Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Laurel Fork Bridge
20th Century - 2.
Farming, Section 2D
20th Century - 3.
Access road on left of Parkway
1930s - 4.
Middle Fork Bridge Under Construction
1930s - 5.
Middle Fork Bridge Under Construction
1930s - 6.
Grade Separation Structure Rte NC 18 and Parkway
1930s - 7.
Taken from center of overpass
1930s - 8.
Access Road on Left of Parkway
1930s - 9.
Middle Fork Bridge Under Construction
1930s - 10.
Middle Fork Bridge Under Construction
1930s - 11.
Gilam Gap
December 20, 1934 - 12.
Gilam Gap
December 20, 1934 - 13.
Gilam Gap Overlook
December 20, 1934 - 14.
Gillam Gap
May 28, 1935 - 15.
Dry Masonry Fireplace
June 19, 1935 - 16.
Dry Masonry Fireplace
June 19, 1935 - 17.
Mountain Laurel
June 20, 1935 - 18.
Flame Azalea
June 21, 1935 - 19.
Detail Map
1936 - 20.
Early Construction
August 2, 1936 - 21.
Early Construction
August 2, 1936 - 22.
Rock cut near South Fork New River
February 21, 1936 - 23.
Fill and box culvert
May 7, 1936 - 24.
Cut Slopes
May 7, 1936 - 25.
Fill and Box Culvert
May 7, 1936 - 26.
Road relocation (pines to be welled)
May 8, 1936 - 27.
Tree Wall
June 3, 1936 - 28.
County road relocation and crossing
June 3, 1936 - 29.
Early Construction
June 27, 1936 - 30.
Proposed Crossing of NC 18 (3)
June 28, 1936 - 31.
Proposed Parkway Crossing of NC Route 18 (1)
June 28, 1936 - 32.
Proposed Site for Border of Section C and Section D
June 28, 1936 - 33.
View of Proposed Crossing of NC 18 (2)
June 28, 1936 - 34.
Early Construction
July 31, 1936 - 35.
Early Construction
August 1936 - 36.
County Road, vicinity of sec. 2D, looking south over ridges which carry parkway
August 1936 - 37.
Early Construction
August 20, 1936 - 38.
View of log cabin in vicinity of parkway
September 10, 1936 - 39.
Cabin within 100 foot right-of-way of the Parkway.
September 10, 1936 - 40.
View from right bank of road looking north showing a pine wooded area through which the parkway travels.
September 11, 1936 - 41.
Property of Robert L. Doughton Opposite 2D
September 11, 1936 - 42.
Right headwall culvert, Type 3
September 21, 1936 - 43.
View through pine looking south. Rattlesnake Mountain on the right of picture.
October 1936 - 44.
View of typical mountain cabin and surrounding area along road from Jefferson to Glendale Spring, NC (NC route 16)
October 20, 1936 - 45.
Grading, old N.C. #16 crossing
October 20, 1936 - 46.
View of Rattle Snake Mountain looking north. Parkway in lower right-hand portion of picture
October 21, 1936 - 47.
Retaining Wall Construction
November 6, 1936 - 48.
View looking south along Parkway
November 11, 1936 - 49.
Early Construction
February 5, 1937 - 50.
Thoroughfare (left) cut through during winter because of impassibility of proper access road (right)
April 1, 1937 - 51.
Culvert headwall
April 1, 1937 - 52.
Sheets Gap parking overlook
April 1, 1937 - 53.
Inlet culvert headwalll
April 1, 1937 - 54.
Overpass construction
May 4, 1937 - 55.
Overpass Site
May 5, 1937 - 56.
Sheets Gap Parking Overlook
June 6, 1937 - 57.
Pier #1
June 22, 1937 - 58.
Station 15# Pier #4
June 22, 1937 - 59.
Pier #4
June 22, 1937 - 60.
Pier #1
June 22, 1937 - 61.
Tree wells - rhododendrons
July 6, 1937 - 62.
Useless backfill at base of cut slope
July 6, 1937 - 63.
Viaduct west abutment
June 7, 1937 - 64.
Viaduct, Pier #4
July 7, 1937 - 65.
Detail, interior face vaneer wing wall Viaduct
July 7, 1937 - 66.
Viaduct, form work, pier #3
July 7, 1937 - 67.
Viaduct, form work pier #3
July 7, 1937 - 68.
Side view of access road to 2-C-1
July 28, 1937 - 69.
Headwall to be changed to Drop Inlet
August 1937 - 70.
Special headwall
August 1937 - 71.
Headwall placed too near center line.
August 1937 - 72.
Drop inlet
August 20, 1937 - 73.
Viaduct Pier #4
September 12, 1937 - 74.
Viaduct Pier #4
September 12, 1937 - 75.
Viaduct pier #4
September 12, 1937 - 76.
View of viaduct under construction
October 4, 1937 - 77.
View of viaduct under construction
October 4, 1937 - 78.
View of viaduct under construction
October 4, 1937 - 79.
Viaduct under construction
October 13, 1937 - 80.
Viaduct
January 24, 1938 - 81.
South parapet, west abutment
January 24, 1938 - 82.
Viaduct
June 1938 - 83.
Viaduct
June 1938 - 84.
Overpass Structure
August 28, 1938 - 85.
Southwest wing and Spandrel Wall Masonry, under men to be removed because of stacking
October 18, 1938 - 86.
Masonry Detail
January 10, 1939 - 87.
Oblique view
January 10, 1939 - 88.
Ringstones and "Corner Break"
January 10, 1939 - 89.
Oblique View of structure
January 10, 1939 - 90.
Arch ring
January 10, 1939 - 91.
Bridge at Mulberry Gap
January 10, 1939 - 92.
Shed and fence lot. Former owner D.A. Bare
January 20, 1939 - 93.
House, shed type former owner D.A. Bare
January 20, 1939 - 94.
Log House
January 20, 1939 - 95.
Part of shed
January 20, 1939 - 96.
Part of Shed
January 20, 1939 - 97.
Two sheds formerly owned by Glen Miller
January 20, 1939 - 98.
Overpass NC 18
May 19, 1939 - 99.
Horse Gap Overpass
May 19, 1939 - 100.
Building Overpass
September 9, 1938 - 101.
Overpass Structure 2D-4 North Elevation
September 9, 1938 - 102.
Land Acquisition Maps Section 2-D
1940 - 103.
Bridge Structure
1940 - 104.
Northwest Trading Post
1940s - 105.
White pine covered with ice
March 14, 1940 - 106.
White pine covered with ice
March 14, 1940 - 107.
White pine covered with ice
March 14, 1940 - 108.
White Pine Covered with Ice
March 14, 1940 - 109.
The wrecked car.
February 22, 1941 - 110.
Shows road alignment. Figure stands at point of departure
February 22, 1941 - 111.
Figure at point wheels left road. Two stakes in foreground point of departure from shoulder
February 22, 1941 - 112.
Point of departure marked by figure; angle of slope, wrecked car at rest
February 22, 1941 - 113.
Shows road alignment. Figure stands at point of departure
February 22, 1941 - 114.
Shows pile of rocks and stumps into which car dove and car at rest after plunge
February 22, 1941 - 115.
Shows road alignment, looking back in direction from which car approached. Figure at point of departure
February 22, 1941 - 116.
Show slope. Figure at top to figure holding white paper, Extreme lower left, marks course
February 23, 1941 - 117.
Damage to vehicle. Note points of contrast
February 23, 1941 - 118.
The wreck, right front view
February 23, 1941 - 119.
The wrecked car.
February 23, 1941 - 120.
The wreck, left front view
February 23, 1941 - 121.
Alignment of road. Far figure, wheel of R side; middle figure, start of plunge; near figure, directly above wreck.
February 23, 1941 - 122.
Gully and sheet erosion, large pasture with active sheet erosion.
September 1942 - 123.
Typical mountain hay meadow Peak Creek Looking pky south.
Spring 1944 - 124.
Land plowed for corn. S.J. Miller lease. Looking north on pkwy.
Spring 1944 - 125.
Land plowed for corn
Spring 1944 - 126.
Scenic Views of the Parkway
1946 - 127.
Mileage Post at Bluff N.C.
1946 - 128.
Bridges - NC
1946 - 129.
Laurel Fork Bridge
1946 - 130.
"After picture" shows same area controlled by pine brush mulching and seeding to Lespedeza sericea. Before picture neg# 5442
March 1946 - 131.
Parkway Across West Fork of New River near Jefferson, N.C.
June 1946 - 132.
Mountain Laurel
June 1946 - 133.
Parkway Land Use Map Section 2-D
1947 - 134.
Discing on the Rocky Knob District
1950 - 135.
View near Laurel Springs, N.C.
June 1950 - 136.
Underpass at Route #18
June 1950 - 137.
Snow Drift
January 1958 - 138.
Snow Drift
January 1958 - 139.
Sign at R/W on private land. Was later removed thru cooperation of land owner.
May 1958 - 140.
Sign at R/W for "Cherry Hill Coffee Shop"
May 1958 - 141.
Cherry Hill Coffee Shop
May 1958 - 142.
N.W. Trading Post Sign
July 1958 - 143.
Trading Post
July 1958 - 144.
Illuminated Map in N.W. Trading Post
July 1958 - 145.
Trading Post
July 1958 - 146.
N. W. Trading Post
July 1958 - 147.
N.W. Trading Post Sign
July 1958 - 148.
Trading Post, interior
September 19, 1959 - 149.
Trading Post, interior
September 19, 1959 - 150.
Trading Post, interior
September 19, 1959 - 151.
Northwest Trading Post
July 1967 - 152.
Sheets Cabin, MP 258.8
August 1971 - 153.
Sheets Cabin, MP 258.8
August 1971 - 154.
Sheets Cabin
August 1971 - 155.
Sheets Cabin
October 1971 - 156.
Sheets Cabin Bldg. #291
August 22, 1975 - 157.
Sheets Cabin Bldg. #291
August 22, 1975 - 158.
Sheets Cabin Bldg. #291
August 22, 1975 - 159.
Sheets Cabin Bldg. #291
August 22, 1975 - 160.
Sheets Cabin Bldg. 291
August 22, 1975 - 161.
Sheets Cabin Bldg. #291
August 22, 1975 - 162.
Sheets Cabin Bldg. #291
August 22, 1975 - 163.
Sheets Cabin Bldg. #291
August 22, 1975 - 164.
Sheets Cabin Bldg. # 291
August 22, 1975 - 165.
Sheets Cabin
- 166.
Cherry Hill Gas Station
- 167.
Farming, Sec. 2D, Blue Ridge Parkway
- 168.
Early Construction
- 169.
Northwest Trading Post
- 170.
Cherry Hill Coffee Shop
- 171.
Bridge
Refine Your Search
Types (2)
Photographs (168) Maps (3)Locations (20)
Milepost 248 (27) Section 2D (25) Laurel Fork Viaduct (23) Milepost 251 (15) Sheets Cabin (14) Milepost 261 (11) Northwest Trading Post (11) Milepost 257 (9) Milepost 250 (6) Milepost 255 (6) Gillam Gap (4) Milepost 252 (4) Milepost 256 (4) Laurel Springs (3) Milepost 254 (2) Milepost 259 (2) Sheets Gap Overlook (2) Milepost 258 (1) Milepost 260 (1) Old Route NC 16 (1)Sections (1)
2D (171)Counties (2)
Ashe (169) Wilkes (2)



