Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Early Construction
November 1, 1935 - 2.
Cumberland Knob Picnic Area
April 28, 1936 - 3.
Cribbing check dams with brush back-fill
May 25, 1936 - 4.
Log cribbing and check for erosion control
May 26, 1936 - 5.
Cumberland Knob waterfall
August 1936 - 6.
A view from the hillside opposite of the entrance to Cumberland Knob Park, looking across the Parkway to the park area
October 1936 - 7.
Bridge No. 4
December 2, 1936 - 8.
Building - razed
January 12, 1937 - 9.
Bridge at Site #7, Steel Construction
March 29, 1937 - 10.
Cumberland Knob Shelter Bldg #89
September 1937 - 11.
Sheds (Torn down by BLRI 2/1/39)
January 18, 1939 - 12.
Equipment office showing oil house
1940 - 13.
Entrance to Park showing sign and crate structure
1940 - 14.
Cumberland Knob Guard Wall
November 18, 1940 - 15.
Parkway motor road blocked with snow, Motorist stalled, Damage to shoulder and slope
March 1947 - 16.
Visitors eating lunch in shelter
1950s
Refine Your Search
Types (1)
Photographs (16)Locations (1)
Milepost 217 (16)Sections (1)
2A (16)Counties (1)
Alleghany (16)



