Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Near Cascade
20th Century - 2.
Storm Scene from Milepost 265
20th Century - 3.
Deep Gap US #60
20th Century - 4.
Cascade
20th Century - 5.
Cascade
20th Century - 6.
Virgil US #60
20th Century - 7.
layout plan grade separation
1930s - 8.
Tompkin's Knob (The Lump in the distance)
1930s - 9.
Log Cabin - Preacher Brown House
1930s - 10.
Cool Spring Baptist Church
1930s - 11.
Toe Wall
1930s - 12.
Cold Spring Mtn.
1930s - 13.
North Portal Tanbark Ridge Tunnel
1930s - 14.
Cold Spring Valley
1930s - 15.
South tunnel portal
1930s - 16.
South tunnel portal
1930s - 17.
The Lump Panorama
December 20, 1934 - 18.
Big Fill to Right of Picture
June 19, 1935 - 19.
Watkins Dome from air
June 19, 1935 - 20.
Overpass location at Benge (back)
June 19, 1935 - 21.
Jeff Anderson and some sample stone, 6 foot rule sample 6
February 21, 1936 - 22.
Grade crossing, Daniels Gap before revision
May 8, 1936 - 23.
Stone Steps W.M.L. Miller's house, possible quarry
May 8, 1936 - 24.
Early Construction
June 28, 1936 - 25.
Handlaid rock embankment
August 14, 1936 - 26.
Hand-laid rock embankment
August 14, 1936 - 27.
Hand-laid rock embankment detail
August 14, 1936 - 28.
Hand-laid rock embankment construction
August 14, 1936 - 29.
Early Construction
August 19, 1936 - 30.
Natural reforestation This is not on the parkway but is within one-half mile of it.
September 10, 1936 - 31.
View of surrounding country taken from edge of parkway looking toward the left or east.
September 11, 1936 - 32.
View looking south along parkway, showing need of guard rail
October 20, 1936 - 33.
Typical country road through North Carolina section of parkway. This is a usual road in good weather.
October 20, 1936 - 34.
View of Tompkin's Knob, looking north. Parkway in middle left of picture.
October 20, 1936 - 35.
Relation of Grading to "the Locusts" after Centerline Revision
October 24, 1936 - 36.
Hand-laid rock embankment after cleanup
October 25, 1936 - 37.
Sand blown up on cut
April 1, 1937 - 38.
Hand-laid rock embankment
April 2, 1937 - 39.
Culvert Headwall
April 2, 1937 - 40.
Hand-laid rock embankment
April 2, 1937 - 41.
Grading at Benge
April 2, 1937 - 42.
Tree well
May 20, 1937 - 43.
Tree wall
May 20, 1937 - 44.
Erosion
May 20, 1937 - 45.
Tree well
May 20, 1937 - 46.
Tree well
May 20, 1937 - 47.
Tree Well
May 20, 1937 - 48.
Erosion
May 20, 1937 - 49.
Erosion
May 20, 1937 - 50.
Falls on Falls Creek
May 25, 1937 - 51.
House, former property of S.H. Boyd after moving by State. Fee simple line just beyond house.
May 25, 1937 - 52.
Timber Cutting by M.C. Biggerstaff
May 27, 1937 - 53.
Timber Cutting by M.C. Biggerstaff
May 27, 1937 - 54.
Timber Cutting by M. C. Biggerstaff
May 27, 1937 - 55.
Timber Cutting by M.C. iggerstaff
May 27, 1937 - 56.
Timber Cutting by M.C. Biggerstaff
May 27, 1937 - 57.
Tree Well Construction
June 16, 1937 - 58.
Tree Well Construction
June 16, 1937 - 59.
Early Construction
July 30, 1937 - 60.
Valley view from post office
August 18, 1937 - 61.
Parking overlook
August 18, 1937 - 62.
Parkway--good example flat slopes and gutter
October 14, 1937 - 63.
Parkway overlook and Nigger Mt (Mt Jefferson)
October 14, 1937 - 64.
Drop inlet set back of gutter
October 14, 1937 - 65.
Parkway overlook and view therefrom
October 14, 1937 - 66.
General view of parkway overlook
October 14, 1937 - 67.
General view of parkway
October 14, 1937 - 68.
Parking overlook and foreground
October 14, 1937 - 69.
Parkway in late afternoon
October 14, 1937 - 70.
Looking off toward Obida
October 14, 1937 - 71.
Parkway--good example flat slopes and gutter
October 14, 1937 - 72.
Parkway in Late Afternoon
October 14, 1937 - 73.
Mountain home site near parkway
October 14, 1937 - 74.
Mountain home site
October 14, 1937 - 75.
Parking Overlook
November 1937 - 76.
Overcast Material
December 15, 1937 - 77.
Overcast material (distant) and fill (foreground)
December 15, 1937 - 78.
Careful and careless land use
May 7, 1938 - 79.
Site for proposed parking area
August 1, 1938 - 80.
North end of former tunnel
November 5, 1938 - 81.
Land Acquisition Maps Section 2-E
1939 - 82.
Part of barn RAZED
January 20, 1939 - 83.
Shed Former owner Don Bare
January 20, 1939 - 84.
Before flood and P.R.A. regrading
May 25, 1939 - 85.
Before flood and P.R.A. regrading
September 25, 1939 - 86.
Before flood and P.R.A. regrading
September 25, 1939 - 87.
Before flood and P.R.A. regrading
September 25, 1939 - 88.
Before flood and PRA regrading
September 25, 1939 - 89.
Cool Springs Baptist Church, Bldg #296
1940s - 90.
Pole Spring House Brown Large room and loft Bldg# 295
1940s - 91.
The Lump
1940s - 92.
South Portal Tanbark Ridge Tunnel
1940s - 93.
Cool Springs Baptist Church, Bldg #396
1940 - 94.
Cool Springs Baptist Church, Bldg #396
1940 - 95.
Old house and shed
1940s - 96.
Preacher Jesse Brown's House (Old log cabin) Bldg# 294
1940s - 97.
Cool Springs Baptist Church, Bldg #296
1940s - 98.
60 foot cut Great quantities of natural ground water have caused much trouble in this cut
July 8, 1940 - 99.
Burnt car found on Sec 2E. Full report by Ranger Coombs
July 19, 1940 - 100.
Burnt car found on Sec 2E
July 19, 1940 - 101.
Parkway slopes
July 26, 1940 - 102.
60 foot cut: Great quantities of natural ground water cause trouble in this cut
July 26, 1940 - 103.
Parkway Slopes
July 26, 1940 - 104.
Parkway slopes
July 26, 1940 - 105.
Portion of Rock Cliff and overhand at proposed parking overlook
July 27, 1940 - 106.
Flood damage. Slide started above Parkway
August 17, 1940 - 107.
Flood Damage
August 17, 1940 - 108.
Jesse Brown Log Spring House Bldg #295
1941 - 109.
Soil Erosion
1941 - 110.
Cool Springs Baptist Church, Bldg #296
1940s - 111.
Cool Springs Baptist Church, Bldg #296
1940s - 112.
Wall and steps - Pedestrian overlook at Falls
June 30, 1941 - 113.
Steps - Pedestrian Over look at Falls
June 30, 1941 - 114.
Top and inside of wall. Sample section of guard wall.
July 1, 1941 - 115.
Back of wall. Sample section of guard wall
July 1, 1941 - 116.
Pasture Restoration (after) Beng, N.C.
July 26, 1941 - 117.
Gully control (after)
July 26, 1941 - 118.
Gully control (after)
July 26, 1941 - 119.
Gully control (afer)
July 26, 1941 - 120.
Pasture Restoration (After)
July 26, 1941 - 121.
Gully Control (after) Beng, N.C.
July 26, 1941 - 122.
Pasture Restoration (after) Watson's land Beng, N.C.
July 26, 1941 - 123.
Gully control (after)
July 26, 1941 - 124.
Gully and sheet erosion work completed
August 1941 - 125.
Severe sheet and some gully erosion (before)
August 1941 - 126.
Gully and sheet erosion (work started)
November 1941 - 127.
Severe sheet and some gully erosion (after) see neg# 5436
November 1941 - 128.
Gully and sheet erosion (mulching with pine)
November 1941 - 129.
Shows active gully and sheet erosion (before)
November 1941 - 130.
Gully control (after) Beng, N.C.
November 1941 - 131.
Gully and Sheet Erosion
July 1, 1942 - 132.
Cascades Overlook
September 11, 1942 - 133.
Cascades
September 11, 1942 - 134.
Cascades Overlook
September 11, 1942 - 135.
Cascades Overlook
September 11, 1942 - 136.
Cascades
September 11, 1942 - 137.
Potential meadow choked with brush
July 2, 1944 - 138.
Haying - an important part of the farm picture
July 4, 1944 - 139.
Good crop land
July 4, 1944 - 140.
Part of 2400' of four strand barbed wire fence constructed by Permittee (Mr. Vannoy).
July 4, 1944 - 141.
Detail of good corner bracing on the fence built by Mr. Vannoy
July 4, 1944 - 142.
"Before picture" shows close-up of severe sheet erosion. "After picture" neg #5443
August 1944 - 143.
Gully and sheet erosion.
August 1944 - 144.
Gully and sheet erosion
August 1944 - 145.
Phoenix Mountain Parking Overlook
1946 - 146.
View From the Lump Parking Overlook
June 1946 - 147.
Overpass at Horse Gap
June 1946 - 148.
The Cascades at Tompkins Knob Area
October 1946 - 149.
The Cascades
October 1946 - 150.
The Cascades
October 1946 - 151.
The Cascades at Tompkins Knob Area
October 1946 - 152.
Parkway Land Use Map Section 2-E
1947 - 153.
During preparatory grading before planting
October 30, 1947 - 154.
Fog in Valley
December 13, 1947 - 155.
Cascades
1950 - 156.
Cascades
1950 - 157.
Storm Scene
June 1950 - 158.
Elk Mountain Parking Overlook
1953 - 159.
Nature Trail Label. Plastic laminated label on metal standard
June 1956 - 160.
Self-Guiding Trail Label Cascades Trail
April 26, 1957 - 161.
Milepost on BRParkway
April 3, 1959 - 162.
Parkway Milepost marker
April 3, 1959 - 163.
Trail Register Box
May 20, 1960 - 164.
Civil War Trench Middle of three
October 9, 1962 - 165.
Civil War Trench - lowest of three
October 9, 1962 - 166.
Civil War Trench - lowest of three, Deep Gap
October 9, 1962 - 167.
Roadside Exhibit E.B. Jeffress Park
June 1968 - 168.
Roadside exhibit E.B. Jeffress Park
June 1968 - 169.
Roadside exhibit
June 1968 - 170.
Dedication Ceremonies E.B. Jeffress Park Dir. Hartzog, speaker
June 27, 1968 - 171.
Dedication Ceremonies, E.B. Jeffress Park, Dir Herzog, speaker
June 27, 1968 - 172.
Dedication ceremonies E.B. Jeffress Park
June 27, 1968 - 173.
Dedication ceremonies E.B. Jeffress Park Mr. Carl Jeffress, speaker
June 27, 1968 - 174.
Dedication ceremonies E.B. Jeffress Park Supt Liles speaker
June 27, 1968 - 175.
Roadside Exhibit - E.B. Jeffress Park
June 27, 1968 - 176.
Dedication ceremonies E.B. Jeffress Park
June 27, 1968 - 177.
Dedication ceremonies E.B. Jeffress Park
June 27, 1968 - 178.
Dedication Ceremonies-E.B. Jeffress Park
June 27, 1968 - 179.
Dedication ceremonies E.B. Jeffress Park
June 27, 1968 - 180.
Roadside Exhibit - Elk Mountain Overlook
1969 - 181.
Roadside Exhibit Elk Mountain Overlook
1969 - 182.
Jesse Brown Cabin
August 1971 - 183.
Cool Spring Baptist Church
August 1971 - 184.
Jesse Brown Cabin, MP 272
August 1971 - 185.
Cool Spring Baptist Church
August 1971 - 186.
Sign - Tomkins Knob Overlook
August 1971 - 187.
Jeffress Park
October 1971 - 188.
Cool Spring Baptist Church (No. 296)
August 9, 1973 - 189.
Jesse Brown Cabin (No. 294)
August 9, 1973 - 190.
Jesse Brown Cabin (No. 294)
August 9, 1973 - 191.
Jesse Brown Springhouse
August 10, 1973 - 192.
Trenches from Civil War
November 29, 1973 - 193.
Jesse Brown Cabin
November 29, 1973 - 194.
Jesse Brown Cabin
November 29, 1973 - 195.
Cool Springs Baptist Church (Jesse Brown)
November 29, 1973 - 196.
Jesse Brown Springhouse
November 29, 1973 - 197.
Sign at Deep Gap
November 29, 1973 - 198.
Trenches from Civil War
November 29, 1973 - 199.
Jesse Brown Cabin - Bldg. #294
August 20, 1975 - 200.
Jesse Brown Cabin - Bldg. #294
August 20, 1975 - 201.
Jesse Brown Cabin Bldg. #294
August 20, 1975 - 202.
Jessee [sic] Brown Cabin Bldg. #294
August 20, 1975 - 203.
Jessee [sic] Brown Cabin - Bldg. #294
August 20, 1975 - 204.
Jesse Brown Cabin Bldg. #294
August 22, 1975 - 205.
Cool Spring Baptist Church Bldg. #296
August 22, 1975 - 206.
Cool Springs Baptist Church Bldg. @#296
August 22, 1975 - 207.
Cool Springs Baptist Church, Bldg. #296
August 22, 1975 - 208.
Jesse Brown Cabin - Bldg. #294
August 22, 1975 - 209.
Jesse Brown Cabin - Bldg. #294
August 22, 1975 - 210.
Jesse Brown Cabin - Bldg. #294
August 22, 1975 - 211.
Jesse Brown Cabin - Bldg. #294
August 22, 1975 - 212.
Cool Spring Baptist Church Bldg. #296
August 22, 1975 - 213.
Jessee [sic] Brown Springhouse - Bldg. #295
August 22, 1975 - 214.
Cool Springs Baptist Church Bldg. #296
August 22, 1975 - 215.
Jessee [sic] Brown Cabin Bldg. #294
August 22, 1975 - 216.
Cool Springs Baptist Church Bldg #296
August 22, 1975 - 217.
Civil War Earthworks
February 1976 - 218.
Civil War Earthworks
February 1976 - 219.
Civil War Earthworks
February 1976 - 220.
Civil War Earthworks
February 1976 - 221.
Civil War Earthworks
February 1976 - 222.
Civil War Earthworks
February 1976 - 223.
Hampton Ashley Trespass Sketch
- 224.
Abutment wall Bridge
- 225.
Roe House after moving by State. Fee simple line just beyond house.
1880s - 226.
Deep Gap Panorama
Refine Your Search
Types (2)
Photographs (220) Maps (3)Locations (22)
Milepost 272 (38) E.B. Jeffress Park (27) Milepost 276 (24) Milepost 271 (16) Section 2E (14) Milepost 270 (13) Milepost 268 (12) Milepost 266 (11) Milepost 267 (11) Milepost 274 (10) See All ResultsSections (1)
2E (223)Counties (3)
Wilkes (148) Ashe (39) Watauga (35)