Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Just West of the Bluff
1930s - 2.
Layout plan, Concession Gas Station Bluff Park
1930s - 3.
View on parkway
1930s - 4.
Ice Rock
1930s - 5.
Trees on trailer
1930s - 6.
NP 21 before planting
1930s - 7.
Building fire place, picnic area #1
1930s - 8.
Trees loaded on trailer
1930s - 9.
Clump maple
1930s - 10.
Ringstone and Corner detail
1930s - 11.
Opposite Woodruff's
1930s - 12.
View from Station 295
1930s - 13.
Guard wall
1930s - 14.
Bank Sloping
1930s - 15.
Guard wall
1930s - 16.
Guard wall
1930s - 17.
Road construction
1930s - 18.
Guard wall
1930s - 19.
Moving trees - CCC
1930s - 20.
Moving trees - CCC
1930s - 21.
Trees on trailer
1930s - 22.
Building the end wall
1930s - 23.
Fireplace
1930s - 24.
Overpass (NC #18) near Mulberry Gap Back
June 20, 1935 - 25.
Overpass near Mulberry Gap (from NC #18 on west)
June 20, 1935 - 26.
Bluff Park Culvert Grassy Gap Road
January 5, 1936 - 27.
Bluff Park Bridle Trail, looking toward Bluff
January 5, 1936 - 28.
The Bluffs, Sec 2C Rhododendron Valley from Inn site (Doughton Park)
August 2, 1936 - 29.
Dry Masonry Stone Foundation, slaty schist.
February 19, 1936 - 30.
Vertical View of Ice Rock
February 26, 1936 - 31.
Overpass at Meadow Fork
March 4, 1936 - 32.
Early Construction
April 17, 1936 - 33.
The Bluff, View of Basin Cedar Ridge
April 20, 1936 - 34.
View of Wagon Drill
May 2, 1936 - 35.
Drilling Operations
May 2, 1936 - 36.
Early Construction
June 26, 1936 - 37.
Early Construction in section 2C
June 26, 1936 - 38.
Completed Rough Grade
July 28, 1936 - 39.
mixer
July 28, 1936 - 40.
steep side hill
July 28, 1936 - 41.
Doughton Park #1
July 28, 1936 - 42.
Roadway
July 29, 1936 - 43.
Early Construction
July 29, 1936 - 44.
Clearing operations
July 29, 1936 - 45.
Meadow Fork - View looking south from edge of parkway
August 1936 - 46.
The Bluffs Sec 2C Wildcat Rocks, Inn site (Doughton Park)
August 3, 1936 - 47.
Wildcat Rocks
August 3, 1936 - 48.
Willow planted along channel change, 10 days after planting
August 13, 1936 - 49.
Mountain slope and construction
August 20, 1936 - 50.
Early Construction
August 21, 1936 - 51.
Early Construction
August 24, 1936 - 52.
View of Head Wall
August 24, 1936 - 53.
Road construction
August 24, 1936 - 54.
Road construction
August 24, 1936 - 55.
Rock slope in woods
August 24, 1936 - 56.
Bluffs Park, view from Wild Cat to Basin Creek
September 1936 - 57.
Side view from parkway near Ice Rocks
September 1936 - 58.
Latest wagon drill in action. View looking south from point toward Bluffs
September 1936 - 59.
View of Rock cut looking south
September 1936 - 60.
View looking south on parkway showing construction and drilling operations
September 10, 1936 - 61.
Valley farm land. This is near but not within sight of the parkway
September 11, 1936 - 62.
View of falls on Basin Creek
September 11, 1936 - 63.
View of wide, open area on top of the Bluffs. Looking north
September 11, 1936 - 64.
Falls in Basin Creek Bluff Park
September 11, 1936 - 65.
View looking north along cut through Ice Rock section of Parkway near Bluffs Park area
September 11, 1936 - 66.
View of the Bluffs from Basin Creek Valley near Alligator Back.
September 11, 1936 - 67.
View looking south along Ice Rock section of parkway
September 11, 1936 - 68.
The Bluffs from point 200 feet from the parkway south of the Bluffs
September 12, 1936 - 69.
Access Road Construction
October 2, 1936 - 70.
Road Grade near NC Route 18
October 4, 1936 - 71.
Mountain Valley and Barn
October 4, 1936 - 72.
Back from Station 5
October 4, 1936 - 73.
Proposed Route 18 Crossing
October 4, 1936 - 74.
Construction of prop. wall
October 4, 1936 - 75.
View of Alligator Back from point down the hill on the east side of the parkway
October 20, 1936 - 76.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 77.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 78.
Icy Rock Cut (4)
October 31, 1936 - 79.
Icy Rock Cut (2)
October 31, 1936 - 80.
Front Head Wall 437
October 31, 1936 - 81.
Right Head Wall 437
October 31, 1936 - 82.
Icy Rock Curve
October 31, 1936 - 83.
Icy Rock Curve (2)
October 31, 1936 - 84.
Icy Rock Cut
October 31, 1936 - 85.
Left Head Wall 437
October 31, 1936 - 86.
Rough Grade Work
October 31, 1936 - 87.
Across Icy Rock Curve
October 31, 1936 - 88.
Icy Rock Cut (3)
October 31, 1936 - 89.
Icy Rock Curve (3)
October 31, 1936 - 90.
View looking north across Ice Rock area
November 11, 1936 - 91.
View from the Bluff looking west along line of Parkway
November 11, 1936 - 92.
View of wide, open area on top of the Bluffs, looking north from point near Wild Cat Rocks
November 11, 1936 - 93.
View on top of the Bluff looking east
November 11, 1936 - 94.
View looking south across Ice Rock toward hand-laid rock embankmen
November 11, 1936 - 95.
Cut, before grading
November 14, 1936 - 96.
Prepared Road
December 5, 1936 - 97.
Stone Wall
December 5, 1936 - 98.
Rock Quarry
December 5, 1936 - 99.
Wood Pile
December 5, 1936 - 100.
Men at HPRE Wall
December 5, 1936 - 101.
Road with Surface Stone
December 5, 1936 - 102.
HPRE Face
December 5, 1936 - 103.
Through Hills
December 5, 1936 - 104.
Rock Cutting
December 5, 1936 - 105.
Rock and Filling
December 7, 1936 - 106.
Road and Parking Area
1937 - 107.
Culvert headwall
April 1, 1937 - 108.
Road fill along edge of rough road
April 13, 1937 - 109.
Rough Grade Rock Fill
April 14, 1937 - 110.
Preparing Sub-Grade
April 14, 1937 - 111.
Sharp Curve Construction
April 14, 1937 - 112.
South End of Quarry
April 14, 1937 - 113.
Loading Holes for Blasting
April 14, 1937 - 114.
Fire hazard reduction along trail. Belle Ridge
April 22, 1937 - 115.
Trail down Belle Ridge
April 22, 1937 - 116.
Hand Placed Rock
May 20, 1937 - 117.
Road Construction
May 26, 1937 - 118.
Wagon Drills
May 26, 1937 - 119.
Hand Placed Rock embankment
May 26, 1937 - 120.
Drilling and Construction
May 26, 1937 - 121.
Icy Rock Curve
May 26, 1937 - 122.
Special drainage structure
June 22, 1937 - 123.
Special drainage structure
June 22, 1937 - 124.
Preparations for Cement Wall
July 28, 1937 - 125.
Dumping of Construction Material for replacing embankment
July 28, 1937 - 126.
Cement Stone Gutter Along Rock Bank
July 28, 1937 - 127.
Head wall and Stone Cement Channel
July 28, 1937 - 128.
Drilling and cleaning for stone wall at 255-35
July 28, 1937 - 129.
Cement Stone Gutter
July 28, 1937 - 130.
Stone steps joining gutter
July 28, 1937 - 131.
Ice Rock Wall
August 18, 1937 - 132.
View of road
September 3, 1937 - 133.
Icy Rock Curve
September 4, 1937 - 134.
Retaining Wall and unfinished slope of Icy Rock
September 4, 1937 - 135.
Culvert Cement Stone Gutter at Station 122-30
September 4, 1937 - 136.
Construction of Gutter at Station 108-60
September 4, 1937 - 137.
Gutter Work along Rock Face
September 4, 1937 - 138.
Stone and iron culvert
September 4, 1937 - 139.
Stone masonry retaining wall
September 4, 1937 - 140.
Road Construction at Station 201-55
September 4, 1937 - 141.
Road Construction at Station 32
September 4, 1937 - 142.
Construction of Gutter at Inlet Towards Station 28
September 4, 1937 - 143.
Icy Rock Retaining Wall with Crane
September 4, 1937 - 144.
Retaining Wall along Icy Rock
September 4, 1937 - 145.
Saddle in campground area looking west before construction
October 8, 1937 - 146.
Takeoff to campground area before construction
October 8, 1937 - 147.
Stone Gutter
October 11, 1937 - 148.
Winding Road
October 11, 1937 - 149.
View of road
October 11, 1937 - 150.
Early Construction
October 11, 1937 - 151.
Paving Gutters
October 11, 1937 - 152.
Automobile on road
October 11, 1937 - 153.
Stone culvert head wall
October 11, 1937 - 154.
Water Channel
October 11, 1937 - 155.
Stone Hillside Work
October 11, 1937 - 156.
View of road
October 11, 1937 - 157.
Access Road to Route 18
October 11, 1937 - 158.
Rock Embankment
October 11, 1937 - 159.
Gutter Construction
October 11, 1937 - 160.
Surfaced Road
October 11, 1937 - 161.
Dirt Road
October 11, 1937 - 162.
Man and a Horse Team
October 12, 1937 - 163.
Dressed Road
October 12, 1937 - 164.
Team of Horses
October 12, 1937 - 165.
View of road
October 12, 1937 - 166.
Unfinished Construction
October 12, 1937 - 167.
Looking through rock cut towards Ice Rock and Bluff
October 13, 1937 - 168.
Looking across Bluff Park toward Little Grandfather Mountain
October 13, 1937 - 169.
Alligator Back
October 15, 1937 - 170.
Alligator Back and Meadow Fork Valley
October 15, 1937 - 171.
Parkway approaching Meadow Fork Valley
October 15, 1937 - 172.
Parkway alignment, Meadow Fork Valley
October 15, 1937 - 173.
Looking back at Alligator Back
October 15, 1937 - 174.
Parkway and Meadow Fork Valley from Bluff
October 15, 1937 - 175.
On top of Bluff. Parkway and Little Grandfather Mt.
October 15, 1937 - 176.
Alligator Back and Meadow Fork Valley
October 15, 1937 - 177.
Ice formations
November 1937 - 178.
Ice Formations
November 1937 - 179.
Ice Formations
November 1937 - 180.
Ice Formations
November 1937 - 181.
Ice formations
November 1937 - 182.
Ice formations
November 1937 - 183.
Road to Lodge (under construction)
November 1937 - 184.
Road to Lodge (under construction)
November 1937 - 185.
Ice Formations
November 1937 - 186.
Icy Road
November 20, 1937 - 187.
Ice Rock
November 20, 1937 - 188.
Roadway near Ice Rock
November 20, 1937 - 189.
Ice Rock Channel and Drainage
November 20, 1937 - 190.
Fill
November 20, 1937 - 191.
Ice Rock
November 20, 1937 - 192.
Surfaced Road
November 20, 1937 - 193.
Ice Rock
November 20, 1937 - 194.
Typical section in snow
November 20, 1937 - 195.
Road Routes
November 22, 1937 - 196.
Land Acquisition Maps Section 2-C
1938 - 197.
NP 21 before planting
1938 - 198.
Sheep Hill Brand Lodge Site and proposed water storage
March 1938 - 199.
Wildcat Rock and Lodge Parking area (proposed)
March 1938 - 200.
Spillage (smaller rock above) from excavation for north abutment of viaduct
March 8, 1938 - 201.
Bridge - Grassy Gap Road
March 12, 1938 - 202.
Road on Top of Hills
March 12, 1938 - 203.
View of road
March 12, 1938 - 204.
The Bluff Crusher and Parkway
March 12, 1938 - 205.
Picnic Table
March 12, 1938 - 206.
Bridge - Grassy Gap Road
March 12, 1938 - 207.
Picnic Table
March 12, 1938 - 208.
Road construction to picnic area
March 12, 1938 - 209.
Forest Clearing
May 11, 1938 - 210.
CCC Camp just moving in
June 1938 - 211.
Dam site and watershed
July 11, 1938 - 212.
Return Cabin Loop to Camping Loop
July 11, 1938 - 213.
Face of Wall in Woods
July 11, 1938 - 214.
Inside of wall parking area
July 11, 1938 - 215.
Retaining Wall Picnic Area
July 12, 1938 - 216.
Bluff Park from lodge site
July 12, 1938 - 217.
Slope on Parkway
July 16, 1938 - 218.
Water Storage Tank, Cabin Area
September 28, 1938 - 219.
Construction Unit Water Storage North End of Dam
September 28, 1938 - 220.
Clearing for Water Supply Reservoir
September 28, 1938 - 221.
Entrance road to lodge site
September 28, 1938 - 222.
Cut before grading
October 2, 1938 - 223.
Cut before grading
October 4, 1938 - 224.
Fill before grading
October 4, 1938 - 225.
Fill Before Grading
October 6, 1938 - 226.
Cut before grading
October 21, 1938 - 227.
Cut before grading
October 21, 1938 - 228.
Cut before grading
October 21, 1938 - 229.
Cut before grading
October 21, 1938 - 230.
Fill, before grading
November 7, 1938 - 231.
Fill, before grading
November 7, 1938 - 232.
Cut, before grading
November 11, 1938 - 233.
Cut before grading, looking back
November 22, 1938 - 234.
Cut before grading, looking back
November 22, 1938 - 235.
Cut before grading, looking back
November 22, 1938 - 236.
Radio tower installation
1939 - 237.
Radio tower installation
1939
Items in Query
Section [Remove]
Starting Year [Remove]
Show All Results [Remove]
Ending Year [Remove]
Results: 237
Refine Your Search
Types (3)
Photographs (234) Maps (2) Drawings, Plans, and Projections (1)Locations (18)
Section 2C (100) Doughton Park (21) Milepost 242 (20) Milepost 237 (18) Milepost 241 (15) Milepost 240 (10) Bluffs (8) Milepost 238 (8) Milepost 239 (8) Bluff Park (7) See All ResultsSections (1)
2C (237)Counties (2)
Alleghany (235) Wilkes (2)



