Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Crabtree Falls
20th Century - 2.
Crabtree Falls Nature Walk
20th Century - 3.
Post construction forces scaling tunnel
1930s - 4.
Shufford Cabin Bldg. #616
1930s - 5.
Shufford Log Barn, Bldg. #596
1930s - 6.
Tunnel
1930s - 7.
Buck Creek Falls
August 17, 1935 - 8.
General view from southeast
August 17, 1935 - 9.
Looking over mountain toward Table Rock
August 21, 1935 - 10.
Black Mountain Range
August 21, 1935 - 11.
Road construction
July 8, 1936 - 12.
NC #104 Relocation, Sec 2M Parkway Access Drive
July 25, 1936 - 13.
Machinery and Hillside
August 14, 1936 - 14.
Road Construction
August 14, 1936 - 15.
Road Construction
August 14, 1936 - 16.
Tunnel Construction
August 14, 1936 - 17.
Road Construction
August 14, 1936 - 18.
Road View
August 14, 1936 - 19.
Super Reliance Grader "Caterpillar"
August 14, 1936 - 20.
Road Construction
August 14, 1936 - 21.
Road View
August 14, 1936 - 22.
East along 104 NC Station 415
August 14, 1936 - 23.
Toe Ditch
August 14, 1936 - 24.
Road Construction
August 14, 1936 - 25.
Road View
August 14, 1936 - 26.
Linn Truck
August 17, 1936 - 27.
Toe Ditch
August 17, 1936 - 28.
View of Mountains
August 17, 1936 - 29.
Toe Ditch
August 17, 1936 - 30.
Koehring "Dumptor"
August 17, 1936 - 31.
Construction Equipment
August 17, 1936 - 32.
Proposed Road Construction Site
August 17, 1936 - 33.
View of Parkway
August 17, 1936 - 34.
Pipeline
August 17, 1936 - 35.
Road construction
August 24, 1936 - 36.
Road construction
August 24, 1936 - 37.
Road construction
September 24, 1936 - 38.
Road grading
September 25, 1936 - 39.
Bulldozers and Construction
September 25, 1936 - 40.
Cleared Roadway
September 25, 1936 - 41.
Part Road Grade
September 25, 1936 - 42.
Rock face and Side Slope
September 25, 1936 - 43.
Narrow Mountain Road
September 25, 1936 - 44.
Road Grade and Chestnut Tree
September 25, 1936 - 45.
Mountain Slope Road
September 25, 1936 - 46.
Proposed Tunnel 1 End
September 25, 1936 - 47.
Near Entrance Tunnel #1
September 25, 1936 - 48.
Rock Wall
September 25, 1936 - 49.
Sample Wall
November 6, 1936 - 50.
Steep Mountain Slope
November 6, 1936 - 51.
Excavation for Masonry Wall
November 6, 1936 - 52.
Mountain Slope
November 6, 1936 - 53.
Retaining Wall Construction
November 6, 1936 - 54.
Mountain Slope
November 6, 1936 - 55.
Blacksmith Shop
November 9, 1936 - 56.
Road Construction
November 9, 1936 - 57.
Road Through Rock
November 9, 1936 - 58.
Road on Cliffside
November 9, 1936 - 59.
Cemented Rock Wall
November 9, 1936 - 60.
South Tunnel Entrance
December 14, 1936 - 61.
North Tunnel Portal
December 14, 1936 - 62.
Proposed Line
December 14, 1936 - 63.
Through Rough Rock
December 14, 1936 - 64.
Tunnel Entrance
December 14, 1936 - 65.
Construction Slope
December 15, 1936 - 66.
Trail
December 15, 1936 - 67.
Wagon Drill
December 15, 1936 - 68.
Rough Road
December 15, 1936 - 69.
Shovel and Tractor
December 15, 1936 - 70.
Excavation Cut
December 15, 1936 - 71.
Cleared Path
December 15, 1936 - 72.
View of road
February 8, 1937 - 73.
View of road
February 8, 1937 - 74.
Retaining Wall
February 8, 1937 - 75.
Rock cut and tunnel
February 8, 1937 - 76.
Road and rock pile
February 8, 1937 - 77.
Road and tunnel
February 8, 1937 - 78.
Early construction
February 8, 1937 - 79.
Ahead along line
February 10, 1937 - 80.
Retaining Wall
February 10, 1937 - 81.
Cement stone wall
February 10, 1937 - 82.
Cleared ridge
February 10, 1937 - 83.
Construction on Cement Retaining Wall
April 22, 1937 - 84.
Retaining Wall Looking North
April 22, 1937 - 85.
Completed Cement Retaining Wall
April 22, 1937 - 86.
Looking North Through Tunnel #2
April 22, 1937 - 87.
Masonry Wall Building
April 22, 1937 - 88.
North Through Tunnel #1
April 22, 1937 - 89.
Looking Through Tunnel #1
April 22, 1937 - 90.
Portal To Tunnel #1
April 22, 1937 - 91.
Construction of Tunnel #2
April 22, 1937 - 92.
Drill Operation
April 22, 1937 - 93.
View of Road Above Tunnel #2
April 22, 1937 - 94.
Tunnel Construction
April 22, 1937 - 95.
Loading Rock at Retaining Wall
April 22, 1937 - 96.
Construction of Tunnel #2
April 22, 1937 - 97.
Rough grade cut
April 23, 1937 - 98.
Rock shot
April 23, 1937 - 99.
Linn Tractor dumping
April 23, 1937 - 100.
wagon drilling
April 23, 1937 - 101.
View of Rock Cut
April 23, 1937 - 102.
Center line on Tunnel #1
April 27, 1937 - 103.
Detail of surrounding rocks
May 29, 1937 - 104.
Facing North from Masonry Wall
May 29, 1937 - 105.
Top View of Masonry Wall
May 29, 1937 - 106.
South End of Tunnel 2
August 4, 1937 - 107.
North Entrance of Tunnel 1
August 4, 1937 - 108.
South End of Tunnel 1
August 4, 1937 - 109.
Partially Built Retaining Wall at 537
August 5, 1937 - 110.
Quarry Operation for Masonry Material
August 5, 1937 - 111.
Rock Slide at 576
August 5, 1937 - 112.
Right of "North Along Rough Grade at 581-50"
August 5, 1937 - 113.
North Along Rough Grade at 581-50
August 5, 1937 - 114.
Hoist On A Fordson Tractor
September 9, 1937 - 115.
Fill Slide
September 9, 1937 - 116.
Deep Rock Cut
September 9, 1937 - 117.
South Entrance Tunnel #1
September 9, 1937 - 118.
Rough grade road
September 9, 1937 - 119.
Crushing Plant
September 9, 1937 - 120.
Retaining Wall
October 15, 1937 - 121.
Inside of a Tunnel
October 15, 1937 - 122.
Tunnel entrance and culvert headwall
October 15, 1937 - 123.
Partially Worked Gradient
October 15, 1937 - 124.
Tunnel #2
October 15, 1937 - 125.
Men Grading Slope
October 15, 1937 - 126.
Construction - Crusher
October 21, 1937 - 127.
View of Route 104
November 24, 1937 - 128.
Mountainside
November 24, 1937 - 129.
Inside Tunnel #2
November 24, 1937 - 130.
South wingwall of viaduct during construction
February 15, 1938 - 131.
Stonework on south wingwall of viaduct during construction
February 15, 1938 - 132.
Stonework on south wingwall of viaduct during construction
February 15, 1938 - 133.
Rock spillage in ravine under structure, foreground
March 8, 1938 - 134.
Excessive rock spillage in ravine from cut
March 8, 1938 - 135.
Base of wing wall during construction
March 8, 1938 - 136.
Piers and south abutment during construction
March 28, 1938 - 137.
North portal of #1 tunnel
April 19, 1938 - 138.
Tunnel #2 looking back
June 1938 - 139.
Finish Grading
June 1938 - 140.
View of road grade
January 24, 1939 - 141.
Tunnel near Buck Creek Gap
January 28, 1939 - 142.
Ice formation taken from viaduct
January 29, 1939 - 143.
Foundation for wall
February 27, 1939 - 144.
Cut at Station 277
February 27, 1939 - 145.
Wall Site
March 31, 1939 - 146.
Cleared path
March 31, 1939 - 147.
Cleared path
March 31, 1939 - 148.
New Cut slope
April 29, 1939 - 149.
Wall Excavation
May 3, 1939 - 150.
Road Construction
May 11, 1939 - 151.
Rock Drilling
May 24, 1939 - 152.
Rock Cut at Station 123-50
May 24, 1939 - 153.
Workers and wall construction
May 24, 1939 - 154.
View of road
August 3, 1939 - 155.
Rock cut
August 8, 1939 - 156.
View of road
August 8, 1939 - 157.
View of road
August 8, 1939 - 158.
Workers at landslide
November 7, 1939 - 159.
Looking south on Parkway
1940 - 160.
Looking north on the Parkway
1940 - 161.
Gutter
June 12, 1940 - 162.
Washed Out Fill
August 16, 1940 - 163.
Firetool box (experimental) Marion Unit No.1
September 17, 1940 - 164.
Overpass ringstones
November 18, 1940 - 165.
Overpass ringstones
November 18, 1940 - 166.
Overpass at Buck Creek Gap
January 21, 1941 - 167.
Overpass at Buck Creek Gap
February 18, 1941 - 168.
Rock Wall
February 18, 1941 - 169.
Rock Wall
February 18, 1941 - 170.
Rock Wall
February 18, 1941 - 171.
Trench
March 28, 1941 - 172.
Buck Creek Gap Overpass
January 1942 - 173.
Buck Creek Gap Overpass
January 1942 - 174.
Buck Creek Gap Overpass
January 1942 - 175.
Buck Creek Gap Overpass
January 1942 - 176.
Overpass Structure, Section 2M
January 1942 - 177.
Buck Creek Gap Overpass
January 1942 - 178.
Rock Embankment
April 10, 1942 - 179.
Rock Embankment
April 10, 1942 - 180.
Fill Slope where Slide Continues, Post Construction
May 6, 1942 - 181.
Removing Rock Slide
July 7, 1942 - 182.
Spreading Calcium Chloride
July 7, 1942 - 183.
Guard post placed by post construction
September 9, 1942 - 184.
Mt. Mitchell thru Buck Creek Cap Overpass
September 10, 1942 - 185.
Buck Creek Gap Overpass
September 10, 1942 - 186.
Buck Creek Gap Overpass
September 10, 1942 - 187.
Parkway crossing county road
October 22, 1942 - 188.
Tunnel Portal
January 6, 1943 - 189.
Tunnel #2. East Portal regular landscape development treatment will be sufficient
May 1943 - 190.
Tunnel No. 1, East Portal Regular landscape development treatment will be sufficient Grading and seeding complete
May 1943 - 191.
Tunnel #1. West portal. Regular landscape development will be sufficient. Grading and seeding complete
May 1943 - 192.
Rock slide before removal
February 28, 1945 - 193.
Proposed Line Change on Parkway
March 29, 1945 - 194.
Proposed Line Change on Parkway
March 29, 1945 - 195.
Shovel Working Construction
April 12, 1945 - 196.
Buck Creek Gap Overpass
June 1946 - 197.
Mount Mitchell from the Blue Ridge Parkway
June 1946 - 198.
Buck Creek Gap Overpass
June 1946 - 199.
Below Crabtree Falls
June 1946 - 200.
Water bound base course
August 12, 1946 - 201.
Rolling and brooming water bound base stone and dust
August 27, 1946 - 202.
NC Route 80
October 24, 1946 - 203.
Parkway near Buck Creek Gap
October 24, 1946 - 204.
Rock Embankment
June 1947 - 205.
Parkway Service Sign
June 12, 1947 - 206.
Inside Tunnel
June 17, 1947 - 207.
NC-80 overpass at Buck Creek Gap
1950s - 208.
Rock Wall, Project 2M2
February 27, 1951 - 209.
Slide near Crabtree Meadows
November 1951 - 210.
Slide near Crabtree Meadows
November 1951 - 211.
Slide Near Crabtree Meadows
November 1951 - 212.
Milepost 354
1952 - 213.
Black Mountain Orientation Display
March 3, 1956 - 214.
Crabtree Falls
July 1956 - 215.
Camping
July 3, 1956 - 216.
Wildacres Tunnel
April 11, 1957 - 217.
Singecat Ridge
May 5, 1957 - 218.
South Twin Tunnel
June 4, 1957 - 219.
Pump House #88
October 1957 - 220.
Comfort Station #130
October 1957 - 221.
Comfort Station #132
October 1957 - 222.
Comfort Station #130
October 1957 - 223.
Pump House #88
October 1957 - 224.
Crabtree Falls
1958 - 225.
Crabtree Falls
1958 - 226.
Picnic Party at Crabtree Meadows
1958 - 227.
Outdoor Amphitheater Crabtree Meadows
June 10, 1958 - 228.
Outdoor Amphitheater, Crabtree Meadows
June 10, 1958 - 229.
Outdoor Amphitheater, Crabtree Meadows
June 10, 1958 - 230.
Outdoor Amphitheater, Crabtree Meadows
June 10, 1958 - 231.
Temporary Amphitheater, Crabtree Meadows
June 12, 1958 - 232.
Temporary Amphitheater, Crabtree Meadows
June 12, 1958 - 233.
Mount Mitchell
September 1958 - 234.
Camping at Crabtree Meadows Campground
August 22, 1959 - 235.
Crabtree Falls
August 22, 1959 - 236.
Camping at Crabtree Meadows Campground
August 22, 1959 - 237.
Camping at Crabtree Meadows Campground
August 22, 1959 - 238.
Crabtree Falls
August 22, 1959 - 239.
Crabtree Falls
August 22, 1959 - 240.
Singecat Ridge
October 1959 - 241.
Karl Synder, Seasonal Interpreter (died 12/12/73)
1960s - 242.
Crabtree Falls Nature Walk
1960s - 243.
Crabtree Falls Nature Walk
1960s - 244.
Ranger Naturalist Herb McCullough cutting wood for campfire
August 1965 - 245.
Picnic Party
August 1965 - 246.
District Naturalist Schiffman Leading Singing
August 1965 - 247.
Ranger Naturalist Edmond Deal giving talk
August 1965 - 248.
Ranger Naturalist Edmond Deal giving talk
August 1965 - 249.
District Naturalist Schiffman leading singing
August 1965 - 250.
Picnic Party
August 1965 - 251.
Ranger Naturalist Herb McCullough Cutting Wood for Campfire
August 1965 - 252.
Ranger Naturalist Herb McCullough at Crabtree Amphitheater
August 1965 - 253.
Overpass Over NC 80
August 1971 - 254.
Twin Tunnels, MP 344.7
August 1971 - 255.
Parkway and N.C. 80 at Buck Creek Gap
August 1971 - 256.
Twin Tunnels
August 1971 - 257.
Karl Snyder (Died 12/12/73) Seasonal Interpreter
July 1973 - 258.
Karl Snyder
July 1973 - 259.
Crabtree Meadows campers
July 13, 1973 - 260.
Crabtree Meadows Campers
July 13, 1973 - 261.
Paul Miller, Student Minister
July 24, 1973 - 262.
Paul Miller, Student Minister
July 24, 1973 - 263.
Christian Ministry
July 24, 1973 - 264.
Paul Miller, Student Minister
July 24, 1973 - 265.
Paul Miller, Student Minister
July 24, 1973 - 266.
Crabtree Meadows Coffee Shop (Exterior)
July 28, 1973 - 267.
Crabtree Meadows Shop (exterior)
July 28, 1973 - 268.
Crabtree Meadows Coffee Shop, exterior
July 28, 1973 - 269.
Crabtree Meadows Coffee
July 28, 1973 - 270.
Crabtree Meadows
July 31, 1973 - 271.
Crabtree Meadows
July 31, 1973 - 272.
Crabtree Meadows Campers
July 31, 1973 - 273.
Twin Tunnels - Milepost 344.5
July 31, 1973 - 274.
Crabtree Meadows - Milepost 339.l5
July 31, 1973 - 275.
Interpretative Walk
August 1973 - 276.
Construction Work
September 18, 1973 - 277.
Construction Signs
September 18, 1973 - 278.
Construction Work
September 18, 1973 - 279.
Construction Work
September 18, 1973 - 280.
Construction Signs
September 18, 1973 - 281.
Construction Signs
September 18, 1973 - 282.
Construction Work
September 18, 1973 - 283.
Construction Signs
September 18, 1973 - 284.
Construction Work
September 18, 1973 - 285.
Bridge over N.C. State Route 80
October 21, 1973 - 286.
New Retaining Wall
November 28, 1973 - 287.
New Retaining Wall
November 28, 1973 - 288.
Rock Cut
March 1974 - 289.
Twin Tunnels
March 1974 - 290.
New Wall by Laurel Mtn.
April 1974 - 291.
New Wall by Laurel Mtn.
April 1974 - 292.
New Wall by Laurel Mtn.
April 1974 - 293.
New trailer in Park
April 30, 1974 - 294.
Strange Growth in Tree
April 30, 1974 - 295.
Strange growth in tree
April 30, 1974 - 296.
Dogwood Tree
April 30, 1974 - 297.
New septic tanks
April 30, 1974 - 298.
New trailer in Park
April 30, 1974 - 299.
New park ranger booth - Crabtree
July 4, 1974 - 300.
Rhododendron in campground-trailer park
July 15, 1974 - 301.
Amphi. Program
August 1974 - 302.
Amphi. Program Sea. Int. Peggy Thompson VIP Mike Hensley
August 1974 - 303.
Amphitheater Program, Seasonal Interpreter Peggy Thom, VIP Mike Hensley
August 1974 - 304.
Amphi. Program, VIP Mike Hensley
August 1974 - 305.
Amphi. Program, Mt. Culture
August 1974 - 306.
Amphi. Program Sea. Int. Peggy Thompson
August 1974 - 307.
Amphi. Program Sea. Int. Peggy Thompson VIP Mike Hensley
August 1974 - 308.
Crabtree Meadows Restaurant
August 1974 - 309.
Crabtree Meadows Campground Sign
August 1974 - 310.
Amphi. Program
August 1974 - 311.
Amphi. Program Sea. Int. Peggy Thompson
August 1974 - 312.
Amphi. Program VIP Mike Hensley
August 1974 - 313.
Amphi. Program
August 1974 - 314.
Amphi. Program Sea. Int. Peggy Thompson
August 1974 - 315.
Crabtree Meadows Restaurant
August 1974 - 316.
Crabtree Meadows Restaurant
August 1974 - 317.
Crabtree Meadows Campground Gas Station
August 1974 - 318.
Crabtree Meadows Campground Gas Station
August 1974 - 319.
Amphi Program
August 1974 - 320.
Amphi. Program Sea. Int. Peggy Thompson
August 1974 - 321.
Crabtree Meadows Campground Gas Station
August 1974 - 322.
Crabtree Meadows Campground Gas Station
August 1974 - 323.
Amphi. Program VIP Mike Hensley Sea. Int. Peggy Thompson
August 1974 - 324.
Crabtree Meadow Campground
August 1974 - 325.
Crabtree Meadows Restaurant
August 1974 - 326.
Crabtree Meadows Campground
August 1974 - 327.
Amphi. Program
August 1974 - 328.
Crabtree Meadows Restaurant
August 1974 - 329.
Crabtree Meadow Picnicing
August 1974 - 330.
Amphi. Program
August 1974 - 331.
Crabtree Meadows Restaurant
August 1974 - 332.
Amphi. Program Peggy Thompson Sea. Int.
August 1974 - 333.
Camper and Dog at Crabtree
August 9, 1974 - 334.
Ranger Jim Weedy singing in camper
August 9, 1974 - 335.
Ranger Larry Scott on Nature Hike
August 9, 1974 - 336.
Crabtree Meadows Gas Station
September 1974 - 337.
Shufford Log Barn Bldg. #593
August 21, 1975 - 338.
Shufford Log Spring House - Bldg. #594
August 21, 1975 - 339.
Shufford Log Barn Bldg. #593
August 21, 1975 - 340.
Shufford Log Barn Bldg. #593
August 22, 1975 - 341.
Shufford Log Spring House - Bldg. #594
August 22, 1975 - 342.
Shufford Log Cabin - Bldg. #616
August 22, 1975 - 343.
Shufford Log Barn - Bldg. #593
August 22, 1975 - 344.
Shufford Log Barn - Bldg. #616
August 22, 1975 - 345.
Shufford Double Pen Log Barn Bldg 596
1976 - 346.
Shufford Double Pen Log Barn (S. Crib Corner) - Bldg. #593
April 1977 - 347.
Shufford Springhouse - Bldg #594
April 1977 - 348.
Shufford springhouse (N) - Bldg #594
April 1977 - 349.
Shufford Springhouse (S) - Bldg #594
April 1977 - 350.
Shufford Spring House Bldg. #594
April 1977 - 351.
Shufford Cabin (Ruins) SE Bldg. #616
April 1977 - 352.
Shufford Barn Bldg 593
April 1977 - 353.
Shufford barn (SE) Bldg #593
April 1977 - 354.
Shufford Barn Bldg. #593
April 1977 - 355.
Shufford Springhouse (E) Bldg #594
April 1977 - 356.
Shufford cabin (ruins) Bldg #616 (NW)
April 1977 - 357.
Shufford Springhouse (W) Bldg #594
April 1977 - 358.
Shufford Barn (SW), Bldg. #616
April 1977 - 359.
Shufford Cabin (NW), Ruins, Bldg. #616
April 1977 - 360.
Shufford Cabin (Ruins) - Bldg. #616
April 1977 - 361.
Shufford double pen log barn (N. crib corner) - Bldg #593
April 1977 - 362.
Roadside signs
June 1977 - 363.
Roadside Sign
June 1977 - 364.
Roadside Sign
June 1977 - 365.
Roadside sign
June 1977 - 366.
Roadside signs
June 1977 - 367.
Taping Road Barriers
October 25, 1977 - 368.
Rockslide
October 25, 1977 - 369.
Ranger Assisting Camper
July 1978 - 370.
Refilling box with disposable bags for campers
July 1978 - 371.
Road Sign Along Parkway
July 1978 - 372.
Ranger Assisting Camper
July 1978 - 373.
Refilling Box with Disposal Bags for Campers
July 1978 - 374.
Ranger Assisting Camper
July 1978 - 375.
Ranger assisting camper
July 1978 - 376.
Campers with trailer
July 1978 - 377.
Ranger Assisting Camper
July 1978 - 378.
Ranger assisting camper
July 1978 - 379.
Rangers checking engines on trucks
July 1978 - 380.
Rangers Checking Engines on Trucks
July 1978 - 381.
Tunnel
- 382.
Crabtree Falls Nature Walk
- 383.
Shufford Cabin Bldg #616
- 384.
Black Mt. Range
- 385.
Karl Snyder Seasonal Interpreter
- 386.
Shufford Log Barn Bldg. #593
Refine Your Search
Types (1)
Photographs (386)Locations (13)
Section 2M (166) Crabtree Meadows (118) Milepost 340 (30) Buck Creek Gap (23) Milepost 345 (9) Twin Tunnel #2 (8) Milepost 344 (7) Milepost 346 (6) Milepost 347 (6) Big Laurel Mountain Viaduct (4) See All ResultsSections (1)
2M (386)Counties (2)
Yancey (215) McDowell (163)



