rocks
November 11, 1936 - 352.
View looking north across Ice Rock area
November 11, 1936 - 353.
Hand-placed rock embankment
November 11, 1936 - 354.
Cut, before grading
November 14, 1936 - 355.
Drop Inlet and Cement Stone Masonry Apron
November 17, 1936 - 356.
Brush Creek Bridge #8
November 19, 1936 - 357.
Close-up of hand-laid rock embankment
November 19, 1936 - 358.
Station 258. Sec 2B Hand-laid rock embankment and rock fill being placed.
November 19, 1936 - 359.
Hand laid rock embankment showing small stone
November 19, 1936 - 360.
Station 258 Sec 2B Hand-laid rock embankment
November 19, 1936 - 361.
View looking across parkway from east side of bridge
November 19, 1936 - 362.
Culvert at upper end of pond mill side.
November 19, 1936 - 363.
Station 258, Sec 2B Rock fill adjacent to hand-laid rock embankment
November 19, 1936 - 364.
Station 258, Sec 2B Rock spilled down mountain side
November 19, 1936 - 365.
Bridge #6 Bridge from east side.
November 19, 1936 - 366.
General view showing machinery making fill through low wet area
November 25, 1936 - 367.
Roadway
December 1, 1936 - 368.
Bridge Frame
December 1, 1936 - 369.
Bridge Construction
December 1, 1936 - 370.
Bridge Construction
December 1, 1936 - 371.
Bridge Construction
December 1, 1936 - 372.
Rounded Roadway
December 1, 1936 - 373.
Bridge Construction
December 1, 1936 - 374.
Arch of Bridge
December 1, 1936 - 375.
Bridge Construction
December 1, 1936 - 376.
Parking Overlook
December 1, 1936 - 377.
Bridge Construction
December 1, 1936 - 378.
Pine Creek Bridge #4
December 1, 1936 - 379.
Bridgeway #2 and Parkway
December 2, 1936 - 380.
Close-up of Bridge #2
December 2, 1936 - 381.
Retaining wall and bridge #2
December 2, 1936 - 382.
Bridge No. 4
December 2, 1936 - 383.
HPRE Face
December 5, 1936 - 384.
Stone Wall
December 5, 1936 - 385.
Wood Pile
December 5, 1936 - 386.
Prepared Road
December 5, 1936 - 387.
Rock Cutting
December 5, 1936 - 388.
Road with Surface Stone
December 5, 1936 - 389.
Through Hills
December 5, 1936 - 390.
Men at HPRE Wall
December 5, 1936 - 391.
Rock Quarry
December 5, 1936 - 392.
Rock and Filling
December 7, 1936 - 393.
Station 386 Bridge #4
December 12, 1936 - 394.
Station 386 Bridge #4
December 12, 1936 - 395.
Road and Parking Area
1937 - 396.
Land Acquisition Maps Section 2-B
1937 - 397.
Building - razed
January 12, 1937 - 398.
Lakes-To-Florida Highway Is Being Improved In Co.
January 21, 1937 - 399.
Early construction
February 2, 1937 - 400.
Route 18 Crossing
February 2, 1937 - 401.
Route 18 Intersection
February 2, 1937 - 402.
Drain Wall
February 2, 1937 - 403.
Winding Road
February 2, 1937 - 404.
Finished Slopes
February 2, 1937 - 405.
Unsurfaced Road
February 2, 1937 - 406.
Men cleaning gutter
February 2, 1937 - 407.
Curved Road
February 2, 1937 - 408.
Intersection Corner
February 2, 1937 - 409.
Cumberland Knob Parking
February 2, 1937 - 410.
Car on Road
February 2, 1937 - 411.
Completed Road
February 2, 1937 - 412.
Cumberland Knob Drive
February 2, 1937 - 413.
Bridge Arch
February 3, 1937 - 414.
Rock embankment and stream
February 4, 1937 - 415.
Bridge #9 construction
February 4, 1937 - 416.
Construction materials
February 4, 1937 - 417.
Bridge Construction
February 4, 1937 - 418.
Bridge #8
February 4, 1937 - 419.
Bridge Abutment
February 4, 1937 - 420.
Rock embankment and culvert
February 4, 1937 - 421.
Bridge Construction
February 4, 1937 - 422.
Bridge at site #7 Steel construction
March 29, 1937 - 423.
East parapet wall south abutment
March 29, 1937 - 424.
Bridge at site #7 Steel construction, looking back from south abutment
March 29, 1937 - 425.
Bridge at site #7, Steel stringers
March 29, 1937 - 426.
North abutment and stringers
March 29, 1937 - 427.
Bridge at Site #7, Steel Construction
March 29, 1937 - 428.
Cutting for telephone line on right-of-way line
March 30, 1937 - 429.
Culvert headwall
April 1, 1937 - 430.
Riveters working
April 6, 1937 - 431.
Underside of bridge
April 6, 1937 - 432.
Unfinished road and bridge
April 10, 1937 - 433.
View of road
April 10, 1937 - 434.
Detail of expansion dam
April 10, 1937 - 435.
Rail details
April 10, 1937 - 436.
Rail construction
April 10, 1937 - 437.
Landscape North to Bridge #6
April 10, 1937 - 438.
Detail Pier #2
April 10, 1937 - 439.
View of road
April 10, 1937 - 440.
View of bridge #4
April 10, 1937 - 441.
Bridge Construction
April 10, 1937 - 442.
Detail of expansion dam
April 10, 1937 - 443.
Bridge #6
April 10, 1937 - 444.
View of bridge
April 10, 1937 - 445.
Landscape at Sections 2A and 2B
April 12, 1937 - 446.
Left End of Bridge #9
April 12, 1937 - 447.
Bridge #8
April 12, 1937 - 448.
View near Junction of 2A/2B
April 12, 1937 - 449.
View near Junction of 2A/2B
April 12, 1937 - 450.
Bridge Rock Detail
April 12, 1937 - 451.
Bridge #10 and Stream
April 12, 1937 - 452.
View of Junction of 2A and 2B
April 12, 1937 - 453.
Road fill along edge of rough road
April 13, 1937 - 454.
South End of Quarry
April 14, 1937 - 455.
Sharp Curve Construction
April 14, 1937 - 456.
Preparing Sub-Grade
April 14, 1937 - 457.
Loading Holes for Blasting
April 14, 1937 - 458.
Rough Grade Rock Fill
April 14, 1937 - 459.
Trail down Belle Ridge
April 22, 1937 - 460.
Fire hazard reduction along trail. Belle Ridge
April 22, 1937 - 461.
Station 563 No 8 Bridge cost $34,053
May 4, 1937 - 462.
No.6 bridge, cost $15,139
May 4, 1937 - 463.
#9 Bridge, Down Stream, Cost $20,120
May 4, 1937 - 464.
Looking back over bridge #5
May 4, 1937 - 465.
Guard rail, No.7 bridge
May 4, 1937 - 466.
No. 5 Bridge, cost $17,520
May 4, 1937 - 467.
No.4 Arch Bridge, cost $12,000
May 4, 1937 - 468.
No. 5 Bridge, Cost $17,520, Pine Creek Bridge #5
May 4, 1937 - 469.
Cumberland Knob Park Picnic Road
May 7, 1937 - 470.
Mailbox on parkway
May 18, 1937 - 471.
Underside of Viaduct
May 18, 1937 - 472.
Bridge #7 approximate cost $45,000
May 18, 1937 - 473.
Bridge #5 42' span cost $17,520
May 18, 1937 - 474.
Bridge no. 9, cost $20,120 24' span
May 18, 1937 - 475.
Bridge #7, approximate cost $45,000
May 18, 1937 - 476.
Bridge #7, guard rail and pier detail
May 18, 1937 - 477.
Bridge #4
May 18, 1937 - 478.
Bridge No. 3, 57' Span, Cost $19,462
May 18, 1937 - 479.
Bridge No.2 49'10" span, cost $11,894
May 18, 1937 - 480.
Hand Placed Rock
May 20, 1937 - 481.
Pine Creek Bridge #3
May 25, 1937 - 482.
Completed Bridge #8
May 25, 1937 - 483.
Bridge #2
May 25, 1937 - 484.
Pine Creek Bridge #7
May 25, 1937 - 485.
Arch of Bridge #9
May 25, 1937 - 486.
Cars crossing Pine Creek Bridge #7
May 25, 1937 - 487.
Pine Creek Bridge #5
May 25, 1937 - 488.
Bridge #10
May 25, 1937 - 489.
Pine Creek Bridge #6
May 25, 1937 - 490.
Pine Creek Bridge #4
May 25, 1937 - 491.
Bridge #9
May 25, 1937 - 492.
Drilling and Construction
May 26, 1937 - 493.
Icy Rock Curve
May 26, 1937 - 494.
Wagon Drills
May 26, 1937 - 495.
Road Construction
May 26, 1937 - 496.
Hand Placed Rock embankment
May 26, 1937 - 497.
Mountainside of timber to be cut by A. V. Millsap
June 1, 1937 - 498.
Parkway box culvert
June 1, 1937 - 499.
Old state box culvert to be removed
June 1, 1937 - 500.
Mountainside of timber to be cut by A.V. Millsap
June 1, 1937 - 501.
Rough headwall
June 8, 1937 - 502.
Mountain Laurel
June 14, 1937 - 503.
Mountain laurel in bloom by parkway
June 14, 1937 - 504.
Special drainage structure
June 22, 1937 - 505.
Special drainage structure
June 22, 1937 - 506.
Drilling and cleaning for stone wall at 255-35
July 28, 1937 - 507.
Cement Stone Gutter
July 28, 1937 - 508.
Dumping of Construction Material for replacing embankment
July 28, 1937 - 509.
Head wall and Stone Cement Channel
July 28, 1937 - 510.
Stone steps joining gutter
July 28, 1937 - 511.
Cement Stone Gutter Along Rock Bank
July 28, 1937 - 512.
Preparations for Cement Wall
July 28, 1937 - 513.
Ice Rock Wall
August 18, 1937 - 514.
Saddle Mountain Valley. Lake site, looking up at valley, woods opposite
August 20, 1937 - 515.
Saddle Mountain Valley, Lake Site from station 277
August 20, 1937 - 516.
Saddle Mountain Valley, Lake Site
August 20, 1937 - 517.
Unknown variety of plant 6 - 7' high, yellow flowers in bloom
August 20, 1937 - 518.
Cumberland Knob Shelter Bldg #89
September 1937 - 519.
View of road
September 3, 1937 - 520.
Road Construction at Station 32
September 4, 1937 - 521.
Retaining Wall along Icy Rock
September 4, 1937 - 522.
Road Construction at Station 201-55
September 4, 1937 - 523.
Retaining Wall and unfinished slope of Icy Rock
September 4, 1937 - 524.
Stone masonry retaining wall
September 4, 1937 - 525.
Stone and iron culvert
September 4, 1937 - 526.
Gutter Work along Rock Face
September 4, 1937 - 527.
Icy Rock Retaining Wall with Crane
September 4, 1937 - 528.
Construction of Gutter at Inlet Towards Station 28
September 4, 1937 - 529.
Construction of Gutter at Station 108-60
September 4, 1937 - 530.
Culvert Cement Stone Gutter at Station 122-30
September 4, 1937 - 531.
Icy Rock Curve
September 4, 1937 - 532.
Air Bellows Gap Underpass
September 21, 1937 - 533.
West wingwall Air Bellows Gap Underpass
September 23, 1937 - 534.
Fireplace in shelter on top of Cumberland Knob
October 1937 - 535.
Takeoff to campground area before construction
October 8, 1937 - 536.
Saddle in campground area looking west before construction
October 8, 1937 - 537.
Rough Grade Road
October 10, 1937 - 538.
Road through Cut
October 10, 1937 - 539.
Cement stone gutter
October 10, 1937 - 540.
Road and Bridge with Guard Stakes
October 10, 1937 - 541.
Winding Road
October 11, 1937 - 542.
Stone culvert head wall
October 11, 1937 - 543.
Gutter Construction
October 11, 1937 - 544.
Water Channel
October 11, 1937 - 545.
Access Road to Route 18
October 11, 1937 - 546.
Paving Gutters
October 11, 1937 - 547.
View of road
October 11, 1937 - 548.
Stone Hillside Work
October 11, 1937 - 549.
View of road
October 11, 1937 - 550.
Stone Gutter
October 11, 1937 - 551.
Automobile on road
October 11, 1937 - 552.
Dirt Road
October 11, 1937 - 553.
Surfaced Road
October 11, 1937 - 554.
Early Construction
October 11, 1937 - 555.
Rock Embankment
October 11, 1937 - 556.
View of road
October 12, 1937 - 557.
Dressed Road
October 12, 1937 - 558.
Man and a Horse Team
October 12, 1937 - 559.
Unfinished Construction
October 12, 1937 - 560.
Team of Horses
October 12, 1937 - 561.
Bull Head Mountain and Parkway
October 13, 1937 - 562.
Rock Cut - Devil's Garden
October 13, 1937 - 563.
Parkway just north of Air Bellows Gap
October 13, 1937 - 564.
Looking across Bluff Park toward Little Grandfather Mountain
October 13, 1937 - 565.
Looking through rock cut towards Ice Rock and Bluff
October 13, 1937 - 566.
Parkway alignment, Meadow Fork Valley
October 15, 1937 - 567.
Alligator Back
October 15, 1937 - 568.
On top of Bluff. Parkway and Little Grandfather Mt.
October 15, 1937 - 569.
Alligator Back and Meadow Fork Valley
October 15, 1937 - 570.
Parkway and Meadow Fork Valley from Bluff
October 15, 1937 - 571.
Back side of shelter
October 15, 1937 - 572.
Looking back at Alligator Back
October 15, 1937 - 573.
Alligator Back and Meadow Fork Valley
October 15, 1937 - 574.
Road to Lodge (under construction)
November 1937 - 575.
Ice Formations
November 1937 - 576.
Ice Formations
November 1937 - 577.
Ice formations
November 1937 - 578.
Ice formations
November 1937 - 579.
Ice formations
November 1937 - 580.
Ice Formations
November 1937 - 581.
Ice Formations
November 1937 - 582.
Road to Lodge (under construction)
November 1937 - 583.
Ice Rock
November 20, 1937 - 584.
Ice Rock Channel and Drainage
November 20, 1937 - 585.
Typical section in snow
November 20, 1937 - 586.
Ice Rock
November 20, 1937 - 587.
Surfaced Road
November 20, 1937 - 588.
Icy Road
November 20, 1937 - 589.
Ice Rock
November 20, 1937 - 590.
Roadway near Ice Rock
November 20, 1937 - 591.
Fill
November 20, 1937 - 592.
Parkway toward the Bluff
November 20, 1937 - 593.
Road Routes
November 22, 1937 - 594.
NP 21 before planting
1938 - 595.
Land Acquisition Maps Section 2-A
1938 - 596.
Rock cut at Devil's Garden
1938 - 597.
Shoulder construction, High Piney Ridge in background
1938 - 598.
Shoulder construction, High Piney Ridge in background
1938 - 599.
L.F. Caudill
1938 - 600.
Land Acquisition Maps Section 2-C
1938 - 601.
Cumberland Park Pump House
January 5, 1938 - 602.
Cumberland Knob Slope flattening at entrance
January 24, 1938 - 603.
Mahogany Rock Parking Overlook after grading
January 24, 1938 - 604.
Sheep Hill Brand Lodge Site and proposed water storage
March 1938 - 605.
Wildcat Rock and Lodge Parking area (proposed)
March 1938 - 606.
Spillage (smaller rock above) from excavation for north abutment of viaduct
March 8, 1938 - 607.
Road on Top of Hills
March 12, 1938 - 608.
Road construction to picnic area
March 12, 1938 - 609.
Picnic Table
March 12, 1938 - 610.
Bridge - Grassy Gap Road
March 12, 1938 - 611.
View of road
March 12, 1938 - 612.
The Bluff Crusher and Parkway
March 12, 1938 - 613.
Picnic Table
March 12, 1938 - 614.
Bridge - Grassy Gap Road
March 12, 1938 - 615.
Picnic Shelter Blueprints
April 11, 1938 - 616.
Devil's Garden Parking and Overlook after Grading
April 21, 1938 - 617.
Taken to show log corner detail -- underexposed
April 21, 1938 - 618.
Barn proposed for acquisition. Note logs and shake roof.
April 21, 1938 - 619.
Front of barn as it would be seen from the parkway.
April 21, 1938 - 620.
Looking West from One of the Parking Areas South of Cumberland Knob
April 27, 1938 - 621.
Shelter on Top of Cumberland Knob
April 27, 1938 - 622.
Forest Clearing
May 11, 1938 - 623.
CCC Camp just moving in
June 1938 - 624.
60ft cut at Devils Garden
June 14, 1938 - 625.
Big Cut at Devil's Garden
June 14, 1938 - 626.
Grade separation, south elevation
July 1938 - 627.
Water Fountain
July 1938 - 628.
Signs near parking area
July 1, 1938 - 629.
Grade separation Class B masonry and concrete barrel
July 1, 1938 - 630.
Face of Wall in Woods
July 11, 1938 - 631.
Dam site and watershed
July 11, 1938 - 632.
Inside of wall parking area
July 11, 1938 - 633.
Return Cabin Loop to Camping Loop
July 11, 1938 - 634.
Retaining Wall Picnic Area
July 12, 1938 - 635.
West Abutment, Overpass US 21
July 12, 1938 - 636.
Bluff Park from lodge site
July 12, 1938 - 637.
Slope on Parkway
July 16, 1938 - 638.
Before grading. Cleared to connect slope line, with rock as excuse for steep slope. Ugly profile.
July 25, 1938 - 639.
Before grading. A 3/4 to 1 slope with almost vertical overhang of soft rock
July 25, 1938 - 640.
Before grading. Rotten rock 1:1; ditch too narrow ugly profile.
July 25, 1938 - 641.
Before grading. Cave-in on 1:1 slope. Will continue to slide unless flattened. Needs rounding.
July 25, 1938 - 642.
Before grading. Steep, rotten rock cuts, shoulder and ditch. 2 ft short
July 25, 1938 - 643.
Unpaved roadway with erosion
July 25, 1938 - 644.
Before grading. Tape used to show concave slope. Needs transition, overhand and wide rounding
July 25, 1938 - 645.
Washout at headwall. Shows need of different type of structure.
August 1, 1938 - 646.
Construction Unit Water Storage North End of Dam
September 28, 1938 - 647.
Clearing for Water Supply Reservoir
September 28, 1938 - 648.
Entrance road to lodge site
September 28, 1938 - 649.
Water Storage Tank, Cabin Area
September 28, 1938 - 650.
Cut before grading
October 2, 1938 - 651.
Northwest elevation showing grading.
October 3, 1938 - 652.
Fill before grading
October 4, 1938 - 653.
Cut before grading
October 4, 1938 - 654.
Fill Before Grading
October 6, 1938 - 655.
Before grading operation and clean-up, looking north
October 18, 1938 - 656.
Expansion joints at junction of spandrel and wing walls
October 18, 1938 - 657.
Spandrel Wall - Rubble wing wall and concrete vault
October 18, 1938 - 658.
Cut before grading
October 21, 1938 - 659.
Cut before grading
October 21, 1938 - 660.
Cut before grading
October 21, 1938 - 661.
Cut before grading
October 21, 1938 - 662.
Fill, before grading
November 7, 1938 - 663.
Fill, before grading
November 7, 1938 - 664.
Cut, before grading
November 11, 1938 - 665.
Cut before grading, looking back
November 22, 1938 - 666.
Cut before grading, looking back
November 22, 1938 - 667.
Cut before grading, looking back
November 22, 1938 - 668.
Before grading
December 1938 - 669.
Before grading
December 1938 - 670.
Before grading
December 1938 - 671.
Before grading
December 1938 - 672.
Before Grading
December 1938 - 673.
Before grading. Looking back across Hare Mill Pond
December 15, 1938 - 674.
High cuts thru wooded area. During selective cutting.
December 15, 1938 - 675.
Shoulder construction, High Piney Ridge in background
1938 - 676.
Radio tower installation
1939 - 677.
Fire Hazard Map
1939 - 678.
Shoulder construction, High Piney Ridge in background
1938 - 679.
Radio tower installation
1939 - 680.
From north end of Ice Rock
January 2, 1939 - 681.
Gorge below Parkway From south end of Ice Rock
January 2, 1939 - 682.
From south end of Ice Rock
January 2, 1939 - 683.
#4 Arch bridge Masonry detail
January 10, 1939 - 684.
Hand Rail
January 1, 1939 - 685.
Close-up of masonry detail
January 10, 1939 - 686.
Masonry detail
January 10, 1939 - 687.
Overpass: Inside View of Parapet Wall
January 1, 1939 - 688.
Masonry Detail
January 10, 1939 - 689.
#4 Arch Bridge, Masonry Detail
January 10, 1939 - 690.
Masonry Detail
January 10, 1939 - 691.
South face
January 10, 1939 - 692.
Finishing first section of dam
January 11, 1939 - 693.
Trail near Dam
January 14, 1939 - 694.
North end of ice rock
January 16, 1939 - 695.
Old barn on left, to be removed
January 18, 1939 - 696.
Barn - dwelling removed
January 18, 1939 - 697.
Sheds (Torn down by BLRI 2/1/39)
January 18, 1939 - 698.
Construction road to stable site
March 25, 1939 - 699.
Pouring Concrete
March 25, 1939 - 700.
Richardson Property between Richardson and Osborne Houses
March 30, 1939 - 701.
Cleary, Osbourne and Richardson Property Below Cleary property
March 30, 1939 - 702.
Osbourne and Richardson Property. West of House
March 30, 1939 - 703.
Osbourne and Cleary Property, East of House
March 30, 1939 - 704.
Cove Creek
April 1939 - 705.
Cove Creek
April 1939 - 706.
Cove Creek Watershed
April 1939 - 707.
Cascades on Cove Creek
April 1939 - 708.
Overpass US 21 and Access Drive
May 19, 1939 - 709.
Overpass US 21
May 19, 1939 - 710.
Top of Overpass US 21
May 19, 1939 - 711.
Overpass US 21
May 19, 1939 - 712.
Wildcat Rocks overlook view on top where flagging is proposed
July 20, 1939 - 713.
Wildcat Rocks Overlook showing location of proposed paved overlook
July 20, 1939 - 714.
Wildcat Rocks overlook view on top where flagging is proposed
July 20, 1939 - 715.
Wildcat Rocks Overlook
July 20, 1939 - 716.
Sixty-Mile Stretch of Parkway is Open
July 23, 1939 - 717.
Undercutting Fill Slopes for Stream Relocation
August 1939 - 718.
Stream undermining Abutment from upstream
August 1, 1939 - 719.
Landscape
September 6, 1939 - 720.
View of road
September 6, 1939 - 721.
Overpass Structure 2D-4 SW Wing Wall
September 9, 1938 - 722.
Earth and Rock cut before L.D. grading
October 6, 1939 - 723.
Cuts before L.D. grading
October 6, 1939 - 724.
Earth and Rock cut before L.D. grading
October 6, 1939 - 725.
Wildcat Overlook from Below
October 26, 1939 - 726.
After Planting
October 26, 1939 - 727.
Water tank on Wild Cat rocks
October 26, 1939 - 728.
Up Stream Face of Dam
October 26, 1939 - 729.
Parkway through Meadow Fork Valley
October 26, 1939 - 730.
Dam for Water Reservoir
October 26, 1939 - 731.
After grading and planting
October 26, 1939 - 732.
Guard wall at Wildcat Overlook
October 26, 1939 - 733.
Pump house site and dam
October 26, 1939 - 734.
After L. D. grading
October 26, 1939 - 735.
After L.D. Grading
October 26, 1939 - 736.
After L. D. grading and planting.
October 26, 1939 - 737.
Curb and culvert detail on island for gasoline station
October 26, 1939 - 738.
Wild Cat Overlook from Below
October 26, 1939 - 739.
After L.D. Grading
October 26, 1939 - 740.
Lodge entrance road take-off
October 26, 1939 - 741.
Repair Garage and Blacksmith Shop, CCC job 535
November 1939 - 742.
Foundation - Equipment storage and office building CCC job 142
November 1939 - 743.
Flagstone Overlook Job #146
November 1939 - 744.
Water Storage Tank CCC Job 530
November 1939 - 745.
Water Storage Tank CCC Job 530
November 1939 - 746.
Repair garage and black-smith shop CCC job 532
November 1939 - 747.
Daylight
November 7, 1939 - 748.
View Looking North on Parkway
1940 - 749.
Bluff Gas Station
1940s - 750.
Fishers Peak from Outer Parking area at Fox Hunters Paradise
1940 - 751.
Drinking fountain in picnic area #3
1940 - 752.
Sign and entrance road for Wild Cat Rock
1940 - 753.
Drinking fountain and horse trough in camping area
1940 - 754.
Equipment storage bldg #110
1940s - 755.
Watershed
1940 - 756.
Comfort Station (Bluff Campground)
1940s - 757.
CCC Co. 3420 Laurel Springs, NC Doughton Park
1940s - 758.
Bulletin Board Loud speaker CCC Co. 3420 Laurel Springs, NC Doughton Park
1940s - 759.
Parkway, Section 2B
1940s - 760.
Comfort Station and Trail Shelter, Picnic Area #3
1940 - 761.
Entrance to Park showing sign and crate structure
1940 - 762.
Stone Mountain, N.C. from Parkway
1940s - 763.
Incinerator Temperature cracks
1940s - 764.
Alligator Rock
1940s - 765.
Water Tank on Wild Cat Rock
1940 - 766.
Holiday, Cumberland Knob
1940s - 767.
Parking at Cumberland Knob
1940s - 768.
Near Grassy Gap, Doughton Park
1940s - 769.
Trail shelter
1940s - 770.
Trail shelter
1940s - 771.
Overlook in Bluff area looking south
1940 - 772.
View looking south on Parkway Showing bridge #6
1940 - 773.
Parking at Cumberland Knob
1940s - 774.
Sparta, N.C. in Upper Middle of Photo
1940s - 775.
CCC Leisure Time
1940s - 776.
Scene near Devil's Garden, Blue Ridge Parkway
1940s - 777.
View Looking South on Parkway
1940 - 778.
Trail Shelter
1940s - 779.
ERA work station (site of gas station and coffee shop)
1940 - 780.
Sign in Bluff Park looking south
1940 - 781.
Entrance to Bluff Park looking northeast
1940 - 782.
Entrance to Picnic area #1
1940 - 783.
Big Piney Creek Bridge #6
1940 - 784.
Incinerator -temperature cracks
1940s - 785.
Incinerator Temperature cracks
1940s - 786.
Grade Separation Structure Over US 21 Looking East
1940 - 787.
Big Piney Creek Bridge #6, Pine Creek Bridge #6
1940 - 788.
Incinerator Temperature cracks
1940s - 789.
Comfort Station Trail Shelter
1940 - 790.
CCC Co. 3420
1940s - 791.
Rock slide Bluff Park Heavy maintenance
1940s - 792.
Enrollee Wiley Hines
1940s - 793.
CCC Duck Pond & Messhall?
1940s - 794.
CCC Ducks/pond with camp headquarters in background
1940s - 795.
CCC Ed Carico Foreman?
1940s - 796.
CCC Enrollee Arthur Phillips
1940 - 797.
CCC enrollee Bert Richardson
1940s - 798.
View looking North on parkway
1940 - 799.
Lightning struck sign
1940 - 800.
CCC enrollee Bert Richardson & camp bulletin board
1940s - 801.
Lightning struck sign
1940 - 802.
Overlook Shelter
1940 - 803.
CCC Enrollee Bert Richardson Recroding Weather
1940 - 804.
CCC enrollee Dale Shepherd
1940s - 805.
CCC enrollee Lonnie McMillian
1940s - 806.
Bluff Park Area looking west
1940 - 807.
Paul Carico, heavy equip. operator
1940s - 808.
Pete Collenicu Adm. Ass. now with Lowe's N. Wilksboro, NC
1940s - 809.
CCC enrollee Robert Wagoner
1940s - 810.
View looking north on Parkway
1940 - 811.
Grade Separation Structure Over US 21 Looking Northwest
1940 - 812.
Scene in picnic area #3
1940 - 813.
Drinking Fountain
1940 - 814.
The Bluffs & Road Alignment thru the Bluffs
1940s - 815.
Caudill Cabin
1940s - 816.
Fence Repair
1940s - 817.
Bluff Park looking south
1940 - 818.
Trail shelter
1940s - 819.
Bridge and Car
1940s - 820.
Shed at Brinegar Cabin c.1885 Bldg #162
1940s - 821.
Parkway Bridge near Bull Head Mountain
1940s - 822.
Incinerator Temperature cracks
1940s - 823.
Caudill Cabin
1940s - 824.
Caudill Cabin
1940s - 825.
CCC Bulldozer and Truck
1940 - 826.
CCC Bulldozer and Truck
1940 - 827.
Drinking Fountain
1940 - 828.
Walk to Wildcat Rock's
1940s - 829.
CCC enrollees water tank Wildcat Rocks
1940s - 830.
Brinegar cabin Bldg# 96
1940 - 831.
Caudill Cabin
1940s - 832.
Cabin
1940s - 833.
View CCC Co. 3420 Laurel Springs, NC Doughton Park
1940s - 834.
Trailer Loop
1940 - 835.
Looking East from Entrance Road
1940 - 836.
View of CCC Co. 3420, Laurel Springs, N.C. Doughton Park
1940s - 837.
View looking south on Parkway
1940 - 838.
CCC camp's weather station
1940s - 839.
Gas Station Bldg 105
1940s - 840.
Overlook at Wild Cat Rock
1940 - 841.
Layout plan for lodge Bluff Park
1940s - 842.
Scenic View of Parkway, Section 2C
1940s - 843.
Overlook Shelter
1940 - 844.
Comfort Station Area 3#
1940 - 845.
Pky. at Air Bellows Gap
1940s - 846.
Parkway at Air Bellow Gap
1940s - 847.
Pky. at Air Bellows Gap
1940s - 848.
Parkway along Meadow Fork near Doughton Park
1940s - 849.
Caudill Cabin
1940s - 850.
View of Parkway
1940 - 851.
Trail Shelter
1940 - 852.
Radio tower and house
1940 - 853.
Entrance to Park
1940 - 854.
Radio tower and house
1940 - 855.
Caudill Cabin
1940s - 856.
Campground loop after ice storm
1940 - 857.
Bluff Coffee Shop and Gas Station
1940s - 858.
Viaduct Bridge #7
1940 - 859.
Parkway near Grassy Gap
1940s - 860.
Pky. at Air Bellows Gap
1940s - 861.
View from Fox Hunters Paradise in Cumberland Knob Area
1940s - 862.
Caudill Cabin
1940s - 863.
Trail Shelter
1940s - 864.
Equipment office showing oil house
1940 - 865.
Fireplace picnic area #3.
1940 - 866.
Picnic area #3
1940 - 867.
Comfort Station Cumberland Knob
1940 - 868.
Scene from the Bluff trail looking west
1940 - 869.
Gas and oil house Bldg #111
1940s - 870.
Alfred Gates, Mech. + Woodsaw
1940s - 871.
CCC enrollee Wayne Roberts
1940s - 872.
CCC enrollees Bert Richardson Robert Wagoner
1940s - 873.
CCC enrollees Dale Shepherd Hoke Francis Travis Owens Glenn Philips
1940s - 874.
CCC enrollees Dale Shepherd (L) ? Travis Owens (Ctr R.) Arthur Phipps (R)
1940s - 875.
CCC enrollees Robert Whittcare Lonnie McMillian Wayne Roberts
1940s - 876.
CCC enrollees Sam Lowe Bert Richardson L->R
1940s - 877.
CCC Enrollees Sam Lowe Bill Pruitt Earl Hasley [L->R]
1940s - 878.
CCC enrollees Travis Owens Hore Francis Wayne Roberts [L->R]
1940s - 879.
CCC Group near Truck Shelter
1940 - 880.
CCC Group near Truck Shelter
1940 - 881.
CCC H.D. Trent & Heavy equip.
1940s - 882.
CCC Lt. Land? Lt. Raymond Kinno Edu. Adv.
1940s - 883.
Drive in Picnic Area
1940 - 884.
Looking south on Parkway
1940 - 885.
Wild Cat Rock
1940 - 886.
Brinegar Shed
1940s - 887.
Radio tower and house
1940 - 888.
Construction of Combination Building, comfort station, picnic shelter, and refractory
1940 - 889.
Incinerator retaining wall construction
1940s - 890.
Scene from the Bluff Trail
1940 - 891.
View looking north on Parkway showing bridge at Sta 125+00
1940 - 892.
CCC Park Service Personnel Quarters, NP Camp 21
1940 - 893.
CCC Park Service Personnel Quarters, NP Camp 21
1940 - 894.
View looking North on Parkway
1940 - 895.
CCC Ralph Ayers [Dynamite Guard]
1940s - 896.
Overlook Shelter
1940 - 897.
CCC Tom Isbell - shop (woodwork) foreman
1940s - 898.
CCC Travis Owens Arthur Phipps Glenn Phillips Ralph Ayers
1940s - 899.
Bluff Park looking east
1940 - 900.
CCC Sam Lowe
1940s - 901.
763-B Comfort station & trail shelter picnic area #3, Bluff Park, sec. 2-C
1940 - 902.
Radio Tower and House
1940 - 903.
Trailer area after ice storm
1940 - 904.
Picnic Area #3 After Ice Storm
1940 - 905.
Pedestrian Overlook at Fox Hunters Paradise
1940 - 906.
View looking south on parkway
1940 - 907.
Pky. at Air Bellows Gap
1940s - 908.
Azalea Bloom
1940 - 909.
Cabin Group
1940 - 910.
Site of comfort station Picnic area #1
1940 - 911.
Incinerator Construction progress
1940s - 912.
Shrub covered by ice
March 14, 1940 - 913.
One way sign covered with ice
March 14, 1940 - 914.
Broken Pavement Sign
March 15, 1940 - 915.
Cattle belonging to Mrs. C.H. Wright committing trespass
March 17, 1940 - 916.
Mile post for park areas
June 2, 1940 - 917.
Comfort Station Picnic Shelter
July 2, 1940 - 918.
Log cabin, one room and loft
July 17, 1940 - 919.
Log Cabin, one room and loft
July 17, 1940 - 920.
Brinegar Cabin Bldg# 96 Window Detail
July 17, 1940 - 921.
Brinegar Cabin Bldg #96
July 17, 1940 - 922.
Flood Damage
August 17, 1940 - 923.
Road which was carried away by the rains and slide of Aug 13, 1940
August 17, 1940 - 924.
Flood damage, Debris washed into lower valleys.
August 17, 1940 - 925.
Flood Damage
August 17, 1940 - 926.
Flood Damage
August 17, 1940 - 927.
Flood Damage
August 17, 1940 - 928.
Flood Damage
August 16, 1940 - 929.
Cumberland Knob Guard Wall
November 18, 1940 - 930.
Cumberland Knob Guard Wall
November 18, 1940 - 931.
CCC Group near Truck Shelter
1940 - 932.
Completed Comfort Station and Trail Shelter
1941 - 933.
CCC Bulldozer and Truck
1940 - 934.
Office and tool storage building and radio tower
1941 - 935.
Park warden's pick-up showing fire tools
1941 - 936.
Park Wardens pick-up
1941 - 937.
CCC Group near Truck Shelter
1940 - 938.
CCC Park Service Personnel Quarters, NP Camp 21
1940 - 939.
CCC Park Service Personnel Quarters, NP Camp 21
1940 - 940.
Radio sub-station and tower
1941 - 941.
Seeding and staked mulch (in Bluff Park)
1941 - 942.
Seeding and staked mulch (in Bluff Park)
1941 - 943.
Road and Parking Area - Brinegar Cabin
1941 - 944.
Blacksmith and Repair Garage (construction)
1941 - 945.
Bluff Park Blacksmith and Repair Garage
1941 - 946.
Office and Tool Storage Building (construction)
1941 - 947.
Office and Tool Storage Building
1941 - 948.
Comfort station Trailer are
1941 - 949.
Fire Presuppression Unit in Camping and Picnic Areas
1941 - 950.
Fire Tool Box
1941 - 951.
Hose pack for Pacific Marina Pump
1941 - 952.
Hose pack in use
1941 - 953.
Sign Types and Location
1941 - 954.
CCC Bulldozer and Truck
1940 - 955.
Wall Construction
April 10, 1941 - 956.
Parkway Wall
April 10, 1941 - 957.
Completed Parkway Wall
April 10, 1941 - 958.
Gray Fox Cub
May 1941 - 959.
Gray Fox Cub
May 1941 - 960.
Guard Wall
May 22, 1941 - 961.
Guard Wall Stones
May 22, 1941 - 962.
Guard Wall
May 22, 1941 - 963.
Alligator Back Sheet erosion control (after)
July 26, 1941 - 964.
Sheet erosion control (after)
July 26, 1941 - 965.
Guard wall (sample section)
August 1941 - 966.
Guard wall (sample section) To show alignment on coping
August 1941 - 967.
Guard wall (sample sec.) Show Parkway elevation of wall
August 1941 - 968.
Guard wall (sample sec.) Show rear elevation of wall and rear batter.
August 1941 - 969.
Guard Wall (sample section) to show alignment on coping
August 1941 - 970.
Martin Brinegar Cabin
September 1941 - 971.
Martin Brinegar Cabin
September 1, 1941 - 972.
Parkway Meadowfork Valley
September 22, 1941 - 973.
Parkway Meadowfork Valley Showing streamside location
September 22, 1941 - 974.
Meadow Fork Overpass
September 22, 1941 - 975.
Parkway - Meadowfork Valley
September 22, 1941 - 976.
Parkway - Meadowfork Valley
September 22, 1941 - 977.
Incinerator Construction
October 1941 - 978.
Incinerator Construction
October 1941 - 979.
Incinerator Construction
October 1941 - 980.
Incinerator Construction
October 1941 - 981.
Brinegar Cabin Interior, fireplace detail
November 1941 - 982.
Brinegar Cabin east elevation
November 1941 - 983.
Brinegar Cabin South elevation - storehouse
November 1941 - 984.
Brinegar Cabin, Front Elevation
November 1941 - 985.
Brinegar cabin east elevation - storehouse footing detail
November 1941 - 986.
Brinegar cabin east elevation footing detail
November 1941 - 987.
Brinegar Cabin before restoration
November 1941 - 988.
Brinegar cabin east elevation footing detail
November 1941 - 989.
Brinegar cabin west elevation footing detail
November 1941 - 990.
Brinegar cabin west elevation footing detail
November 1941 - 991.
Brinegar Cabin, Rear Elevation Details
November 1941 - 992.
Brinegar Cabin, Interior - North Sill Replaced
November 1941 - 993.
Brinegar Cabin, Interior - North Sill Replaced
November 1941 - 994.
Incinerator, door details
November 1941 - 995.
Incinerator Ratchet door
November 1941 - 996.
Brinegar Cabin Hewing log for north sill WPA labor
November 1941 - 997.
Brinegar cabin, east elevation chimney detail
November 1941 - 998.
Incinerator Construction progress
November 1941 - 999.
Brinegar cabin, Bluff Park East elevation chimney detail
November 1941 - 1000.
Incinerator Construction progress
November 1941 - 1001.
Brinegar ?Cabin Hewing north sill
November 1941 - 1002.
Brinegar cabin east elevation footing detail
November 1941 - 1003.
Brinegan cabin East elevation - storehouse
November 1941 - 1004.
Brinegar Cabin west elevation footing detail
November 1941 - 1005.
Brinegar Cabin, Bluff Park, East elevation chimney detail
November 1941 - 1006.
Brinegar Cabin timber wall and exposed window details
December 1941 - 1007.
Brinegar Cabin Framing Detail, Lean-to
December 1941 - 1008.
Brinegar Cabin Lean-to exposed West elevation
December 1941 - 1009.
Brinegar Cabin window detail on west wall
December 1941 - 1010.
Brinegar Cabin Southwest Corner
December 1941 - 1011.
Brinegar Cabin Southwest Elevation lean-to framing
December 1941 - 1012.
Brinegar Cabin Lean-to framing exposed
December 1941 - 1013.
Brinegar Cabin, Window Detail on West Wall
December 1941 - 1014.
Brinegar Cabin Old roof Northeast corner
December 1941 - 1015.
Brinegar Cabin - Parking Area Retaining wall - inside
December 1941 - 1016.
Brinegar Cabin, Timber Walls Exposed and Window Detail
December 1941 - 1017.
Brinegar Cabin Framing Detail, Lean-to
December 1941 - 1018.
Brinegar Cabin Parking area Retaining wall outside
December 1941 - 1019.
Cumberland Knob
1942 - 1020.
Brinegar Cabin, Spring House, Spring Retaining Wall
January 1942 - 1021.
Brinegar cabin - parking area Entrance road from Parkway
January 1942 - 1022.
Spring House Brinegar Cabin Bldg #163
1942 - 1023.
Little Glade Pond Development Plan
1942 - 1024.
Brinegar cabin Spring house Framing details
January 1942 - 1025.
Brinegar cabin Spring house reframing details
January 1942 - 1026.
Brinegar Cabin Parking Area and Entrance Road from the Parkway
January 1942 - 1027.
Brinegar Cabin Spring House existing structure
January 1942 - 1028.
Brinegar Cabin Parking Area
January 1942 - 1029.
Brinegar Cabin. Spring House Existing Structure
January 1942 - 1030.
Stable - Two Horses, Construction Details
January 1942 - 1031.
Stable - Two Horses, Construction Details
January 1942 - 1032.
Comfort station, Picnic Area #1
1942 - 1033.
Brinegar Cabin Spring House Reframing Details
January 1942 - 1034.
Brinegar Cabin - parking area, heavy excavation
January 1942 - 1035.
Brinegar Cabin riving roof boards
January 1942 - 1036.
Brinegar Cabin Spring House Building reconstructed
February 1942 - 1037.
Brinegar Cabin Spring House
February 1942 - 1038.
Brinegar Cabin Store House
February 1942 - 1039.
Snow, Austin-Weston Grader Used to Clear Road
March 1942 - 1040.
Snow, drifts 10-20 ft high
March 1942 - 1041.
Snow. Austin-Weston grader used to clear road
March 1942 - 1042.
Snow WPA Clearing the Road
March 1942 - 1043.
Brinegar cabin restoration Roof boards replaced
March 1942 - 1044.
Ice Rock
June 11, 1942 - 1045.
Ice Rock
June 11, 1942 - 1046.
Narrows at Bluff Park
June 11, 1942 - 1047.
Operator's Sign Approach from S
July 10, 1942 - 1048.
Operator Sign (Lunch room, comfort station)
July 10, 1942 - 1049.
Refreshments Sign
July 10, 1942 - 1050.
Operators Signs
July 10, 1942 - 1051.
Operator Sign, Lunch Room, Comfort Station
July 10, 1942 - 1052.
Operators Signs Approach from N
July 10, 1942 - 1053.
Operator's Sign - Approach from S
July 10, 1942 - 1054.
Operator Sign
July 10, 1942 - 1055.
Operators Signs, Approach from N
July 10, 1942 - 1056.
Operators Sign
July 10, 1942 - 1057.
Operator's Sign Approach from South
July 10, 1942 - 1058.
Operator's Sign
July 10, 1942 - 1059.
Rail Fences
September 11, 1942 - 1060.
Fox Hunters Paradise
September 11, 1942 - 1061.
Parkway
September 11, 1942 - 1062.
Alleghany County
September 11, 1942 - 1063.
Little Glade Pond
September 11, 1942 - 1064.
Ice Rock
September 11, 1942 - 1065.
Little Glade Pond
September 11, 1942 - 1066.
Alleghany County
September 11, 1942 - 1067.
C.K. Marker Stone Cumberland Knob
September 12, 1942 - 1068.
Blocking of grating by leaves
November 6, 1942
Items in Query
County [Remove]
Starting Year [Remove]
Show All Results [Remove]
Ending Year [Remove]
Results: 1068
Refine Your Search
Types (4)
Photographs (1050) Maps (13) Newspaper Articles (3) Drawings, Plans, and Projections (2)Locations (60)
Section 2A (156) Doughton Park (117) Section 2C (111) Cumberland Knob (79) Brinegar Cabin (51) Milepost 224 (33) Milepost 225 (31) Bluff Park (29) Milepost 242 (27) Milepost 229 (26) See All ResultsSections (3)
2C (506) 2A (475) 2B (79)Counties (1)
Alleghany (1068)



