Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Bluff Park Bridle Trail, looking toward Bluff
January 5, 1936 - 2.
Bluff Park Culvert Grassy Gap Road
January 5, 1936 - 3.
Recreational Area Table and Bench Types: Appalachian Parkway
April 22, 1936 - 4.
Fire hazard reduction along trail. Belle Ridge
April 22, 1937 - 5.
Fishers Peak Park. Proposed lake area from dam. Horse Knob background
April 23, 1937 - 6.
Cumberland Knob Park Picnic Road
May 7, 1937 - 7.
Cumberland Knob Shelter Bldg #89
September 1937 - 8.
Cumberland Park Pump House
January 5, 1938 - 9.
Grade separation, south elevation
July 1938 - 10.
Grade separation Class B masonry and concrete barrel
July 1, 1938 - 11.
West Abutment, Overpass US 21
July 12, 1938 - 12.
Retaining Wall Picnic Area
July 12, 1938 - 13.
Bluff Park from lodge site
July 12, 1938 - 14.
Overpass Structure
August 28, 1938 - 15.
Northwest elevation showing grading.
October 3, 1938 - 16.
Southwest wing and Spandrel Wall Masonry, under men to be removed because of stacking
October 18, 1938 - 17.
Spandrel Wall - Rubble wing wall and concrete vault
October 18, 1938 - 18.
Before grading operation and clean-up, looking north
October 18, 1938 - 19.
Expansion joints at junction of spandrel and wing walls
October 18, 1938 - 20.
Existing building on top of Sharp Top, taken from highest point
October 29, 1938 - 21.
Fire tower and building on top of Sharp Top
October 29, 1938 - 22.
Old barn from Parkway
March 28, 1939 - 23.
Old barn from Parkway
March 28, 1939 - 24.
Old barn from Parkway
March 28, 1939 - 25.
Old buildings to be obliterated
March 28, 1939 - 26.
Barn new construction
March 28, 1939 - 27.
Barn of recent construction
March 28, 1939 - 28.
Old building to be obliterated as seen from Parkway
March 28, 1939 - 29.
Panoramic View from Parkway near Fisher's Peak
May 1939 - 30.
Fire hazard reduction work
May 17, 1939 - 31.
Proposed Dam site from East
May 17, 1939 - 32.
Stream undermining Abutment from upstream
August 1, 1939 - 33.
Undercutting Fill Slopes for Stream Relocation
August 1939 - 34.
Incinerator Construction progress
November 1941 - 35.
Incinerator Construction progress
November 1941 - 36.
Operators Sign
July 10, 1942 - 37.
Operator's Sign
July 10, 1942 - 38.
Operators Signs, Approach from N
July 10, 1942 - 39.
Operator Sign, Lunch Room, Comfort Station
July 10, 1942 - 40.
Operator's Sign - Approach from S
July 10, 1942 - 41.
Operator's Sign Approach from South
July 10, 1942 - 42.
Operators Signs Approach from N
July 10, 1942 - 43.
Operators Signs
July 10, 1942 - 44.
Operator's Sign Approach from S
July 10, 1942 - 45.
Operator Sign
July 10, 1942 - 46.
Refreshments Sign
July 10, 1942 - 47.
Operator Sign (Lunch room, comfort station)
July 10, 1942 - 48.
Layout plans (obsolete)
1956
Refine Your Search
Types (2)
Photographs (46) Drawings, Plans, and Projections (2)Locations (19)
Cumberland Knob (13) Milepost 230 (5) Doughton Park (4) Milepost 229 (3) Bluffs (2) Milepost 163 (2) Milepost 248 (2) Peaks of Otter (2) Section 1W (2) Section 2Q (2) See All ResultsSections (8)
2A (18) 2C (7) 2B (6) 1K (5) 1R (5) 1W (2) 2D (2) 2Q (2)Counties (6)
Alleghany (31) Bedford (5) Floyd (5) Ashe (2) Buncombe (2) Carroll (2)



