Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
The Lump Panorama
December 20, 1934 - 2.
Overpass location at Benge (back)
June 19, 1935 - 3.
Watkins Dome from air
June 19, 1935 - 4.
Big Fill to Right of Picture
June 19, 1935 - 5.
Jeff Anderson and some sample stone, 6 foot rule sample 6
February 21, 1936 - 6.
Stone Steps W.M.L. Miller's house, possible quarry
May 8, 1936 - 7.
Grade crossing, Daniels Gap before revision
May 8, 1936 - 8.
Early Construction
June 28, 1936 - 9.
Hand-laid rock embankment construction
August 14, 1936 - 10.
Hand-laid rock embankment detail
August 14, 1936 - 11.
Hand-laid rock embankment
August 14, 1936 - 12.
Handlaid rock embankment
August 14, 1936 - 13.
Early Construction
August 19, 1936 - 14.
Natural reforestation This is not on the parkway but is within one-half mile of it.
September 10, 1936 - 15.
View of surrounding country taken from edge of parkway looking toward the left or east.
September 11, 1936 - 16.
View of Tompkin's Knob, looking north. Parkway in middle left of picture.
October 20, 1936 - 17.
View looking south along parkway, showing need of guard rail
October 20, 1936 - 18.
Typical country road through North Carolina section of parkway. This is a usual road in good weather.
October 20, 1936 - 19.
Relation of Grading to "the Locusts" after Centerline Revision
October 24, 1936 - 20.
Hand-laid rock embankment after cleanup
October 25, 1936 - 21.
Sand blown up on cut
April 1, 1937 - 22.
Grading at Benge
April 2, 1937 - 23.
Culvert Headwall
April 2, 1937 - 24.
Hand-laid rock embankment
April 2, 1937 - 25.
Hand-laid rock embankment
April 2, 1937 - 26.
Tree well
May 20, 1937 - 27.
Tree Well
May 20, 1937 - 28.
Tree well
May 20, 1937 - 29.
Tree wall
May 20, 1937 - 30.
Erosion
May 20, 1937 - 31.
Tree well
May 20, 1937 - 32.
Erosion
May 20, 1937 - 33.
Erosion
May 20, 1937 - 34.
Falls on Falls Creek
May 25, 1937 - 35.
House, former property of S.H. Boyd after moving by State. Fee simple line just beyond house.
May 25, 1937 - 36.
Timber Cutting by M. C. Biggerstaff
May 27, 1937 - 37.
Timber Cutting by M.C. Biggerstaff
May 27, 1937 - 38.
Timber Cutting by M.C. Biggerstaff
May 27, 1937 - 39.
Timber Cutting by M.C. Biggerstaff
May 27, 1937 - 40.
Timber Cutting by M.C. iggerstaff
May 27, 1937 - 41.
Tree Well Construction
June 16, 1937 - 42.
Tree Well Construction
June 16, 1937 - 43.
Early Construction
July 30, 1937 - 44.
Valley view from post office
August 18, 1937 - 45.
Parking overlook
August 18, 1937 - 46.
General view of parkway overlook
October 14, 1937 - 47.
Parkway--good example flat slopes and gutter
October 14, 1937 - 48.
Parkway in late afternoon
October 14, 1937 - 49.
Parkway overlook and view therefrom
October 14, 1937 - 50.
General view of parkway
October 14, 1937 - 51.
Parkway in Late Afternoon
October 14, 1937 - 52.
Parking overlook and foreground
October 14, 1937 - 53.
Parkway overlook and Nigger Mt (Mt Jefferson)
October 14, 1937 - 54.
Parkway--good example flat slopes and gutter
October 14, 1937 - 55.
Looking off toward Obida
October 14, 1937 - 56.
Mountain home site
October 14, 1937 - 57.
Mountain home site near parkway
October 14, 1937 - 58.
Drop inlet set back of gutter
October 14, 1937 - 59.
Parking Overlook
November 1937 - 60.
Overcast material (distant) and fill (foreground)
December 15, 1937 - 61.
Overcast Material
December 15, 1937 - 62.
Careful and careless land use
May 7, 1938 - 63.
Site for proposed parking area
August 1, 1938 - 64.
North end of former tunnel
November 5, 1938 - 65.
Land Acquisition Maps Section 2-E
1939 - 66.
Shed Former owner Don Bare
January 20, 1939 - 67.
Part of barn RAZED
January 20, 1939 - 68.
Before flood and P.R.A. regrading
May 25, 1939 - 69.
Before flood and PRA regrading
September 25, 1939 - 70.
Before flood and P.R.A. regrading
September 25, 1939 - 71.
Before flood and P.R.A. regrading
September 25, 1939 - 72.
Before flood and P.R.A. regrading
September 25, 1939 - 73.
Preacher Jesse Brown's House (Old log cabin) Bldg# 294
1940s - 74.
Pole Spring House Brown Large room and loft Bldg# 295
1940s - 75.
The Lump
1940s - 76.
South Portal Tanbark Ridge Tunnel
1940s - 77.
Cool Springs Baptist Church, Bldg #396
1940 - 78.
Cool Springs Baptist Church, Bldg #396
1940 - 79.
Old house and shed
1940s - 80.
Cool Springs Baptist Church, Bldg #296
1940s - 81.
Cool Springs Baptist Church, Bldg #296
1940s - 82.
Cool Springs Baptist Church, Bldg #396
1940 - 83.
Cool Springs Baptist Church, Bldg #396
1940 - 84.
Cool Springs Baptist Church, Bldg #296
1940s - 85.
Cool Springs Baptist Church, Bldg #296
1940s - 86.
60 foot cut Great quantities of natural ground water have caused much trouble in this cut
July 8, 1940 - 87.
Burnt car found on Sec 2E
July 19, 1940 - 88.
Burnt car found on Sec 2E. Full report by Ranger Coombs
July 19, 1940 - 89.
Parkway slopes
July 26, 1940 - 90.
60 foot cut: Great quantities of natural ground water cause trouble in this cut
July 26, 1940 - 91.
Parkway slopes
July 26, 1940 - 92.
Parkway Slopes
July 26, 1940 - 93.
Portion of Rock Cliff and overhand at proposed parking overlook
July 27, 1940 - 94.
Flood Damage
August 17, 1940 - 95.
Flood damage. Slide started above Parkway
August 17, 1940 - 96.
Jesse Brown Log Spring House Bldg #295
1941 - 97.
Cool Springs Baptist Church, Bldg #296
1940s - 98.
Cool Springs Baptist Church, Bldg #296
1940s - 99.
Soil Erosion
1941 - 100.
Cool Springs Baptist Church, Bldg #296
1940s - 101.
Cool Springs Baptist Church, Bldg #296
1940s - 102.
Steps - Pedestrian Over look at Falls
June 30, 1941 - 103.
Wall and steps - Pedestrian overlook at Falls
June 30, 1941 - 104.
Back of wall. Sample section of guard wall
July 1, 1941 - 105.
Top and inside of wall. Sample section of guard wall.
July 1, 1941 - 106.
Pasture Restoration (After)
July 26, 1941 - 107.
Gully Control (after) Beng, N.C.
July 26, 1941 - 108.
Gully control (after)
July 26, 1941 - 109.
Pasture Restoration (after) Beng, N.C.
July 26, 1941 - 110.
Gully control (after)
July 26, 1941 - 111.
Pasture Restoration (after) Watson's land Beng, N.C.
July 26, 1941 - 112.
Gully control (after)
July 26, 1941 - 113.
Gully control (afer)
July 26, 1941 - 114.
Gully and sheet erosion work completed
August 1941 - 115.
Severe sheet and some gully erosion (before)
August 1941 - 116.
Shows active gully and sheet erosion (before)
November 1941 - 117.
Gully and sheet erosion (work started)
November 1941 - 118.
Gully and sheet erosion (mulching with pine)
November 1941 - 119.
Gully control (after) Beng, N.C.
November 1941 - 120.
Severe sheet and some gully erosion (after) see neg# 5436
November 1941 - 121.
Gully and Sheet Erosion
July 1, 1942 - 122.
Cascades
September 11, 1942 - 123.
Cascades Overlook
September 11, 1942 - 124.
Cascades
September 11, 1942 - 125.
Cascades Overlook
September 11, 1942 - 126.
Cascades Overlook
September 11, 1942
Items in Query
Section [Remove]
Starting Year [Remove]
Show All Results [Remove]
Ending Year [Remove]
Results: 126
Refine Your Search
Types (2)
Photographs (125) Maps (1)Locations (21)
E.B. Jeffress Park (18) Milepost 268 (12) Milepost 266 (11) Milepost 267 (11) Section 2E (10) Milepost 270 (9) Milepost 271 (9) Milepost 276 (7) Milepost 264 (6) Milepost 262 (5) See All ResultsSections (1)
2E (126)Counties (3)
Wilkes (82) Ashe (33) Watauga (11)



