Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Station 566
1930s - 2.
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935 - 3.
Before grading. 1:1 cut gullying badly; too steep to grass; flatten and round for grass
July 25, 1935 - 4.
Before grading. Showing objectionable effect of uniform slopes and insufficient rounding
July 25, 1935 - 5.
Line Guides
July 23, 1936 - 6.
Shovel loading
July 23, 1936 - 7.
Hand-placed rock wall
August 20, 1936 - 8.
Rock wall on side of road
August 23, 1936 - 9.
Brush Creek Bridge #8, Pier from south
September 16, 1936 - 10.
Brush Creek Bridge #8 Pier
September 16, 1936 - 11.
Bridge #8 Pier
September 16, 1936 - 12.
Stone Cement Gutter
October 5, 1936 - 13.
Detail of rubble gutter and tile underdrain emerging
October 13, 1936 - 14.
Crushed stone base for rubble gutter
October 13, 1936 - 15.
Brush Creek Bridge #8
November 19, 1936 - 16.
Station 563 No 8 Bridge cost $34,053
May 4, 1937 - 17.
After L.D. Grading
October 26, 1939 - 18.
New bridge
November 29, 1973 - 19.
New Bridge
November 29, 1973 - 20.
Brush Creek Bridge