Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Soil Erosion
1941 - 2.
Jesse Brown Log Spring House Bldg #295
1941 - 3.
Cool Springs Baptist Church, Bldg #296
1940s - 4.
Cool Springs Baptist Church, Bldg #296
1940s - 5.
Wall and steps - Pedestrian overlook at Falls
June 30, 1941 - 6.
Steps - Pedestrian Over look at Falls
June 30, 1941 - 7.
Top and inside of wall. Sample section of guard wall.
July 1, 1941 - 8.
Back of wall. Sample section of guard wall
July 1, 1941 - 9.
Pasture Restoration (after) Watson's land Beng, N.C.
July 26, 1941 - 10.
Gully control (after)
July 26, 1941 - 11.
Gully control (afer)
July 26, 1941 - 12.
Pasture Restoration (after) Beng, N.C.
July 26, 1941 - 13.
Gully Control (after) Beng, N.C.
July 26, 1941 - 14.
Pasture Restoration (After)
July 26, 1941 - 15.
Gully control (after)
July 26, 1941 - 16.
Gully control (after)
July 26, 1941 - 17.
Severe sheet and some gully erosion (before)
August 1941 - 18.
Gully and sheet erosion work completed
August 1941 - 19.
Shows active gully and sheet erosion (before)
November 1941 - 20.
Gully and sheet erosion (mulching with pine)
November 1941 - 21.
Severe sheet and some gully erosion (after) see neg# 5436
November 1941 - 22.
Gully control (after) Beng, N.C.
November 1941 - 23.
Gully and sheet erosion (work started)
November 1941
Refine Your Search
Types (1)
Photographs (23)Locations (9)
Milepost 268 (8) Milepost 267 (3) E.B. Jeffress Park (2) Milepost 263 (2) Milepost 264 (2) Milepost 265 (2) Tomkins Knob (2) Milepost 272 (1) Section 2E (1)Sections (1)
2E (23)Counties (2)
Wilkes (12) Ashe (11)



