Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Road relocation (pines to be welled)
May 8, 1936 - 2.
Grade crossing, Daniels Gap before revision
May 8, 1936 - 3.
View of Proposed Crossing of NC 18 (2)
June 28, 1936 - 4.
Proposed Crossing of NC 18 (3)
June 28, 1936 - 5.
View from right bank of road looking north showing a pine wooded area through which the parkway travels.
September 11, 1936 - 6.
View looking south along parkway, showing need of guard rail
October 20, 1936 - 7.
Early Construction
February 5, 1937 - 8.
Inlet culvert headwalll
April 1, 1937 - 9.
Overpass construction
May 4, 1937 - 10.
Arch ring
January 10, 1939 - 11.
Bridge at Mulberry Gap
January 10, 1939 - 12.
White pine covered with ice
March 14, 1940 - 13.
Burnt car found on Sec 2E. Full report by Ranger Coombs
July 19, 1940 - 14.
Burnt car found on Sec 2E
July 19, 1940 - 15.
Damage to vehicle. Note points of contrast
February 23, 1941 - 16.
Back of wall. Sample section of guard wall
July 1, 1941 - 17.
Top and inside of wall. Sample section of guard wall.
July 1, 1941 - 18.
Gully and Sheet Erosion
July 1, 1942 - 19.
Scenic Views of the Parkway
1946 - 20.
Mileage Post at Bluff N.C.
1946 - 21.
Cherry Hill Coffee Shop
May 1958 - 22.
Northwest Trading Post
- 23.
Early Construction
- 24.
Cherry Hill Gas Station
Refine Your Search
Types (1)
Photographs (24)Locations (12)
Milepost 248 (5) Section 2D (4) Section 2E (3) Milepost 250 (2) Milepost 257 (2) Milepost 263 (2) Daniels Gap (1) Milepost 251 (1) Milepost 255 (1) Milepost 258 (1) See All ResultsSections (2)
2D (17) 2E (7)Counties (1)
Ashe (24)



