Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Tunnel
1930s - 2.
Shufford Log Barn, Bldg. #596
1930s - 3.
Post construction forces scaling tunnel
1930s - 4.
Road construction
July 8, 1936 - 5.
NC #104 Relocation, Sec 2M Parkway Access Drive
July 25, 1936 - 6.
Road View
August 14, 1936 - 7.
Road Construction
August 14, 1936 - 8.
Toe Ditch
August 14, 1936 - 9.
Super Reliance Grader "Caterpillar"
August 14, 1936 - 10.
Road Construction
August 14, 1936 - 11.
East along 104 NC Station 415
August 14, 1936 - 12.
Tunnel Construction
August 14, 1936 - 13.
Machinery and Hillside
August 14, 1936 - 14.
Road Construction
August 14, 1936 - 15.
Road View
August 14, 1936 - 16.
Road Construction
August 14, 1936 - 17.
Road Construction
August 14, 1936 - 18.
Road View
August 14, 1936 - 19.
Toe Ditch
August 17, 1936 - 20.
View of Parkway
August 17, 1936 - 21.
Construction Equipment
August 17, 1936 - 22.
View of Mountains
August 17, 1936 - 23.
Pipeline
August 17, 1936 - 24.
Proposed Road Construction Site
August 17, 1936 - 25.
Toe Ditch
August 17, 1936 - 26.
Road construction
August 24, 1936 - 27.
Road construction
August 24, 1936 - 28.
Road construction
September 24, 1936 - 29.
Cleared Roadway
September 25, 1936 - 30.
Part Road Grade
September 25, 1936 - 31.
Road Grade and Chestnut Tree
September 25, 1936 - 32.
Rock face and Side Slope
September 25, 1936 - 33.
Proposed Tunnel 1 End
September 25, 1936 - 34.
Bulldozers and Construction
September 25, 1936 - 35.
Mountain Slope Road
September 25, 1936 - 36.
Rock Wall
September 25, 1936 - 37.
Road grading
September 25, 1936 - 38.
Near Entrance Tunnel #1
September 25, 1936 - 39.
Narrow Mountain Road
September 25, 1936 - 40.
Steep Mountain Slope
November 6, 1936 - 41.
Mountain Slope
November 6, 1936 - 42.
Retaining Wall Construction
November 6, 1936 - 43.
Excavation for Masonry Wall
November 6, 1936 - 44.
Sample Wall
November 6, 1936 - 45.
Mountain Slope
November 6, 1936 - 46.
Road on Cliffside
November 9, 1936 - 47.
Blacksmith Shop
November 9, 1936 - 48.
Road Through Rock
November 9, 1936 - 49.
Cemented Rock Wall
November 9, 1936 - 50.
Road Construction
November 9, 1936 - 51.
Through Rough Rock
December 14, 1936 - 52.
North Tunnel Portal
December 14, 1936 - 53.
Proposed Line
December 14, 1936 - 54.
South Tunnel Entrance
December 14, 1936 - 55.
Excavation Cut
December 15, 1936 - 56.
Construction Slope
December 15, 1936 - 57.
Trail
December 15, 1936 - 58.
Rough Road
December 15, 1936 - 59.
Shovel and Tractor
December 15, 1936 - 60.
Cleared Path
December 15, 1936 - 61.
Wagon Drill
December 15, 1936 - 62.
Road and rock pile
February 8, 1937 - 63.
Retaining Wall
February 8, 1937 - 64.
Road and tunnel
February 8, 1937 - 65.
View of road
February 8, 1937 - 66.
Rock cut and tunnel
February 8, 1937 - 67.
View of road
February 8, 1937 - 68.
Cleared ridge
February 10, 1937 - 69.
Cement stone wall
February 10, 1937 - 70.
Retaining Wall
February 10, 1937 - 71.
Ahead along line
February 10, 1937 - 72.
Portal To Tunnel #1
April 22, 1937 - 73.
Tunnel Construction
April 22, 1937 - 74.
View of Road Above Tunnel #2
April 22, 1937 - 75.
Retaining Wall Looking North
April 22, 1937 - 76.
Masonry Wall Building
April 22, 1937 - 77.
Construction on Cement Retaining Wall
April 22, 1937 - 78.
Completed Cement Retaining Wall
April 22, 1937 - 79.
Looking North Through Tunnel #2
April 22, 1937 - 80.
Construction of Tunnel #2
April 22, 1937 - 81.
Looking Through Tunnel #1
April 22, 1937 - 82.
North Through Tunnel #1
April 22, 1937 - 83.
Loading Rock at Retaining Wall
April 22, 1937 - 84.
Drill Operation
April 22, 1937 - 85.
Rock shot
April 23, 1937 - 86.
Linn Tractor dumping
April 23, 1937 - 87.
wagon drilling
April 23, 1937 - 88.
View of Rock Cut
April 23, 1937 - 89.
Rough grade cut
April 23, 1937 - 90.
Center line on Tunnel #1
April 27, 1937 - 91.
Top View of Masonry Wall
May 29, 1937 - 92.
Facing North from Masonry Wall
May 29, 1937 - 93.
Detail of surrounding rocks
May 29, 1937 - 94.
South End of Tunnel 2
August 4, 1937 - 95.
North Entrance of Tunnel 1
August 4, 1937 - 96.
South End of Tunnel 1
August 4, 1937 - 97.
Rock Slide at 576
August 5, 1937 - 98.
Partially Built Retaining Wall at 537
August 5, 1937 - 99.
Right of "North Along Rough Grade at 581-50"
August 5, 1937 - 100.
Quarry Operation for Masonry Material
August 5, 1937 - 101.
North Along Rough Grade at 581-50
August 5, 1937 - 102.
Hoist On A Fordson Tractor
September 9, 1937 - 103.
South Entrance Tunnel #1
September 9, 1937 - 104.
Crushing Plant
September 9, 1937 - 105.
Deep Rock Cut
September 9, 1937 - 106.
Fill Slide
September 9, 1937 - 107.
Rough grade road
September 9, 1937 - 108.
Inside of a Tunnel
October 15, 1937 - 109.
Partially Worked Gradient
October 15, 1937 - 110.
Tunnel entrance and culvert headwall
October 15, 1937 - 111.
Men Grading Slope
October 15, 1937 - 112.
Tunnel #2
October 15, 1937 - 113.
Retaining Wall
October 15, 1937 - 114.
Construction - Crusher
October 21, 1937 - 115.
Mountainside
November 24, 1937 - 116.
View of Route 104
November 24, 1937 - 117.
Inside Tunnel #2
November 24, 1937 - 118.
Private Residues in Forest Areas
1938 - 119.
View of road grade
January 24, 1939 - 120.
Foundation for wall
February 27, 1939 - 121.
Cut at Station 277
February 27, 1939 - 122.
Cleared path
March 31, 1939 - 123.
Wall Site
March 31, 1939 - 124.
Cleared path
March 31, 1939 - 125.
New Cut slope
April 29, 1939 - 126.
Wall Excavation
May 3, 1939 - 127.
Road Construction
May 11, 1939 - 128.
Rock Cut at Station 123-50
May 24, 1939 - 129.
Workers and wall construction
May 24, 1939 - 130.
Rock Drilling
May 24, 1939 - 131.
View of road
August 3, 1939 - 132.
View of road
August 8, 1939 - 133.
View of road
August 8, 1939 - 134.
Rock cut
August 8, 1939 - 135.
Workers at landslide
November 7, 1939 - 136.
Grade Separation - N.C. Rte. 104 Part 2
June 1940 - 137.
Grade Separation - N.C. Rte. 104: Section and Details Part 3
June 1940 - 138.
Grade Separation - N.C. Rte. 104 Part 1 of 3
June 1940 - 139.
Gutter
June 12, 1940 - 140.
Washed Out Fill
August 16, 1940 - 141.
Overpass at Buck Creek Gap
January 21, 1941 - 142.
Rock Wall
February 18, 1941 - 143.
Overpass at Buck Creek Gap
February 18, 1941 - 144.
Rock Wall
February 18, 1941 - 145.
Rock Wall
February 18, 1941 - 146.
Trench
March 28, 1941 - 147.
Overpass Structure, Section 2M
January 1942 - 148.
Rock Embankment
April 10, 1942 - 149.
Rock Embankment
April 10, 1942 - 150.
Fill Slope where Slide Continues, Post Construction
May 6, 1942 - 151.
Spreading Calcium Chloride
July 7, 1942 - 152.
Removing Rock Slide
July 7, 1942 - 153.
Guard post placed by post construction
September 9, 1942 - 154.
Parkway crossing county road
October 22, 1942 - 155.
Tunnel Portal
January 6, 1943 - 156.
Rock slide before removal
February 28, 1945 - 157.
Proposed Line Change on Parkway
March 29, 1945 - 158.
Proposed Line Change on Parkway
March 29, 1945 - 159.
Shovel Working Construction
April 12, 1945 - 160.
Vista and Management Areas
1946 - 161.
Mount Mitchell from the Blue Ridge Parkway
June 1946 - 162.
Water bound base course
August 12, 1946 - 163.
Rolling and brooming water bound base stone and dust
August 27, 1946 - 164.
NC Route 80
October 24, 1946 - 165.
Rock Embankment
June 1947 - 166.
Parkway Service Sign
June 12, 1947 - 167.
Inside Tunnel
June 17, 1947 - 168.
Rock Wall, Project 2M2
February 27, 1951 - 169.
Parkway Land Use Map Section 2-M
1953 - 170.
Wildacres Tunnel
April 11, 1957 - 171.
South Twin Tunnel
June 4, 1957 - 172.
Land Acquisition Maps Section 2-M
- 173.
Tunnel
Refine Your Search
Types (3)
Photographs (166) Maps (4) Drawings, Plans, and Projections (3)Locations (1)
Section 2M (173)Sections (1)
2M (173)Counties (1)
Yancey (173)



