Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Regional Sketch Map
1935 - 2.
Special Headwall, 10' x 7' R.C. Box
May 25, 1935 - 3.
Special headwall 10' x 7' R.C. box
May 25, 1935 - 4.
Back of sample wall, showing same stone laid in a more informal treatment, etc
November 13, 1935 - 5.
Box culvert 8' x 6', 15° skew
November 26, 1935 - 6.
Box culvert, 8' x 6', 15° skew
November 26, 1935 - 7.
Stripped area and top soil storage pile
November 26, 1935 - 8.
Top soil stripping operations
November 26, 1935 - 9.
General view of construction rough grading
November 26, 1935 - 10.
Rock filled tiled drain left of center line
November 26, 1935 - 11.
General view construction through low area
November 26, 1935 - 12.
Chimney, clay-mortar stone. Holloway place
February 13, 1936 - 13.
Holloway Place
February 14, 1936 - 14.
Chimney, clay-mortar stone, Holloway place.
February 14, 1936 - 15.
Chimney, dry-laid stone. D. F. Wagoner place.
February 14, 1936 - 16.
Chimney, clay mortar stone, Holloway place. Chimney details showing stone generally found along parkway, Sec 1P through 2F.
February 14, 1936 - 17.
Chimney, clay-mortar stone, Holloway place
February 14, 1936 - 18.
Chimney dry-laid stone. D.F. Wagoner Place
February 14, 1936 - 19.
Chimney, dry-laid stone. D.F. Wagoner place.
February 14, 1936 - 20.
Chimney, clay-mortar stone Holloway place
February 14, 1936 - 21.
Retaining wall, Class B, masonry. See neg# 5951
February 15, 1936 - 22.
Retaining wall class B masonry See #5951
February 15, 1936 - 23.
Retaining wall, class B masonry
February 15, 1936 - 24.
Stone work detail Class B masonry retaining wall See neg# 5951
February 15, 1936 - 25.
Type #1 headwall, single
April 16, 1936 - 26.
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936 - 27.
Arch-cut Stone, Double Box Culvert
April 16, 1936 - 28.
General Ground Conditions Showing Stream Conditions
April 16, 1936 - 29.
General ground conditions showing stream conditions
April 16, 1936 - 30.
Type #1 Headwall, Single
April 16, 1936 - 31.
Arch + cut stone - double box culvert
April 16, 1936 - 32.
Type #3 headwall, single
April 16, 1936 - 33.
General ground conditions, showing erosion
April 16, 1936 - 34.
Picnic area before clearing operations
April 21, 1936 - 35.
Picnic area before clearing
April 21, 1936 - 36.
Cumberland Knob Picnic Area
April 28, 1936 - 37.
Cumberland Knob Picnic Area
April 28, 1936 - 38.
Masonry in retaining wall Class B
April 29, 1936 - 39.
Log Cribbing and Check Dams for Erosion Control
May 25, 1936 - 40.
Special headwall, Type #1 10' x 7' Box
May 25, 1936 - 41.
Cribbing check dams with brush back-fill
May 25, 1936 - 42.
Log Cribbing and Check Dams for Erosion Control
May 26, 1936 - 43.
Log cribbing and check dams for erosion control
May 26, 1936 - 44.
Log cribbing and check for erosion control
May 26, 1936 - 45.
Clearing below Knob, Looking toward Spur
May 30, 1936 - 46.
Open grassy area on Knob, looking west
May 30, 1936 - 47.
Switchback on trail from Cumberland Knob, picnic area to gulley. Creek showing ramps.
May 30, 1936 - 48.
Construction of Crib-Work for Trail
June 2, 1936 - 49.
Completed Trail, Indian Grave Trail
June 15, 1936 - 50.
Cribbing and trail, almost complete "Spur Trail"
June 15, 1936 - 51.
Completed Cribbing "Spur Trail"
June 15, 1936 - 52.
Cribbing of trail, almost complete "Spur Trail"
June 15, 1936 - 53.
Completed Shuttle Trail, Looking Ahead
June 15, 1936 - 54.
Trail Route, Before Construction "Indian Grave Trail"
June 15, 1936 - 55.
Right Hand Beam
July 13, 1936 - 56.
4th switch and rest bench site
July 14, 1936 - 57.
A Step Detail in Indian Grave Trail
July 14, 1936 - 58.
Section of Trail Under Construction - Gully Creek
July 14, 1936 - 59.
Bridge #1 left-handed beam
July 14, 1936 - 60.
Hand-placed rock wall
August 20, 1936 - 61.
Rough Grading Partially Complete
August 25, 1936 - 62.
After stream improvement
August 26, 1936 - 63.
Plant group left of parkway
August 27, 1936 - 64.
Plant group left of parkway
August 27, 1936 - 65.
Close-up of plant group left of parkway
August 27, 1936 - 66.
Rubble gutter treatment at intersection of secondary road
October 13, 1936 - 67.
Detail of rubble gutter and tile underdrain emerging
October 13, 1936 - 68.
Gutter termination at pipe headwall
October 13, 1936 - 69.
General view of road and gutter
October 13, 1936 - 70.
Gutter under construction
October 13, 1936 - 71.
Road alignment looking back
October 13, 1936 - 72.
Detail of rubble gutter - completed
October 13, 1936 - 73.
Crushed stone base for rubble gutter
October 13, 1936 - 74.
Rubble gutter completed
October 13, 1936 - 75.
Hare Mill Pond and road after clean-up
November 10, 1936 - 76.
Parkway at Hare Mill Pond
November 10, 1936 - 77.
Hare Mill Pond and secondary road
November 10, 1936 - 78.
Hand-laid rock embankment
November 11, 1936 - 79.
Hand-placed rock embankment
November 11, 1936 - 80.
Hand-placed rock embankment
November 11, 1936 - 81.
Unmaintained county road parallel to parkway
November 11, 1936 - 82.
Parkway road and parking area
November 11, 1936 - 83.
Crew working in cut
November 11, 1936 - 84.
Ahead on Line
November 11, 1936 - 85.
Looking back at cut and general damage
November 11, 1936 - 86.
Looking back at cut and general damage
November 11, 1936 - 87.
Drop Inlet and Cement Stone Masonry Apron
November 17, 1936 - 88.
General view showing machinery making fill through low wet area
November 25, 1936 - 89.
Bridge at site #7, Steel stringers
March 29, 1937 - 90.
North abutment and stringers
March 29, 1937 - 91.
Bridge at site #7 Steel construction
March 29, 1937 - 92.
Bridge at site #7 Steel construction, looking back from south abutment
March 29, 1937 - 93.
East parapet wall south abutment
March 29, 1937 - 94.
Bridge at Site #7, Steel Construction
March 29, 1937 - 95.
Cutting for telephone line on right-of-way line
March 30, 1937
Refine Your Search
Types (2)
Photographs (94) Maps (1)Locations (20)
Cumberland Knob (18) Milepost 225 (13) Milepost 232 (9) Section 2A (8) Milepost 221 (6) Milepost 226 (6) Milepost 217 (5) Milepost 234 (4) Hare Mill Pond (3) Milepost 227 (3) See All ResultsSections (2)
2A (73) 2B (22)Counties (3)
Alleghany (87) Wilkes (5) Surry (2)