Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Soil Erosion
1941 - 2.
The wrecked car.
February 22, 1941 - 3.
Shows pile of rocks and stumps into which car dove and car at rest after plunge
February 22, 1941 - 4.
Shows road alignment. Figure stands at point of departure
February 22, 1941 - 5.
Shows road alignment. Figure stands at point of departure
February 22, 1941 - 6.
Figure at point wheels left road. Two stakes in foreground point of departure from shoulder
February 22, 1941 - 7.
Point of departure marked by figure; angle of slope, wrecked car at rest
February 22, 1941 - 8.
Shows road alignment, looking back in direction from which car approached. Figure at point of departure
February 22, 1941 - 9.
The wreck, left front view
February 23, 1941 - 10.
Show slope. Figure at top to figure holding white paper, Extreme lower left, marks course
February 23, 1941 - 11.
The wrecked car.
February 23, 1941 - 12.
The wreck, right front view
February 23, 1941 - 13.
Damage to vehicle. Note points of contrast
February 23, 1941 - 14.
Alignment of road. Far figure, wheel of R side; middle figure, start of plunge; near figure, directly above wreck.
February 23, 1941 - 15.
Back of wall. Sample section of guard wall
July 1, 1941 - 16.
Top and inside of wall. Sample section of guard wall.
July 1, 1941 - 17.
Gully control (after)
July 26, 1941 - 18.
Gully control (after)
July 26, 1941 - 19.
Gully control (afer)
July 26, 1941 - 20.
Gully control (after)
July 26, 1941 - 21.
Gully and sheet erosion (mulching with pine)
November 1941 - 22.
Shows active gully and sheet erosion (before)
November 1941 - 23.
Gully control (after) Beng, N.C.
November 1941 - 24.
Gully and sheet erosion (work started)
November 1941
Refine Your Search
Types (1)
Photographs (24)Locations (4)
Milepost 251 (13) Milepost 268 (8) Milepost 263 (2) Section 2E (1)Sections (2)
2D (13) 2E (11)Counties (1)
Ashe (24)



